Penerapan Metode Logika Fuzzy dan Pemetarencanaan Pada Proyek XYZ

Hastanto, Eko Setyo (2023) Penerapan Metode Logika Fuzzy dan Pemetarencanaan Pada Proyek XYZ. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032212180-Master-Thesis.pdf] Text
6032212180-Master-Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (5MB) | Request a copy

Abstract

Aktifitas fabrikasi anjungan lepas pantai adalah fase yang sangat kritikal dalam proses ekploitasi minyak dan gas bumi. Setiap proyek sangatlah unik dan dinamis, artinya tidak ada proyek yang sama. Adanya faktor faktor penyebab keterlambatan dalam proses fabrikasi merupakan tantangan bagi perusahaan kontraktor, karena nilai denda sangatlah besar, berhubungan dengan tahap instalasi di lepas pantai yang memakan biaya operasional sangat besar. Identifikasi penyebab keterlambatan diperlukan untuk mengetahui lebih awal, diperlukan survei wawancara dengan personel yang berkompeten dalam bidang fabrikasi diharapkan akan di dapatkan data faktor-faktor yang mempengaruhi perjalanan sebuah proyek. setelah diketahui faktor faktor tersebut akan dilakukan pengelompokan menurut data Schedule Level- 3 yang ada, data tersebut akan dihubungkan dengan jumlah normal hari yang dibutuhkan untuk menyelesaikan target setiap tahapan pekerjaan, misal : pengiriman material, perakitan struktur, pengelasan dan pengecatan. Penggunaan metode fuzzy bisa membantu mendapatkan identifikasi awal dan pengaruh jka ada keterlambatan. Berdasarkan analisis Logika Fuzzy dihasilkan waktu tercepat pekerjaan diselesaikan dalam 156 hari dan paling lambat 170 hari, digunakan juga metode PERT untuk mendapatkan Critical Path. Dengan mendapatkan data dan informasi komponen pekerjaan dapat disusun Petarencana Kerja dan konsep Pemetarencaan proyek dengan sasaran yang akan dicapai yang bisa diukur dalam suatu periode waktu selama pengerjaan proyek sampai tahap akhir.
=================================================================================================================================
Offshore platform fabrication activity is a very critical phase in the oil and gas exploitation process. Each project is unique and dynamic, meaning that no project is the same. The existence of factors that cause delays in the fabrication process is a challenge for contractor companies, because the value of fine is very large related to the offshore installation stage which requires very large operational costs. Identification of the causes of delay is needed to find out earlier, interview surveys are needed with competent personnel in the field of fabrication, it is expected that data on factors that influence the course of a project will be obtained once these factors are known, grouping will be carried out according to the existing Schedule Level-3 data, this data will be related to the normal number of days needed to complete the target for each stage of work, for example: material delivery, structural assembly, welding and painting. Based on Fuzzy Logic analysis, it is found the fastest completion time is 156 days and the slowest is 170 days. The PERT method was also used to obtain the Critical Path. By obtaining data and information on work components, Work Roadmap and Roadmapping concepts can be prepared with targets to be achieved which can be measured over a period of time during project life until the final stage.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Fabrikasi Anjungan Lepas Pantai, Faktor Keterlambatan, Metode Logika Fuzzy, Pemetarencanaan Proyek, Schedule Level-3
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.62 Simulation
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Eko Setyo Hastanto
Date Deposited: 18 Jan 2024 01:02
Last Modified: 18 Jan 2024 01:02
URI: http://repository.its.ac.id/id/eprint/105540