Hidayat, Muhammad Alif (2023) Analisis Peningkatan Efisiensi Energi Pada Sistem Distribusi Air Minum Area Pelayanan Kalidoni Perumda Tirta Musi Kota Palembang. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
6014221025-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2025. Download (4MB) | Request a copy |
Abstract
Perumda Tirta Musi Kota Palembang melayani 74,53% dari jumlah penduduk Kota Palembang yang terdiri dari 311.887 sambungan rumah. Area pelayan Kalidoni memiliki jumlah sambungan rumah 33.420, dan jumlah pengaliran rata-rata 1.020.000 m3 tiap bulannya. Untuk dapat mendukung pelayanan tersebut Perumda Tirta Musi menggunakan pompa untuk distribusi air ke seluruh pelanggannya. Konsumsi energi tertinggi Perumda tirta musi pada tahun 2022 pada urutan ketiga adalah pada Instalasi booster yang menggunakan 19% dari konsumsi energi listrik. Skema pengaliran alir dari IPA 3 Ilir harus ditampung terlebih dahulu pada reservoir dan diteruskan dengan menggunakan booster. Tujuan dari penelitian ini adalah untuk melihat peluang efisiensi energi yang dapat dilaksanakan pada area pelayanan Kalidoni. Audit energi dilaksanakan untuk dapat melihat faktor daya, efisiensi motor pompa dan nilai konsumsi energi spesifik. Permodelan jaringan dengan menggunakan EPANET 2.2 juga diperlukan dengan tujuan untuk melakukan evaluasi terhadap sistem yang terbangun sudah sesuai dengan pompa yang terpasang atau harus diganti dengan spesifikasi lainnya. Setelah diketahui alternatif yang terbaik secara teknis maka harus dihitung kelayakan finansial dengan menggunakan metode payback period, IRR dan juga NPV untuk mengetahui apakah alternatif yang dilaksanakan sudah layak secara finansial. Dari beberapa alternatif yang disediakan akan dikaji terlebih dahulu secara kelembagaan dengan metode IFAS & EFAS yang dilanjutkan dengan kajian SWOT. Dari hasil penelitian menunjukkan efisiensi pompa pada Instalasi Pengolahan Air 3 Ilir dan Booster Kalidoni masih dalam kondisi baik dengan rata-rata efisiensi sekitar 50-60%. Model distribusi area Kalidoni mengidentifikasi dua titik kritis yang mengalami tekanan negatif pada jam maksimum. Untuk peningkatan efisiensi energi, disarankan program penjadwalan pompa pada booster Kalidoni yang dapat mengurangi kebutuhan energi sebesar 8,71%. Pembangunan elevated reservoir juga menjanjikan penghematan energi sebesar 32,26% sementara untuk pembangunan ground reservoir mengurangi kebutuhan energi sebesar 33,18%. Analisis finansial menunjukkan bahwa program penjadwalan pompa dapat menghemat biaya bulanan sebesar 7,8%, sementara program pembangunan elevated reservoir & ground reservoir dianggap layak berdasarkan IRR, PP, dan NPV. Strategi kelembagaan mencakup investasi pada efisiensi energi, pelaksanaan program efisiensi dengan pihak luar, dan pengembangan ekosistem IoT & SCADA.
=================================================================================================================================
Perumda Tirta Musi in Palembang serves 74.53% of the city's population, comprising 311,887 household connections. The Kalidoni service area has 33,420 household connections, with an average monthly water flow of 1,020,000 m3. To support these services, Perumda Tirta Musi utilizes pumps for water distribution to its customers. In 2022, the third-highest energy consumption for Perumda Tirta Musi was at the booster installation, accounting for 19% of the electricity consumption. The flow scheme from the Water Treatment Plant 3 Ilir must be accommodated in a reservoir before being further distributed using boosters. The objective of this research is to explore energy efficiency opportunities in the Kalidoni service area. Energy audits were conducted to examine power factors, pump motor efficiency, and specific energy consumption values. Network modeling using EPANET 2.2 was also employed to evaluate whether the existing system aligns with the installed pumps or if replacements with different specifications are needed. Once the best technical alternative is identified, financial feasibility must be calculated using payback period, IRR, and NPV methods to determine its financial viability. Several alternatives will be institutionally assessed using the IFAS & EFAS methods, followed by a SWOT analysis. Research results indicate that pump efficiency at Water Treatment Plant 3 Ilir and Kalidoni Booster is still in good condition, with an average efficiency of approximately 50-60%. The distribution model in the Kalidoni area identified two critical points experiencing negative pressure during peak hours. To improve energy efficiency, it is recommended to implement a pump scheduling program at the Kalidoni booster, reducing energy needs by 8.71%. The construction of an elevated reservoir also promises energy savings of 32.26%, while a ground reservoir reduces energy needs by 33.18%. Financial analysis shows that the pump scheduling program can save monthly costs by 7.8%, while the construction of elevated and ground reservoirs is deemed feasible based on IRR, PP, and NPV. Institutional strategies include investments in energy efficiency, implementing efficiency programs with external parties, and developing an IoT & SCADA ecosystem.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Distribusi Air Minum, Efisiensi Energi, EPANET, Konsumsi Energi, Pompa, Energy Consumption, Energy Efficiency, Water Distribution Network, Pump |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > TD481 Water distribution systems |
Divisions: | Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Environmental Engineering > 25101-(S2) Master Thesis |
Depositing User: | muhammad alif hidayat |
Date Deposited: | 29 Dec 2023 02:38 |
Last Modified: | 29 Dec 2023 02:49 |
URI: | http://repository.its.ac.id/id/eprint/105334 |