Modifikasi Perencanaan Gedung Sekolah Terang Bangsa (STB) Dengan Metode Pracetak (Precast) Dan Menggunakan Sistem Rangka Gedung (Building Frame System)

Zahrial Firman R, Zahrial Firman R (2010) Modifikasi Perencanaan Gedung Sekolah Terang Bangsa (STB) Dengan Metode Pracetak (Precast) Dan Menggunakan Sistem Rangka Gedung (Building Frame System). Other thesis, Institut Teknologi Sepuluh Nopember Surabaya.

[thumbnail of 3105100092-Undergraduated_Thesis.pdf] Text
3105100092-Undergraduated_Thesis.pdf - Accepted Version

Download (27MB)

Abstract

Adanya peningkatan kebutuhan pembangunan di Indonesia mendorong berkembangnya metode konstruksi di bidang teknik sipil. Dalam upaya pemenuhan kebutuhan tersebut, tuntutan akan pekerjaan konstruksi yang efektif dan efisien makin besar. Sistem Pracetak, sebagai salah satu metode konstruksi, merupakan alternatif tepat karena memiliki keunggulan dalam hal kecepatan, kontrol kualitas, dan kemudahan dalam pelaksanaan. Dalam tugas akhir ini, Gedung STB direncanakan menggunakan metode pracetak pada elemen balok dan pelat. Sedangkan elemen kolom, tangga dan poer menggunakan metode cor di tempat. Modifikasi yang dilakukan pada gedung ini antara lain menambah jumlah lantai dalam struktur menjadi 10 lantai, mereduksi bentang balok yang semula 8 meter menjadi 6 meter dan menambahkan elemen dinding geser dalam memikul gaya lateral untuk mengatasi sambungan pracetak yang tidak terlalu kaku. Dari literature yang ada, Sistem sambungan yang akan digunakan pada gedung ini adalah sambungan basah dengan sedikit modifikasi oleh penulis dengan pertimbangan kemudahan pelaksanaan di lapangan Jumlah jenis tipe dari elemen struktur yang berbeda dibuat seminimal mungkin. Hal ini dimaksudkan untuk mengurangi jumlah cetakan dan menyeragamkan detail penulangan dan sambungan. Akhirnya secara keseluruhan; struktur gedung ini tidak hanya ekonomis, tetapi juga kuat dalam menerima gaya gravitasi dan gaya gempa sesuai zona gempa gedung ini berada
===================================================================================================================================
The increasing need for development in Indonesia has encouraged the development of construction methods in the field of civil engineering. In an effort to fulfill these needs, the demand for effective and efficient construction work is increasing. The precast system, as a construction method, is an appropriate alternative because it has advantages in terms of speed, quality control and ease of implementation. In this final project, the STB Building is planned using the precast method for beam and plate elements. Meanwhile, the column, stair and roof elements use the cast-in-place method. Modifications made to this building include increasing the number of floors in the structure to 10 floors, reducing the beam span from 8 meters to 6 meters and adding shear wall elements to support lateral forces to overcome precast connections that are not too stiff. From existing literature, the connection system that will be used in this building is a wet connection with slight modifications by the author considering ease of implementation in the field. The number of types of different structural elements is kept to a minimum. This is intended to reduce the number of molds and uniformize reinforcement and connection details. Finally overall; The structure of this building is not only economical, but also strong in accepting gravitational forces and earthquake forces according to the earthquake zone the building is located in

Item Type: Thesis (Other)
Additional Information: RSS 690.73 Zah a-1 2010
Uncontrolled Keywords: Pracetak (precast ), Sistem Rangka Gedung (Building Frame System), Dinding Geser (Shearwall); Precast (precast), Building Frame Systems (Building Frame System), Shearwall
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA681 Concrete construction
T Technology > TA Engineering (General). Civil engineering (General) > TA683 Precast concrete construction. Prestressed concrete construction.
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: EKO BUDI RAHARJO
Date Deposited: 18 Jan 2024 04:13
Last Modified: 18 Jan 2024 04:13
URI: http://repository.its.ac.id/id/eprint/105546

Actions (login required)

View Item View Item