Letak Indonesia di wilayah tropis memungkinkan adanya intensitas cahaya matahari yang tinggi sepanjang tahun mengindikasikan tingginya potensi energi matahari untuk pembangkit listrik tenaga surya (PLTS). Dengan potensi tersebut, Indonesia diramalkan dapat mengalami surplus energi dalam beberapa tahun kedepan apabila menggencarkan pembangkit energi baru dan terbarukan, khususnya PLTS. Surplus energi bagi Indonesia dapat dimanfaatkan untuk melaksanakan interkoneksi dan ekspor listrik ke negara lain, salah satunya Singapura. Oleh karena itu, pada penelitian ini akan dilakukan estimasi kapasitas dan konfigurasi pembangunan PLTS di Pulau Ngenang (Batam) sebagai PLTS baru yang dapat menyuplai daerah Batam dan Singapura melalui interkoneksi Batam – Singapura. Simulasi penentuan kapasitas dan konfigurasi PLTS di Pulau Ngenang dilakukan menggunakan software PVSyst sebagai media kalkulasi dan input data. Berdasarkan hasil simulasi dengan luas wilayah yang sama, modul PV jenis monocrystalline dengan central inverter menunjukkan energi pembangkitan dan injeksi ke grid yang lebih tinggi dibanding PV jenis polycrystalline dengan string inverter. Kemampuan pembangkitan energi tersebut ditunjukkan melalui performance ratio (PR), dimana untuk jenis monocrystalline dengan central inverter dapat mencapai angka 79% sementara untuk jenis polycrystalline dengan string inverter mencapai angka 75,7%. Pada penelitian ini juga dipertimbangkan baterai sebagai penyimpanan energi dengan mode operasi peak shaving untuk memitigasi karakteristik intermitensi dari PLTS. Di sisi ekonomi, biaya investasi dengan modul PV mono menunjukkan biaya investasi yang lebih ekonomis yaitu sekitar Rp. 21.358 hingga Rp. 22.299 per Watt sementara untuk biaya investasi PLTS modul PV poli berada pada harga Rp. 23.178 hingga Rp. 24.248 per Watt.
======================================================================================================================================
Indonesia on the tropical region allows for high intensity of sunlight throughout the year, indicating the high potential of solar energy for generating electricity through solar power plants. With this potential, Indonesia is predicted to experience energy surplus in the coming years if it accelerates the development of new and renewable energy, especially solar power plant. The surplus energy can be utilized for interconnection and energy export to other countries, for example Singapore. Therefore, this study estimates the capacity and configuration of PLTS development on Ngenang Island (Batam) as a new PLTS that can supply Batam and Singapore through the Batam-Singapore interconnection. The simulation to determine the capacity and configuration of solar power plant on Ngenang Island is carried out using PVSyst as a input data and calculation tools. Based on the simulation results with the same area, monocrystalline PV modules with central inverters show higher generation and grid injection energy than polycrystalline PV modules with string inverters. The generation performance is shown through the performance ratio (PR), where monocrystalline - central inverters reach 79% of PR while polycrystalline – string inverters reach 75.7% of PR. This study also considers batteries as energy storage with peak shaving operation mode to mitigate the intermittency characteristics of solar power plant. In terms of economics, the investment cost with monocrystalline PV modules shows lower cost of around IDR 21,358 to 22,299 IDR/Watt, while the investment cost of solar power plant with polycrystalline PV modules is priced at 23,178 to 24,248 IDR/Watt.

Item Type: Thesis (Other)
Additional Information: RSE 621.312 44 Sir e-1 2023
Uncontrolled Keywords: Kapasitas, Konfigurasi, Monocrystalline, Polycrystalline, PLTS, PVSyst Capacity, Configuration, Monocrystalline, Polycrystalline, PLTS, PVSyst
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1056 Solar powerplants
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1087 Photovoltaic power generation
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2692 Inverters
T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2941 Storage batteries
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Elite Hotman Talenta Sirait
Date Deposited: 04 Aug 2023 03:42
Last Modified: 15 Nov 2023 08:53
URI: http://repository.its.ac.id/id/eprint/100801

Actions (login required)

View Item View Item