Analisis Risiko Keselamatan dan Kesehatan Kerja dengan Metode Hazard Identification, Risk Assessment, and Risk Control (HIRARC) pada Proyek Graha 2 RSI Surabaya

Dewani, Nadya Salsabilla Putri (2023) Analisis Risiko Keselamatan dan Kesehatan Kerja dengan Metode Hazard Identification, Risk Assessment, and Risk Control (HIRARC) pada Proyek Graha 2 RSI Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111940000122_Undergraduate_Thesis.pdf] Text
03111940000122_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 September 2025.

Download (12MB) | Request a copy

Abstract

Kecelakaan kerja adalah bentuk kejadian yang terjadi di luar kontrol individu yang dapat menyebabkan luka ringan, luka berat, serta kematian. Penyebab dari kecelakaan kerja ialah berbagai hal yang berhubungan dengan proyek seperti SDM, alat kerja, serta material yang digunakan. Untuk mencegah hal tersebut, diperlukan manajemen risiko proyek. Manajemen risiko bertujuan untuk mereduksi adanya risiko yang terjadi dengan membuat berbagai usulan mitigasi risikonya. Penelitian ini berfokus pada pengelolaan risiko keselamatan dan kesehatan kerja pada proyek Graha 2 RSI Surabaya. Tujuan penelitian ini adalah mengidentifikasi dan menganalisis risiko yang mungkin terjadi, menilai tingkat risiko serta mengusulkan langkah mitigasi terhadap risiko yang mungkin terjadi. Data yang digunakan pada penelitian ini didapat dari studi pustaka, pra survey, wawancara, dan penyebaran kuesioner. Variabel risiko pada penelitian ini didapat dari studi literatur dan difilter oleh para ahli/praktisi melalui wawancara dan kuesioner. Hazard Identification, Risk Assessment and Risk Control (HIRARC) digunakan sebagai metode analisis data. Hasil Penelitian menunjukkan bahwa risiko kecelakaan kerja yang dominan pada Proyek Pembangunan Graha 2 RSI Surabaya ialah pekerjaan scaffolding dengan risiko terjatuh dari ketinggian, pekerjaan bekisting dengan risiko tertimpa alat atau material, pekerjaan pembesian dengan risiko tersengat listrik, serta pekerjaan atap dengan risiko terjatuh dari ketinggian. Pengendalian berbagai risiko yang dominan pada Proyek Pembangunan Graha 2 RSI Surabaya masuk dalam kategori reduction atau mengurangi risiko yang mungkin akan terjadi dengan cara menyediakan APD yang lengkap dan dalam kondisi yang baik, melakukan pemeriksaan untuk setiap alat dan material yang akan digunakan, memberikan sosialisasi Standar Operasional Prosedure (SOP), menerapkan Standar Operasional Prosedure (SOP), mengadakan pelatihan dan mengimplementasikan SMK3 dengan baik. Setelah melalui serangkaian mitigasi risiko didapatkan nilai residual risk. Residual risk pada pekerjaan scaffolding dengan risiko terjatuh dari ketinggian yang semula extreme (nilai 20) akan turun menjadi low risk (nilai 4). Pada pekerjaan bekisting dengan risiko tertimpa alat atau material yang semula extreme (nilai 20) akan turun menjadi low risk (nilai 2). Pada pekerjaan pembesian dengan risiko tersengat listrik yang semula extreme (nilai 20) akan turun menjadi low risk (nilai 2). Pada pekerjaan atap dengan risiko terjatuh dari ketinggian yang semula extreme (nilai 25) akan turun menjadi low risk (nilai 4).
=================================================================================================================================
Work accident is a form of occurrence that occurs beyond the control of an individual that can cause minor injuries, severe injuries, and death. The causes of work accidents are various things related to projects such as human resources, work tools, and materials used. To prevent this, project risk management is necessary. Risk management aims to reduce the presence of risks by making various risk mitigation proposals. This research focuses on the management of occupational safety and health risks in the Graha 2 RSI Surabaya Project. The purpose of this study was to identify and analyze possible risks, assess risk levels, and propose mitigation measures against possible risks. The data for this study were obtained from library studies, pre-survey studies, interviews, and questionnaire distributions. The risk variables in this study were obtained from literature studies and filtered by experts/practices through interviews and questionnaires. Hazard Identification, Risk Assessment and Risk Control (HIRARC) is used as data analysis methods. The result of the research show that the dominant occupational accident risk in the Graha 2 RSI Surabaya Project is scaffolding work with a risk of falling from altitude, bistling work with a risk of being hit by tools or materials, repair work with a risk of being electrocuted, and roof work at the risk of falling from height. The control of various dominant risk in the Graha 2 RSI Surabaya Development Project fall into the Reduction category or reduces the risk that may occur by providing a complete and good APD, performing inspections for each tool and material to be used, provide socialization of the Standard Operational Procedures (SOP), implementing Standard Operational Procedures (SOP), conducting training and implementing SMK3 properly. After going through a series of risk mitigation, the residual risk value is obtained. Residual risk in scaffolding work with the risk of falling from a height that was originally extreme (value 20) will decrease to low risk (value 4). In formwork work with a risk of being crushed by a tool or material that was originally extreme (value 20) will decrease to a low risk (value 2). Ironing work with an extreme risk of electric shock (value 20) will decrease to low risk (value 2). In roofing work the risk of falling from a height that was originally extreme (value 25) will decrease to a low risk (value4)

Item Type: Thesis (Other)
Uncontrolled Keywords: Risiko, Keselamatan dan Kesehatan Kerja, Manajemen Risiko Proyek, Hazard Identification, Risk Assessment and Risk Control (HIRARC). Risk, Occupational Health and Safety, Project Risk Management, Hazard Identification, Risk Assessment and Risk Control (HIRARC).
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Nadya Salsabilla Putri Dewani
Date Deposited: 02 Aug 2023 01:33
Last Modified: 02 Aug 2023 01:33
URI: http://repository.its.ac.id/id/eprint/100216

Actions (login required)

View Item View Item