Abstract

Pompa merupakan suatu mesin yang berfungsi untuk memindahkan fluida melalui sisttem perpipaan dengan cara merubah energi mekanis menjadi energi fluida dan tekanan. Terdapat banyak jenis pompa yang terdapat di industri, khususnya pada instalasi penjernihan air bersih PDAM. Maka dibutuhkan pompa yang sesuai dengan kapasitas dan head yang diperlukan untuk mengalirkan fluida cair melewati berbagi macam sistem perpipaan. Distribusi air bersih dari SPAM Sembayat menuju JIIPE dibutuhkan kapasitas 600 lps, dengan menggunakan 2 pompa yang dioprasikan secara paralel. Tujuan proyek akhir ini diharapkan dapat memilih pompa yang sesuai. Sehingga Kebutuhan air pada kawasan industri JIIPE, Manyar, Gresik dalam kondisi normal adalah 600 lps. Dimana kondisi existing SPAM Sembayat telah menyediakan 3 lokasi pompa. Sehingga pada proyek akhir ini bagaimana merancang instalasi pompa yang sesuai dengan kebutuhan GWT JIIPE tersebut. Dengan permasalahan yang ada di SPAM Sembayat menuju JIIPE maka solusi dari permasalahan tersebut adalah sebagai berikut Merencanakan diameter pipa yang digunakan, Perhitungan head effektif instalasi air bersih, Pemilihan pompa dan menentukan titik kerja operasi paralel 2 pompa. Hal ini dapat ditentukan dengan cara melakukan perhitungan meliputi penentuan diameter awal pipa, menentukan material pipa yang dibutuhkan, menghitung kecepatan aliran air didalam pipa, menghitung headloss mayor didalam pipa, menentukan headloss minor didalam pipa, menentukan head total pada setiap pipa, menentukan headloss total pada instalasi pipa, menentukan head effektif instalasi. Maka dari hal tersebut dapat ditarik sebuah kesimpulan Pada Instalasi Perpipaan PDAM yang terjadi di SPAM Reservoar Sembayat menuju JIIPE pompa yang direkomendasikan adalah jenis pompa Wilo SCP 250-450HA, dikarenakan pada pompa ini memiliki karakteristik Q = 1260 m^3/h, H = 50 m, dan Power = 250 KW. Sehingga pompa ini mampu menyalurkan air PDAM yang telah terpasang pada sistem instalasi perpipaan hingga connection line. Apabila dihubungkan melalui jalur perpipaan menuju GWT JIIPE dengan menggunakan kombinasi bahan pipa berupa Steel Pipe STD Wall dan HDPE SDR 21 dengan diameter pipa 600 mm maka dapat disimpulkan
=======================================================================================================================================
A pump is a machine that functions to move fluids through a piping system by converting mechanical energy into fluid energy and pressure. There are many types of pumps in the industry, especially in PDAM clean water purification installations. Then a pump is needed that is in accordance with the capacity and head needed to flow liquid fluid through various types of piping systems. The distribution of clean water from PDAM Sembayat to JIIPE requires a capacity of 600 lps, using 2 pumps operating in parallel. The purpose of this final project is expected to be able to choose the appropriate pump. So that the water requirement in the JIIPE industrial area, Manyar, Gresik under normal conditions is 600 lps. Where the existing condition of Sembayat PDAM has provided 3 pump locations. So in this final project how to design a pump installation that fits the needs of the JIIPE GWT. With the problems that exist in PDAM Sembayat towards JIIPE, the solution to these problems is as follows: Planning the diameter of the pipes used, Calculation of the effective head of the clean water installation, Selection of pumps and determining the working point of parallel operation of 2 pumps. This can be determined by carrying out these calculations including determining the initial diameter of the pipe, determining the required pipe material, calculating the velocity of water flow in the pipe, calculating the major head loss in the pipe, determining the minor head loss in the pipe, determining the total head in each pipe, determining the total head loss in pipe installation, determine the effective head of the installation. So from this a conclusion can be drawn in the PDAM Piping Installation that occurs at the Sembayat Reservoar SPAM towards JIIPE the recommended pump is the Wilo SCP 250-450HA type pump, because this pump has characteristics Q = 1260 m^3/h, H = 50 m, and Power = 250 KW. So that this pump is able to distribute PDAM water that has been installed on the piping installation system to the connection line. If it is connected via a pipeline to GWT JIIPE using a combination of pipe materials in the form of Steel Pipe STD Wall and HDPE SDR 21 with a pipe diameter of 600 mm, it can be concluded.

Item Type: Thesis (Other)
Uncontrolled Keywords: Kapasitas, Head, Pompa; Capacity, Head, Pump
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ903 Pumping machinery.
Divisions: Faculty of Vocational > Mechanical Industrial Engineering (D4)