Abstract

Es balok merupakan produk turunan air mentah bersih yang memiliki beragam kegunaan pada perekonomian di masyarakat, mulai dari penggunaan sebagai es batu pada pedagang kecil, pendingin minuman, pengawet buah-buah, hingga pengawet ikan. Pengawetan ikan ternyata merupakan salah satu penyumbang demand terbesar pada industri es balok, dan memiliki tren peningkatan volume tiap tahunnya. Seperti pada wilayah Pacitan, Tulungagung, dan Trenggalek, dimana pada tahun 2021 jumlah ikan tangkap laut meningkat 4,4 kali lipat menjadi 48.030 ton dibandingkan pada 2013 sebesar 10.846 ton. Namun peningkatan demand ini tidak sepenuhnya bisa dipenuhi oleh industri es balok akibat keterbatasan kapasitas. Sehingga ekspansi pemain dalam industri es balok memiliki peluang tersendiri. Dan kesempatan ini ditangkap oleh PT X sebagai perusahaan produsen es balok, untuk melakukan ekspansi dengan membangun pabrik baru di Kabupaten Pacitan. Untuk memastikan rencana ekspansi ini layak dilakukan maka peneliti menyusun penelitian yang mempelajari kelayakan dan risiko finansial pada pembangunan pabrik es di Kabupaten Pacitan. Hasil dari penelitian kelayakan finansial adalah NPV sebesar Rp86.858.451.009, IRR sebesar 35%, dan PP dicapai dalam 4 tahun 8 bulan 12 hari. Parameter kelayakan finansial menunjukkan pembangunan pabrik PT di Kabupaten Pacitan layak untuk dijalankan. Hal ini didukung dengan hasil simulasi NPV-at-risk dengan iterasi sebanyak 5.000 kali, menunjukkan probabilitas NPV bernilai kurang dari nol hanya sebesar 2,5%. Untuk risiko-risiko yang paling berdampak pada nilai NPV ini adalah biaya pembangunan / CAPEX dan OPEX pada tahun pertama pabrik beroperasi
======================================================================================================================================
Block ice is a product derived from clean raw water that has various uses in the economy in the community, ranging from being used as ice cubes for small traders, beverage coolers, fruit preservatives, to fish preservatives. Preserved fish turns out to be one of the biggest demand contributors to the ice block industry and has a trend of increasing volume every year. Such as in the Pacitan, Tulungagung, and Trenggalek regions, where in 2021 the number of marine fish caught will increase 4.4 times to 48,030 tons compared to 2013 of 10,846 tons. However, this increase in demand cannot be fully met by the block ice industry due to limited capacity. So, the expansion of players in the block ice industry has its own opportunities. And this opportunity was seized by PT X as an ice block production company, to expand by building a new factory in Pacitan Regency. To ensure that this expansion plan is feasible, the researchers compiled a study that studied the feasibility and financial risks of building an ice factory in Pacitan Regency. The results of the financial feasibility study are that the NPV is IDR 86,858,451,009, the IRR is 35%, and PP is achieved in 4 years 8 months 12 days. The financial feasibility parameter shows that the construction of a PT factory in Pacitan Regency is feasible to run. This is supported by the results of the NPV-at-risk simulation with 5,000 iterations, showing that the probability of an NPV being less than zero is only 2.5%. The risks that have the most impact on the NPV value is construction costs / CAPEX and OPEX in the first year the plant operates

Item Type: Thesis (Other)
Uncontrolled Keywords: Financial Feasibility, Ice Factory, IRR, Kelayakan Finansial, NPV, NPV-at-risk, Pabrik Es, PP
Subjects: H Social Sciences > HG Finance > HG4028.V3 Valuation. Economic value
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Industrial Engineering > 26201-(S1) Undergraduate Thesis
Depositing User: Kevin Surija
Date Deposited: 08 Aug 2023 01:26
Last Modified: 08 Aug 2023 01:26
URI: http://repository.its.ac.id/id/eprint/101827

Actions (login required)

View Item View Item