Rahardi, Ramadhany Faishal Tsany (2022) Analisa Efisiensi HP IP Desain Turbin dengan Turbin Unit 5 dan Turbin Unit 6 pada Pembangkit Listrik Tenaga Uap PT. Indonesia Power Suralaya PGU. Project Report. [s.n.], [s.l.]. (Unpublished)
Text
10211910010009-Project_Report.pdf - Accepted Version Restricted to Repository staff only Download (5MB) | Request a copy |
Abstract
PT.Indonesia Power Suralaya PGU sedang melakukan overhaul pada 2 unit yaitu unit 5 dan 6. Pada magang industri yang dilakukan maka dengan menganalisis bagaimana perbandingan efisiensi turbin desain dengan turbin unit 5 dan turbin unit 6.
===========================================================================================================================
PT. Indonesia Power Suralaya PGU is carrying out an overhaul of 2 units, namely units 5 and 6. In the industrial internship carried out, by analyzing how the efficiency of the design turbine compares with the turbine unit 5 and turbine unit 6.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Turbin.Efficiency.Overhaul |
Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ164 Power plants--Design and construction T Technology > TJ Mechanical engineering and machinery > TJ165 Energy storage. T Technology > TJ Mechanical engineering and machinery > TJ174 Maintenance and repair of machinery |
Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
Depositing User: | Ramadhany Faishal Tsany Rahardi |
Date Deposited: | 02 Aug 2023 01:08 |
Last Modified: | 02 Aug 2023 01:08 |
URI: | http://repository.its.ac.id/id/eprint/102302 |
Actions (login required)
View Item |