Analisis Risiko Model Kerja Sama Public Private Partnership (PPP) - Build Operate Transfer (BOT) TPA (X) Kota (Y)

Dwifajryn, A. Alfitra (2014) Analisis Risiko Model Kerja Sama Public Private Partnership (PPP) - Build Operate Transfer (BOT) TPA (X) Kota (Y). Other thesis, Insititut Teknologi Sepuluh Nopember.

[thumbnail of 9111202402_Master_Thesis.pdf] Text
9111202402_Master_Thesis.pdf

Download (1MB)

Abstract

Public Private Partnership (PPP) adalah bentuk kerjasama perjanjian kontrak antara Pemerintah dan Swasta. TPA (X) sebagai objek penelitian adalah salah satu contoh PPP/KPS di kota (Y). Kerjasama tersebut adalah pengembangan TPA dari sistem open dumping ke sistem yang lebih baik dari pengelolaan dan penerapan teknologinya. Skema kerjasama PPP/KPS melibatkan banyak pihak sehingga berpotensi memiliki risiko dalam proses kerjasamanya. Analisis risiko adalah salah satu faktor penting kesuksesan proyek, karena itu penelitian ini bertujuan melakukan analisis risiko model kerjasama PPP – BOT TPA (X) Kota (Y). Metode penelitian dimulai dengan identifikasi risiko dengan cara melihat variabel – variabel risiko penelitian terdahulu. Kemudian penentuan variabel risiko melalui wawancara dengan pihak Pemerintah dan Swasta. Penilaian variabel risiko probabilitas dan impact menggunakan skala 1 sampai 5. Setelah itu dianalisis menggunakan tools double probability impact. Hasil penelitian menemukan 40 variabel risiko yang sesuai dengan penelitian. Kemudian dikelompokan menjadi 8 variabel risiko utama untuk menentukan level risiko dan opportunity. Selanjutnya dari 8 variabel risiko dilakukan mitigasi terhadap 3 variabel risiko yang mempunyai nilai High dan 1 variabel risiko yang mempunyai nilai Medium. Mitigasi yang dilakukan adalah optimalisasi kerjasama dengan prinsip saling menguntungkan, serta dukungan dari pemerintah dalam bentuk kebijakan yang berpihak.
==============================================================================================================================
Public Private Partnership (PPP) is a form of cooperation agreement between the Government and private contracts. TPA (X) as the object of study is one example of PPP/KPS in town (Y). Such cooperation is the development of a system of open dumping landfill into a better system of management and application of technology. Cooperation schemes PPP/KPS involves so many parties potentially at risk in the process of cooperation. Risk analysis is one of the critical success factors of the project, therefore this study aimed to analyze the risk of cooperation model PPP – BOT TPA (X) City (Y). The research method starts with the identification of risk by looking at the variable – variable a risk of previous studies. Then the determination of the risk variables through interviews with government and private parties. Assessment of risk probability and impact variables using a scale of 1 to 5 after it was analyzed using the tools of probability double impact. The results found that 40 risk variables according to the study. Then grouped into 8 major risk variables to determine the level of risk and opportunity. Furthermore, from 8 variable risk mitigation against the risk that 3 variable has a value of 1 high and risk variables that have a medium value. Mitigation is the optimization of cooperation undertaken with the principle of mutual benefit, as well as support from the government in the form of a policy supporting.

Item Type: Thesis (Other)
Additional Information: RTMT 658.155 Dwi a
Uncontrolled Keywords: Public Private Partnership, Build Operate Transfer, Analisis Risiko, Double Probability Impact, Public Private Partnership, Build Operate Transfer, Risk Analysis,
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Faculty of Business and Management Technology > Management Technology > 61101-(S2) Master Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 22 Nov 2023 04:07
Last Modified: 22 Nov 2023 04:07
URI: http://repository.its.ac.id/id/eprint/105188

Actions (login required)

View Item View Item