Ramadani, Novita Cahya (2023) Kajian Proses dan Operasional Instalasi Pengolahan Air (IPA) Kecamatan Sekaran Kabupaten Lamongan. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
03211940000002-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 September 2025. Download (7MB) | Request a copy |
Abstract
SPAM Sekaran adalah salah satu perusahaan penyedia air yang terdapat di Kabupaten Lamongan. SPAM Sekaran memiliki dua unit Instalasi Pengolahan Air (IPA),yaitu IPA 33liter/detik dan IPA 50 liter/detik. Pada saat ini, pelanggan sulit untuk mendapatkan air. Sedangkan kuantitas dan kualitas air perlu dijamin oleh sistem penyediaan air minum sebagaimana terdapat dalam Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 27 Tahun 2016. Tujuan penelitian tugas akhir ini adalah mengevaluasi kualitas air dan unit pengolahan IPA beserta pemanfaatan idle capacity sehingga penyediaan air minum dapat memenuhi syarat kuantitas dan kualitas. Evaluasi kualitas air baku dilakukan dengan mengacu pada baku mutu air kelas I Peraturan Pemerintah Nomor 22 Tahun 2021. Sedangkan evaluasi kualitas air minum mengacu pada Peraturan Menteri Kesehatan Nomor 2 Tahun 2023 dan evaluasi unit pengolahan mengacu pada kriteria desain. Setelah itu, dilakukan perhitungan idle capacity IPA sehingga dihasilkan solusi pemenuhan kebutuhan air pada akhir tahun proyeksi.Parameter air baku yang tidak memenuhi adalah TSS, BOD, COD, DO, amoniak, klorin bebas, minyak dan lemak, deterjen total, fecal coliform, dan total coliform. Sedangkan parameter air produksi yang tidak memenuhi baku mutu air minum adalah pH, sisa klor, dan total coliform. Sebagian unit pengolahan memiliki parameter evaluasi yang tidak memenuhi kriteria desain, kecuali unit intake, bak pengumpul, dan reservoir. Penggunaan koagulan dan disinfektan eksisting juga tidak sesuai dengan hasil jar test dan analisis Breakpoint Chlorination (BPC). Pemenuhan kebutuhan air pelanggan pada tahun 2033 dapat terpenuhi dengan pemanfaatan idle capacity IPA dengan penambahan reservoir berkapasitas 300 m3.
====================================================================================================================================
SPAM Sekaran is one of the water supplier companies that is located in Lamongan. SPAM Sekaran has water treatment plant (WTP) consisting of 33 liters/second WTP and 50 liters/ second WTP. SPAM Sekaran consumer’s are still difficult to access the water. Water supply system must guarantee the quantity and quality of water as mentioned in Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 27 Tahun 2016. The purpose of this research is to evaluate the quality of raw and processed water also the process and operastional of WTP along with the use of idle capacity so that water supply system can meet the requirements of quantity and quality. Evaluation of raw water quality according to the water quality standards Class I based on Peraturan Pemerintah Nomor 22 Tahun 2021. Evaluation of drink water quality according to the standar based on Peraturan Menteri Kesehatan Nomor 2 Tahun 2023 and the evaluation of WTP is based on design criteria. After that, the calculation of idle capacity of the WTP was carried out so it can fullfill the water needs in 2033. The results of the evaluation of raw water quality evaluation showed that several parameters exceeds the Class I standard of raw water quality such as TSS, BOD, COD, DO, ammonia, free chlorine, oil and grease, detergent, fecal coliform, and total coliform. The results of drinking water evaluation showed that some parameters exceeds the standard of drinking water quality such as pH, chlorine residues, and total coliform. Most of parameter of WTP evaluation does not meet the design criteria, except for intake and sump pit tank. The use of coagulants and disinfectants are not equal to the results of jar test and Breakpoint Chlorination (BPC). The water needs of consuments can be met with the utilization of WTP idle capacity and reservoir with 300 m3 capacity.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | BPC, idle capacity, IPA, jar test, reservoir, BPC, idle capacity, jar test, reservoir, WTP |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Environmental Engineering > 25201-(S1) Undergraduate Thesis |
Depositing User: | Novita Cahya Ramadani |
Date Deposited: | 01 Aug 2023 04:57 |
Last Modified: | 01 Aug 2023 04:57 |
URI: | http://repository.its.ac.id/id/eprint/100102 |