Analisis Risiko Proyek Pembangunan Relokasi Jalan Nasional Mempawah-Sungai Duri Kalimantan Barat

Dhuha, Syamsud (2023) Analisis Risiko Proyek Pembangunan Relokasi Jalan Nasional Mempawah-Sungai Duri Kalimantan Barat. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032202189-Master_Thesis.pdf] Text
6032202189-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (5MB) | Request a copy

Abstract

Proyek Pembangunan Relokasi Jalan Nasional Mempawah – Sungai Duri Kalimantan Barat ini berfungsi sebagai pengganti jalan nasional yang nantinya akan terkena dampak pembangunan Pelabuhan Internasional Kijing di Kabupaten Mempawah Propinsi Kalimantan Barat. Panjang relokasi jalan nasional ini sepanjang 6,6 km yang terdiri dari persawahan, perkebunan, sebagian rumah penduduk dan asset milik pemerintah daerah setempat. Kondisi dilapangan saat ini ditemukan beberapa permasalahan yang menghambat pencapaian progress diantaranya adalah pembebasan lahan yang belum selesai, penyerahan design dari owner ke kontraktor belum sepenuhnya, adanya kenaikan harga BBM solar, aspal curah, dan batu pecah. Penelitian ini bertujuan untuk menganalisa tingkat risiko tertinggi dari beberapa risiko yang teridentifikasi. Hal tersebut yang menyebabkan pentingnya studi analisa risiko pada proyek Relokasi Jalan Nasional Mempawah-Sungai Duri Kalimantan Barat.
Metode penelitian ini menggunakan pendekatan kualitatif dan kuantitatif, dimulai dengan identifikasi risiko proyek sejenis, kemudian dilanjutkan dengan uji relevansi risiko yang kemungkinan terjadi dan uji dampak risiko. Metode pengumpulan data dilakukan dengan menyebar kuisioner, focus grup discussion dan wawancara. Selanjutnya dilakukan analisis kuantitatif dengan skenario respon dan Bow Tie Analysis.
Hasil penelitian ini mendapatkan 6 risiko tertinggi dengan berbagai metode respon risiko yaitu kondisi dan data lapangan tidak sesuai dengan desain (mitigasi), perubahan design selama proyek berlangsung (transfer), lahan untuk pekerjaan belum dibebaskan (transfer), gangguan cuaca yang menyebabkan keterlambatan pengerjaan proyek (mitigasi), terjadinya cost overun (mitigasi), dan penurunan margin akibat kenaikan harga material (mitigasi). Biaya kontijensi terjadi sebesar Rp Rp 15.757.472.740 atau 8,34% dari nilai proyek yaitu sebesar Rp. 188.909.724.300.

=======================================================================================================================================

Mempawah – Sungai Duri National Road Relocation Development Project, West Kalimantan, functions as a replacement for the national road which will later be affected by the construction of the Kijing International Port in Mempawah Regency, West Kalimantan Province. The length of the relocation of this national road is 6.6 km which consists of rice fields, plantations, some residents' houses and assets owned by the local regional government. Current conditions in the field found a number of problems hindering the achievement of progress including land acquisition that had not been completed, the design submission from the owner to the contractor was not yet complete, there was an increase in the price of diesel fuel, bulk asphalt and crushed stone. This study aims to analyze the highest level of risk from several identified risks. This is what causes the importance of a risk analysis study on the Mempawah-Sungai Duri National Road Relocation project in West Kalimantan.
This research method uses a qualitative and quantitative approach, starting with the identification of risks of similar projects, then proceed with testing the relevance of risks that may occur and testing the impact of risks. Data collection methods were carried out by distributing questionnaires, focus group discussions and interviews. Furthermore, quantitative analysis was carried out with response scenarios and Bow Tie Analysis
The results of this study found the 6 highest risks with various risk response methods, namely field conditions and data not in accordance with the design (mitigation), design changes during the project (transfer), land for work that has not been acquired (transfer), weather disturbances that cause delays in project work (mitigation), cost overruns (mitigation), and decreased margins due to rising material prices (mitigation). Contingency costs incurred amounting to Rp. 15,757,472,740 or 8.34% of the project value, which is Rp. 188,909,724,300.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Analisis Risiko, Pelabuhan Internasional, Relokasi Jalan Nasional, Mempawah-Sungai Duri Kalimantan Barat Risk Analysis, International Port, National Road Reloaction, Mempawah-Sungai Duri, Kalimantan West
Subjects: T Technology > T Technology (General) > T174.5 Technology--Risk assessment.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: syamsud dhuha
Date Deposited: 30 Jul 2023 16:29
Last Modified: 30 Jul 2023 16:29
URI: http://repository.its.ac.id/id/eprint/100607

Actions (login required)

View Item View Item