Pra-Desain Pembangkit Listrik Combined Cycle 100 MW Menggunakan Liquefied Natural Gas (LNG) dan Co-firing Gas Ammonia Untuk Supply Energi Listrik Pada Nickel Processing Plant Di Morowali, Sulawesi Tengah

Firmansyah, Vicky and Adinarayana, Made Krisna (2023) Pra-Desain Pembangkit Listrik Combined Cycle 100 MW Menggunakan Liquefied Natural Gas (LNG) dan Co-firing Gas Ammonia Untuk Supply Energi Listrik Pada Nickel Processing Plant Di Morowali, Sulawesi Tengah. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 02211940000052_02211940000077-Undergraduate_Thesis.pdf] Text
02211940000052_02211940000077-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (6MB) | Request a copy

Abstract

Indonesia merupakan negara terbesar dalam lingkup konsumsi energi pada kawasan ASEAN, yaitu sebesar 36% dari roral kebutuhan (demand) energi pada kawasan ASEAN pada beberapa tahun terakhir. Salah satu sektor energi yang berpengaruh terhadap hal tersebut adalah energi listrik, karena pada tahun 2019 kebutuhan energi listrik di Indonesa mengalami peningkatan signifikan yang dipengaruhi oleh pertumbuhan ekonomi yang pesat dan juga pertumbuhan tingkat urbanisasi dan industrialisasi. Salah satu industri yang membutuhkan energi listrik dalan jumlah besar adalah industri pengolahan atau pemurnian hasil tambang (smelter). Pada tahun 2019, kebutuhan energi listrik untuk smelter mencapai 4.204,41 megawatt (mW) yang terpasok dari PLTU, PLTG, PLTD, dan lainnya. Kebutuhan listrik yang tinggi ini selaras dengan potensi pemanfaatan cadangan nikel di Indonesia yang mencapai 72 juta ton (52% cadangan dunia). Namun, perkembangan pemanfaatan nikel pada smelter yang memanfaatkan energi listrik dalam jumlah banyak harus diiringi dengan proses konversi energi listrik pada pembangkit listrik yang selaras dengan target rencana pencapaian bauran energi terbarukan di Indonesia (23% pada tahun 2025). Perlu digunakan bahan bakar atau campuran bahan bakar yang menghasilkan emisi karbon yang lebih sedikit dari emisi karbon yang dihasilkan oleh bahan bakar konvensional. Oleh karena itu, pembangkit listrik combined cycle dengan kapasitas 100 mW ini dibuat dengan memanfaatkan bahan bakar LNG (11,5 mmscfd) dan co-firing ammonia (25 mmscfd). Pabrik ini akan dibangun di Morowali, Sulawesi Tengah sebagai pemasok energi listrik pada salah satu smelter di sana. Pabrik ini akan memanfaatkan air laut sebagai media perpindahan panas pada proses vaporasi LNG menjadi berfasa gas dan juga memanfaatan flue gas dari gas turbin sebagai media panas pada proses vaporasi ammonia menjadi berfasa gas. Pabrik ini direncanakan akan mulai beroperasi pada tahun 2026 dan akan berjalan kurang lebih selama 20 tahun untuk memasok energi listrik di salah satu smelter di kawasan Morowali, Sulawesi Tengah. Untuk memenuhi kapasitas produksi tahunan dalam pabrik ini diperlukan CAPEX yang diperkirakan sebesar USD 159.282.142,77 dan OPEX sebesar USD 107.044.377,86. Selain itu juga didapatkan nilai IRR sebesar 22,1%, NPV sebesar USD 49.480.453, dan POT dalam 6,17 tahun, dan nilai BEP sebesar 57%. Berdasarkan aspek perhitungan analisis ekonomi tersebut, maka dapat dinyatakan bahwa pembangkit listrik combined cycle dengan kapasitas 100 mW ini layak untuk didirikan.
=================================================================================================================================
Indonesia is the largest country in the scope of energy consumption in the ASEAN region, which is 36% of the total energy demand in the ASEAN region in recent years. One of the energy sectors that affects this is electrical energy, because in 2019 the need for electrical energy in Indonesia has increased significantly which is influenced by rapid economic growth and also the growth in the level of urbanization and industrialization. One industry that requires large amounts of electrical energy is the mining processing or refining industry (smelter). In 2019, the need for electrical energy for smelters reached 4,204.41 megawatts (mW) supplied from PLTU, PLTG, PLTD, and others. This high electricity demand is in line with the potential utilization of nickel reserves in Indonesia, which reaches 72 million tons (52% of world reserves). However, the development of nickel utilization in smelters that utilize large amounts of electrical energy must be accompanied by a process of converting electrical energy in power plants that is in line with the target of the renewable energy mix achievement plan in Indonesia (23% by 2025). It is necessary to use fuels or fuel mixtures that produce less carbon emissions than carbon emissions produced by conventional fuels. Therefore, this combined cycle power plant with a capacity of 100 mW was built utilizing LNG fuel (11.5 mmscfd) and co-firing ammonia (25 mmscfd). The plant will be built in Morowali, Central Sulawesi as a supplier of electrical energy to one of the smelters there. The plant will utilize seawater as a heat transfer medium in the LNG vaporization process into gas phase and also utilize flue gas from gas turbines as a heat medium in the ammonia vaporization process into gas phase. This plant is planned to start operating in 2026 and will run for approximately 20 years to supply electrical energy in one of the smelters in the Morowali area, Central Sulawesi. To fulfill the annual production capacity in this plant, CAPEX is required which is estimated at USD 159,282,142.77 and OPEX of USD 107,044,377.86. In addition, the IRR value of 22.1%, NPV of USD 49,480,453, and POT in 6.17 years, and BEP value of 57% were also obtained. Based on the calculation aspects of the economic analysis, it can be stated that this combined cycle power plant with a capacity of 100 mW is feasible to be established.

Item Type: Thesis (Other)
Uncontrolled Keywords: Ammonia, cofiring, pembangkit, energi, ammonia, cofiring, power generation, energy
Subjects: T Technology > T Technology (General) > T57.62 Simulation
T Technology > TJ Mechanical engineering and machinery > TJ164 Power plants--Design and construction
T Technology > TP Chemical technology > TP155.5 Chemical plants--Design and construction
T Technology > TP Chemical technology > TP761.L5 Liquefied natural gas
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Chemical Engineering > 24201-(S1) Undergraduate Thesis
Depositing User: Vicky Firmansyah
Date Deposited: 01 Aug 2023 06:56
Last Modified: 01 Aug 2023 06:56
URI: http://repository.its.ac.id/id/eprint/100749

Actions (login required)

View Item View Item