Analisis Siltation Rate Selama Pengerukan Pada Beberapa Kolam Pelabuhan Gresik dan Surabaya

Armani, Fierro Daffa (2023) Analisis Siltation Rate Selama Pengerukan Pada Beberapa Kolam Pelabuhan Gresik dan Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 04311940000065-Undergraduate_Thesis.pdf] Text
04311940000065-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2025.

Download (20MB) | Request a copy

Abstract

Siltation rate adalah pengendapan atau sedimentasi yang materialnya berasal dari luar maupun dalam lokasi keruk yang terjadi saat pelaksanaan pengerukan. PT. Alur Pelayaran Barat Surabaya melakukan maintenance dredging pada beberapa kolam pelabuhan di Gresik dan Surabaya. Pada penelitian ini dilakukan analisis pada kolam tersebut mengenai siltation rate dengan menghitung penambahan volume dan stabilitas lereng dari desain keruk. Analisis dilakukan menggunakan software surfer 18 dengan metode overlay batimetri progres dengan selang waktu tertentu mulai dari MC0 hingga MC100. Untuk analisis stabilitas lereng dilakukan dengan menggunakan software GEOSLOPE: Slope/W dengan menggunakan metode Morgenstern-price. Hasil analisis menunjukan bahwa siltation rate pada kolam pelabuhan di Gresik dan Surabaya bervariasi. Pada kegiatan pengerukan kolam pelabuhan memiliki nilai siltation rate sebesar 6% 17%, 4%, 9%, dan 7%. Kemudian berdasarkan karakteristik tanah, slope yang direkomendasikan pada desain keruk setiap kolam pelabuhan adalah lereng 1:4 dengan SF 1,795, lereng 1:15 dengan SF sebesar 1,728, lereng 1:4 dengan SF sebesar 1,746, lereng 1:3 dengan SF sebesar 1.675, dan lereng 1:2 dengan SF sebesar 1.643.
=================================================================================================================================
Siltation rate is the deposition or sedimentation of material from outside or inside the dredge site that occurs during dredging. PT. Alur Pelayaran Barat Surabaya conducts maintenance dredging in several port ponds in Gresik and Surabaya. This research analyzes the siltation rate by calculating the additional volume and slope stability of the dredge design. The analysis was carried out using Surfer 18 software with the progress bathymetry overlay method with a certain time interval starting from MC0 to MC100. The slope stability analysis was conducted using GEOSLOPE software: Slope/W using the Morgenstern-price method. The analysis results show that the siltation rate in the harbor ponds in Gresik and Surabaya varies. In dredging activities, the harbor pond has siltation rate values of 6% 17%, 4%, 9%, and 7%. Then based on soil characteristics, the recommended slopes in the dredge design of each harbor pond are 1:4 slope with SF of 1.795, 1:15 slope with SF of 1.728, 1:4 slope with SF of 1.746, 1:3 slope with SF of 1.675, and 1:2 slope with SF of 1.643.

Item Type: Thesis (Other)
Uncontrolled Keywords: siltation rate, pengerukan, batimetri, stabilitas lereng, overlay, desain keruk, volume
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC175.2 Sediment transport
Divisions: Faculty of Marine Technology (MARTECH) > Ocean Engineering > 38201-(S1) Undergraduate Thesis
Depositing User: Fierro Daffa Armani
Date Deposited: 29 Dec 2023 02:28
Last Modified: 29 Dec 2023 02:28
URI: http://repository.its.ac.id/id/eprint/105333

Actions (login required)

View Item View Item