Perencanaan Dan Perhitungan Biaya, Estimasi Waktu Serta Metode Pelaksanaan Pada Pembangunan Proyek Gedung Kampus Its Manyar Menggunakan Konstuksi Modular Dengan Pengaplikasian BIM

Trisnadewi, Hana (2023) Perencanaan Dan Perhitungan Biaya, Estimasi Waktu Serta Metode Pelaksanaan Pada Pembangunan Proyek Gedung Kampus Its Manyar Menggunakan Konstuksi Modular Dengan Pengaplikasian BIM. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111910010081-Undergraduate_Thesis.pdf] Text
10111910010081-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (14MB) | Request a copy

Abstract

Pesatnya kemajuan teknologi saat ini membuat manusia berbondong- bondong menghasilkan suatu inovasi baru untuk mempermuda pekerjaan mereka. Salah satunya contoh perkembangan teknologi di bidang infrastruktur adalah dengan memakai Building Information Modeling (BIM) yang bisa membantu dalam perencanaan biaya serta volume pekerjaan. Dalam konstruksi pembangunan, diperlukan sesuatu metode agar hasil pelaksanaan sesuai dengan apa yang diinginkan, terutama dalam konteks biaya, waktu dan pelaksanaan. Modern Metohods of Contruction (MMC) merupakan proses yang berfokus pada teknik konstruksi di luar lokasi, dan perakiran pabrik, sebagai alternatif dari bangunan konvensional. Salah satu jenis MMC adalah metode modular. Proyek pembangunan Gedung Kampus ITS Manyar ini bersifat penelitian dari pengembangan desain gedung modular setinggi 23 lantai untuk memenuhi kebutuhan high rise bulding di Indonesia. Pada tugas akhir ini bertujuan memberikan inovasi terkait Pembangunan Gedung Baru 23 lantai Kampus ITS Manyar menggunakan konstruksi modular dan dibantu dengan pengaplikasian BIM. Konstruksi modular sendiri, dimana pembuatan modul dari bangunan yang sama diproduksi di pabrik, dan pada saat yang sama lokasi konstruksi dapat mengerjakan pekerjaan lainnya yang dimana faktor tersebut berdampak paling besar terhadap produktivitas industri konstruksi. Pada perencanaan dan perhitungan terkait Pembangunan Gedung Baru 23 lantai Kampus ITS Manyar dengan permodelan pengaplikasian Building Infromation Modelling (BIM) dengan mengguankan aplikasi Tekla 2022 dengan output visualisasi 4D, analisa biaya dan estimasi yang telah dilakukan, didapatkan biaya sebesar Rp283.825.272.939,00 dan didapatkan estimasi waktu selama 280 hari kerja. Tugas akhir ini juga membahas metode pelaksanaan dari konstuksi modular, maka dari itu tugas akhir dapat membantu memberikan inovasi pembangunan Gedung Kampus ITS Manyar.
====================================================================================================================================
The rapid advancement of technology is currently making people flock to produce new innovations to make their work easier. One example of technological developments in the infrastructure sector is the use of Building Information Modeling (BIM) which can assist in planning costs and volume of work. In construction construction, a method is needed so that the implementation results are in accordance with what is desired, especially in the context of cost, time and implementation. Modern Construction Methods (MMC) is a process that focuses on off-site factory construction techniques, and assembly, as an alternative to conventional buildings. One type of MMC is the modular method.
The construction project for the ITS Manyar Campus Building is research in nature from the development of a 23-floor modular building design to meet the needs of high-rise buildings in Indonesia. This final project aims to provide innovation related to the Construction of a New 23-floor Building on the ITS Manyar Campus using modular construction and assisted by the application of BIM. Modular construction itself, where modules of the same building are produced in a factory, and at the same time construction can carry out other work where these factors have the greatest impact on the productivity of industrial construction. In the planning and calculations related to the Construction of the New 23-floor Building of the ITS Manyar Campus with the application of Building Information Modeling (BIM) modeling using the Tekla 2022 application with 4D visualization output, cost analysis and estimates that have been carried out, obtained a cost of IDR Rp283.825.272.939,00and the estimated time obtained for 280 working days. This final project also discusses the implementation method of modular construction, therefore the final project can help provide innovation in the construction of the ITS Manyar Campus Building.

Item Type: Thesis (Other)
Uncontrolled Keywords: BIM, Modular, Konstruksi. Biaya, Waktu. BIM,Modular,Construction,Cost, Time.
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > TH438.13 Building information modeling.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Hana Trisnadewi
Date Deposited: 14 Aug 2023 05:48
Last Modified: 14 Aug 2023 05:48
URI: http://repository.its.ac.id/id/eprint/104631

Actions (login required)

View Item View Item