Analisis Risiko Pembangunan Proyek Jaringan Transmisi SUTT-SKTT 150 kV Bangkalan

Hartono, Mario (2023) Analisis Risiko Pembangunan Proyek Jaringan Transmisi SUTT-SKTT 150 kV Bangkalan. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 09211850025005-Master_Thesis.pdf] Text
09211850025005-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (4MB) | Request a copy

Abstract

Salah satu proyek ketenagalistrikan yang dilaksanakan oleh PT. PLN (Persero) UIP JBTB adalah Proyek Pembangunan Jaringan Transmisi Saluran Udara Tegangan Tinggi dan Saluran Kabel Tegangan Tinggi 150 kV Bangkalan yang pelaksanaan konstruksinya pasti akan membentang melewati berbagai macam medan yang memiliki berbagai tingkat risiko di dalam proses pembangunannya. Selain itu proyek pembangunan transmisi merupakan proyek yang sangat kompleks sehingga setiap tahapan memiliki kendala yang berbeda sehingga berpotensi memiliki risiko yang juga tinggi dalam pelaksanaannya. Proses penelitian dengan manajemen risiko akan berdasarkan kepada SNI 8615:2018 ISO 31000:2018 dan SNI IEC/ISO 31010:2016. Proses manajemen risiko dimulai dari penentuan lingkup, konteks dan kriteria risiko kemudian dilanjutkan dengan proses penilaian risiko meliputi identifikasi, analisis, evaluasi risiko serta dilakukan penanganan risiko. Penelitian ini dilaksanakan untuk mengidentifikasi risiko yang muncul dalam penelitian dan merumuskan penanganan risiko yang paling efektif untuk setiap risiko kategori ekstrem, sangat tinggi dan tinggi dari proyek tersebut. Analisis risiko proyek Jaringan Transmisi SUTT-SKTT 150 kV Bangkalan dilakukan dengan metode kualitatif untuk mendapatkan kategori risiko. Pada penelitian, didapatkan 10 risiko yang memiliki kategori sangat tinggi dan tinggi yang merupakan risiko yang tidak bisa ditolelir dan akan dilakukan analisis kuantitatif menggunakan metode Expected Monetary Value sebagai data terukur. Selanjutnya dengan diagram Decision Tree Analysis akan diperoleh beberapa cabang alternatif penanganan risiko yang kemudian akan dianalisis dan diperoleh pilihan penanganan yang paling efektif. Hasil dari penanganan risiko akan dikategorikan menjadi mengurangi, memindahkan, dan menerima risiko serta akan diketahui hasil residual risk melalui uji efektifitas penanganan risiko. Ketiga risiko sangat tinggi pada penelitian ini adalah risiko kinerja kontraktor kurang optimal yang menyebabkan penyelesaian proyek terlambat dengan penanganan risiko yang paling efektif adalah proses penyedia barang/jasa dipilih melalui proses pelelangan yang termasuk ke dalam daftar penyedia terseleksi, untuk risiko keterlambatan persetujuan pengelola jembatan penanganan yang dilakukan adalah melakukan koordinasi dengan pengelola jembatan terkait pembuatan, persetujuan dan re-design detail engineering design, dan risiko keterlambatan serah terima proyek penanganan yang dilakukan adalah mempercepat penyelesaian pending item pekerjaan konstruksi, sertipikasi lahan dan monitoring persyaratan serah terima proyek.
=================================================================================================================================
One of the electricity project implemented by PT. PLN (Persero) UIP JBTB is a construction project of the High Voltage Transmission Network and High Voltage Cable Channel 150 kV Bangkalan. The construction will certainly stretch across various terrains that have various levels of risk in the construction process. In addition, the construction project is a very complex project so that each stage has different obstacles so that it has the potential to have high risks in its implementation. The research process with risk management will be based on SNI 8615:2018 ISO 31000:2018 and SNI IEC/ISO 31010:2016. The risk management process begins with determining the scope, context and risk criteria and then proceeds with the risk assessment process which includes identification, analysis, risk evaluation and risk treatment. This research was conducted to identify the risks that arise in the research and formulate the most effective treatment for each extreme, very high and high risk category of the project. The risk analysis of the Bangkalan Transmission Network project was carried out using a qualitative method to obtain a risk category. In the study, there were 10 risks that had very high and high categories which were risks that cannot be tolerated and a quantitative analysis will be carried out using the Expected Monetary Value method as measured data. Furthermore, with the Decision Tree Analysis diagram, several alternative risk treatment branches will be obtained which will then be analyzed and the most effective treatment options will be obtained. The results of the risk treatment will be categorized into mitigating risk, transferring risks, and accepting risks and the result of residual risk will be known through testing the effectiveness of handling risk treatment. The three very high risks in this study are the risk of suboptimal contractor performance which causes project completion to be late with the most effective risk treatment is the process of selecting goods/services providers through an auction process that is included in the list of selected providers, for the risk of delays in the approval of the bridge management the treatment is carried out by coordinating with the bridge manager regarding the manufacture, approval and redesign of detail engineering design, and the risk of delay in handing over the handling project is carried out by accelerating the completion of pending construction work items, land certification and monitoring project handover requirements.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Decision Tree Analysis, Expected Monetary Value, Manajemen Risiko, Penanganan Risiko, Residual Risk
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > T Technology (General) > T56.8 Project Management
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Mario Hartono
Date Deposited: 03 Aug 2023 06:46
Last Modified: 03 Aug 2023 06:46
URI: http://repository.its.ac.id/id/eprint/100793

Actions (login required)

View Item View Item