Analisis Teknis dan Ekonomis Implementasi Sistem Pemeliharaan Terencana untuk Kapal Keruk

Ilhami, Muhammad Aidil (2023) Analisis Teknis dan Ekonomis Implementasi Sistem Pemeliharaan Terencana untuk Kapal Keruk. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04111840000018-Undergraduate_Thesis.pdf] Text
04111840000018-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (3MB) | Request a copy

Abstract

Kapal Keruk memiliki outfitting yang kompleks, jam operisonal yang tinggi serta sistem pemeliharaan terencana belum diterapkan pada kapal keruk. Hal ini membuat kapal keruk rentan mengalami kerusakan. Untuk memastikan kapal mendapatkan pemeliharaan yang baik dan terjadwal di tengah tingginya jam operasional kapal maka diperlukan sebuah sistem pemeliharaan yang dapat melakukan monitoring agar kapal melakukan pemeliharaan sesuai dengan jadwal yang telah ditentukan pemilik kapal. Berdasarkan hal tersebut, pada Tugas Akhir ini akan melakukan observasi sistem pemeliharaan terencana yang telah diterapkan saat ini dan menerapkan Sistem Pemeliharaan Terencana berbasis teknologi informasi beserta dengan analisis teknis dan analisis kelayakan ekonosmnya. Sistem ini biasa dikenal dengan Planned Maintanance System (PMS) dimana suatu sistem custom made software atau paper-based system diciptakan untuk setiap unit kapal secara unik (tak sama persis antara suatu kapal dengan kapal lainnya) yang membantu pemilik kapal atau operator kapal untuk melakukan segala bentuk pemeliharaan kapal yang bersifat membantu dalam pencegahan dan perencanaan. Untuk merealisasikan hal tersebut maka dilakukanlah penelitian mengenai impelementasi Sistem Pemeliharaan Terencana. Metode pertama dari penelitian ini adalah melakukan analisis teknis mengenai perbandingan sistem pemeliharaan existing dan sistem pemeliharaan terencana untuk mengetahui kekurangan dan kelebihan dari impelementasi sistem pemeliharaan terencana yang dibuat. Tugas akhir ini juga melakukan analisis mengenai aspek ekonomis untuk mendapatkan kisaran biaya investasi dan kelayakan dari investasi teknologi informasi yang diperlukan untuk mengimplementasikan sistem pemeliharaan terencana dengan metode unit price. Dari hasil penelitian ini dapat disimpulkan pendekatan pemeliharaan secara struktur dan sistematis, membantu dalam menjadwalkan dan melacak tugas pemeliharaan serta memastikan bahwa tugas dilakukan secara teratur serta kebutuhan investasi awal untuk mengimplementasian Sistem Pemeliharaan Terencana untuk Kapal keruk adalah Rp.15.500.000,00 berikut biaya operasional hosting server setiap bulan adalah Rp3.087.292,50.
===============================================================================================================================
The dredger has complex outfitting, high operating hours, and a planned maintenance system has not been applied to the dredger. This makes the dredger vulnerable to damage. To ensure that the ship gets good and scheduled maintenance during the high operating hours of the ship, a maintenance system is needed that can monitor so that the ship carries out maintenance according to the schedule determined by the ship owner. Based on those backgrounds, this Final Project will observe the existing planned maintenance system that has been implemented and implement a Planned Maintenance software-based a long with technical analysis and economic feasibility analysis. This system is commonly known as the Planned Maintenance System (PMS) where a custom-made software or paper-based system is created for each ship unit uniquely (not the same from one ship to another) which helps ship owners or ship operators to do everything. form of ship maintenance that is helpful in prevention and planning. To realize this, research was conducted on the implementation of the Planned Maintenance System. The first method of this research is to conduct a technical analysis of the comparison of the existing maintenance system and the planned maintenance system to determine the advantages and disadvantages of implementing the planned maintenance system. The Final Project also analyzes the economic aspects to obtain the range of investment costs and the feasibility of the information technology investment needed to implement a planned maintenance system using unit price method. Reffered to the result of research, it could be concluded that a structured and systematic approach to maintenance, helped in scheduling and tracking maintenance tasks also ensured the tasks were carried out regularly along with the initial investment required for implementing a Planned Maintenance System for Dredgers was IDR 15,500,000.00 also monthly server hosting operational costs was IDR 3,087,292.50.

Item Type: Thesis (Other)
Uncontrolled Keywords: Dredger, Maintenance, Planned Maintenance System, Cost, Kapal Keruk, Pemeliharaan, Sistem Pemeliharaan Terencana, Biaya
Subjects: V Naval Science > V Naval Science (General)
V Naval Science > VC Naval Maintenance > VC 270-279 Equipment of vessels, supplier,allowances,etc
V Naval Science > VC Naval Maintenance
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM156 Naval architecture
Divisions: Faculty of Marine Technology (MARTECH) > Naval Architecture and Shipbuilding Engineering > 36201-(S1) Undergraduate Thesis
Depositing User: Muhammad Aidil Ilhami
Date Deposited: 07 Sep 2023 07:44
Last Modified: 07 Sep 2023 07:44
URI: http://repository.its.ac.id/id/eprint/104678

Actions (login required)

View Item View Item