Desain Modifikasi Struktur Gedung Hotel Holiday Inn Sanur Dengan Metode Beton Pracetak Sesuai SNI 2847:2019

Fikri, Muhammad Husaini (2022) Desain Modifikasi Struktur Gedung Hotel Holiday Inn Sanur Dengan Metode Beton Pracetak Sesuai SNI 2847:2019. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111840000101-Undergraduate_Thesis.pdf] Text
03111840000101-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2024.

Download (17MB) | Request a copy

Abstract

Gedung Hotel Holiday Inn Sanur merupakan sebuah gedung yang terletak di Bali yang dibangun menggunakan metode beton cast in-situ. Penggunaan beton cast in-situ dapat menghasilkan limbah konstruksi, limbah tersebut disebabkan oleh beberapa faktor antara lain material yang tidak sesuai spesifikasi, keterlambatan jadwal pengerjaan, dan pekerja yang kurang terampil. Tentunya hal tersebut memunculkan ketidakefisienan dalam pekerjaan konstruksi. Pemilihan metode konstruksi sangatlah berpengaruh terhadap hasil pekerjaan yang efisien dalam segi waktu maupun biaya. Adanya kemajuan teknologi berdampak terhadap munculnya alternatif pilihan metode konstruksi yang lebih modern sebagai pengganti metode konvensional, salah satunya yaitu metode konstruksi beton pracetak. Beton pracetak memiliki beberapa manfaat untuk mengatasi limbah yang dihasilkan oleh penggunaan metode beton cast in-situ. Penggunaan beton pracetak akan efektif dan efisien apabila diterapkan pada pekerjaan yang bersifat massal dan berulang. Dengan melihat sisi manfaat dari penggunaan metode beton pracetak, gedung Hotel Holiday Inn Sanur akan direncanakan ulang dengan menggunakan metode beton pracetak dengan guna menghasilkan suatu rancangan gedung yang lebih cepat dan efisien tanpa mengurangi mutu aslinya. Dalam perencanaan ulang gedung Hotel Holiday Inn Sanur ini, akan dilakukan perubahan jumlah lantai dari semua 5 lantai menjadi 15 lantai, dan menggunakan sistem struktur berupa sistem ganda kombinasi sistem rangka pemikul momen khusus dengan dinding geser beton bertulang. Perencanaan ulang ini akan mengacu pada beberapa peraturan yang berlaku, seperti SNI 2847:2019, SNI 1726:2019, SNI 1727:2020, dan untuk menambah referensi mengenai standar pelaksanaan beton pracetak, digunakan PCI Handbook, 2004. Elemen beton yang dimodifikasi dengan beton pracetak antara lain, pelat, balok dan kolom yang akan disambung menggunakan sambungan basah dengan memanfaatkan panjang penyaluran tulangan dan bantuan sambungan mekanis seperti splice sleeve dan COPRA anchoring coupler. Elemen beton selain kolom akan difabrikasi dalam bentuk half slab dan half beam yang akan diberi tambahan cor basah diatasnya ketika sudah berada di tempat akhir guna membentuk sambungan yang monolit.
========================================================================================================================================
The Holiday Inn Sanur Hotel building is a building located in Bali which was built using the cast in-situ concrete method. The use of cast in-situ concrete can produce construction waste, the waste is caused by several factors, including materials that do not meet specifications, delays in work schedules, and unskilled workers. Of course, this raises inefficiency in construction work. The choice of construction method is very influential on the results of work that is efficient in terms of time and cost. The existence of technological advances has an impact on the emergence of alternative choices of more modern construction methods as a substitute for conventional methods, one of which is the precast concrete construction method. Precast concrete has several benefits to overcome the waste generated using cast in-situ concrete method. The use of precast concrete will be effective and efficient when applied to jobs that are bulk and repetitive. By looking at the benefits of using the precast concrete method, the Holiday Inn Sanur Hotel building will be re-planned to use the precast concrete method in order to produce a faster and more efficient building design without compromising its original quality. In the re-planning of the Hotel Holiday Inn Sanur, there will be a change in the number of floors from all 5 floors to 15 floors, and using a structural system in the form of a dual system combination of a special moment resisting frame system with reinforced concrete shear walls. This re-planning will refer to several applicable regulations, such as SNI 2847:2019, SNI 1726:2019, SNI 1727:2020, and to add references to the standard implementation of precast concrete, PCI Handbook, 2004 is used. Modified concrete elements with precast concrete include plates, beams and columns that will be connected using wet joints by utilizing the length of reinforcement distribution and mechanical connection such as splice sleeve and COPRA anchoring coupler. Concrete elements other than columns will be fabricated in the form of half slabs and half beams which will be added with wet cast on top when they are in the final place to form a monolithic connection.

Item Type: Thesis (Other)
Uncontrolled Keywords: Modifikasi Struktur, Beton Pracetak, Sistem Gamda, Sambungan Basah, Panjang Penyaluran
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA658 Structural design
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 20 Oct 2023 03:06
Last Modified: 20 Oct 2023 03:06
URI: http://repository.its.ac.id/id/eprint/104909