Suwandira, Gusti Ngurah Putu (2006) Optimasi Biaya Pekerjaan Aspal Hot Mix Dengan Model Penugasan (Assignment Model) Pada Proyek Jalan di Bali. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
3102203702-Master_Thesis.pdf - Accepted Version Download (52MB) |
Abstract
Aspal hot mix merupakan salah satu bahan yang digunakan untuk lapisan perkerasan jalan. Pada tahun 2004 di Bali terdapat 55 proyek yang dilayani oleh 10 alat pencampur aspal hot mix (Asphalt Mixing Plant/ AMP), akibat keterbatasan AMP menyebabkan terjadinya keterlambatan proyek.
Tesis ini bertujuan untuk melakukan optimasi biaya pekerjaan aspal hot mix dengan model penugasan (Assignment). Optimasi biaya dilakukan dengan mengatur alokasi AMP untuk memenuhi kebutuhan proyek. Analisa dilakukan dengan menghitung kebutuhan hot mix masing-masing proyek, harga sewa, biaya mobilisasi dan demobilisasi.
Dari hasil analisis diperoleh penugasan masing-masing AMP yaitu PT. Kresna Karya, PT. Tunas Jaya Sanur, PT. Adi Murti, PT. Sinar Bali, PT. Darma Buana Karya, PT. AKAS, PT. Sumber Karisma Jaya dan PT. Dwi Arta Yuda Utama sebanyak 6 penugasan. PT. Makura mendapat 4 penugasan dan PT. Harapan Jaya mendapat 3 penugasan. Total biaya sebesar Rp. 29.456.132.296,00. sedangan biaya total minimum dari palaksanaan riil dilapangan diperoleb biaya sebesar Rp .
32.347.308.872,00.
=========================================================================================================================================
Hot mix asphalt is one kind of the material which is used to paved the road layer. In 2004 there were 55 projects served by 10 Asphalt Mixing Plants/AMP in Bali, due to limited AMP causes the project delayed. The objective of this research is to optimized the project cost of hot mix asphalt based on assignment model. Cost optimalization is undertaken by regulating AMP allocation to fulfill the project need. The analysis is undertaken through the calculation the need of hot mix for each project, lease cost, mobilization as well as
demobilization cost. Based on the result of analysis, it is found that assignment for each AMP, is as follows: PT. Kresna Karya, PT. Tunas Jaya Sanur, PT. Adi Murti, PT. Sinar Bali,
PT. Darma Buana Karya, PT.AKAS, PT. Sumber Karisma Jaya and PT. Dwi Arta Yuda Utama with 6 assignment, PT. Makura got 4 assigment and PT. Harapan Jaya got 3 assigment. Total Cost is Rp 29,456,132,296, while minimum total cost from real implementation ofthe project site is found Rp 32,347,308,872.
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | RTS 625.850 29 Suw o 2006 |
Uncontrolled Keywords: | Optimasi, aspal hot mix, model penugasan. |
Subjects: | T Technology > TE Highway engineering. Roads and pavements > TE250.P475 Pavements--Design and construction--Estimates. |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22101-(S2) Master Thesis |
Depositing User: | - Davi Wah |
Date Deposited: | 13 Nov 2023 06:52 |
Last Modified: | 13 Nov 2023 06:53 |
URI: | http://repository.its.ac.id/id/eprint/105101 |
Actions (login required)
View Item |