Pengaruh Feedwater Heater Terhadap Efisiensi Sistem Pembangkit 410 MW Dengan Pemodelan Gate Cycle

Fajar, Adek Fathir (2014) Pengaruh Feedwater Heater Terhadap Efisiensi Sistem Pembangkit 410 MW Dengan Pemodelan Gate Cycle. Other thesis, Insititut Teknologi Sepuluh Nopember.

[thumbnail of 2111106005_Undergraduate_Thesis_KURANG PENGESAHAN.pdf] Text
2111106005_Undergraduate_Thesis_KURANG PENGESAHAN.pdf

Download (4MB)

Abstract

Seiring dengan berkembangnya zaman dan berkembangnya teknologi berbanding lurus dengan kebutuhan energi listrik. Dan hampir seluruh aspek kehidupan di Indonesia bergantung pada ketersediaan energi listrik. Untuk memenuhi kebutuhan listrik yang besar di Indonesia maka dibangun sebuah powerplant. Powerplant merupakan aplikasi dari siklus rankine regeneratif. Siklus ini merupakan salah satu metode untuk meningkatkan efisiensi thermal dari pembangkit listrik tenaga uap (PLTU) yaitu dengan cara meningkatkan temperatur rata- rata fluida yang akan masuk ke dalam boiler. Peningkatan temperature dapat dilakukan dengan menambah komponen yaitu feedwater heater. Pemodelan sistem pembangkit dilakukan sehingga kita dapat mengetahui penambahan efisiensi jika menggunakan beberapa feedwater heater. Pemodelan sistem pembangkit menggunakan software Gate cycle, sedangkan perhitungan manual menggunakan analisa thermodinamika. Adapun hasil perhitungan yang didapatkan adalah nilai fraksi massa pada setiap titik keadaan (y’), kalor yang masuk pada boiler dan reheat (∑ ), kalor yang keluar pada kondensor ( ), kerja yang dihasilkan oleh masing-masing turbin(∑ ), serta kerja yang dibutuhkan pompa untuk mengalirkan fluida(∑ ) pada keadaan normal. Dengan melihat hasil pemodelan gate cycle, terjadinya kenaikan effisiensi pada sistem pembangkit pada keadaan FWH 6 off sebesar 0,7 % dari keadaan FWH 5&6 off. Lalu adanya kenaikan effisiensi pada sistem pembangkit pada keadaan FWH 6 off (fix temperature) sebesar 1,4 % dari keadaan FWH 5 &6 off, dengan penambahan beban kerja yang dibutuhkan pada feedwater heater 7 adalah 193862 kg/h. Sistem pembangkit pada keadaan FWH 6 off (fix temperature) menunjukkan sistem pembangkit mengalami kerusakkan pada feedwater heater 6 sehingga diperlukan penambahan beban laju aliran massa pada steam yang masuk ke feedwater selanjutnya(FWH 7) agar temperatur fluida kerja yang akan masuk di dalam boiler sama dengan keadaan sistem pembangkit pada keadaan normal. Dapat disimpulkan bahwa pengurangan jumlah feedwater heate r akan mengalami penurunan effisiensi yang disebabkan oleh bertambahnya kalor yang dibutuhkan di dalam boiler.
=============================================================================================================================
As the time goes by the development of technologies are directly proportional to the electrical energy needs. And almost all of the aspects of life in Indonesia depend on the electrical energy availability. To meet the huge demand for electricity in Indonesia, the plant is built. Power plant is the application of regenerative Rankine cycle. This cycle is one method to improve the thermal efficiency of a steam plant (power plant) by increasing the average temperature of the fluid that will flow into the boiler. Increased temperature can be done by adding the component of the feedwater heater. Plant modeling is done so that we can determine if the additional efficiency of using some feedwater heater is. The modeling used Gate cycle plant software, while the manual calculation used thermodynamic analysis. As for the obtained calculation results are mass fraction at any point (y’), the heat which flows into the boiler and reheat (∑ ), the heat which flows out from the condenser ( ). Produced power by each turbin e (∑ ), and the pump power which is required to circulate the fluid flow (∑ ) on the normal state. By observing the results of gate cycle modeling, there is 0.7% increased efficiency of the plant while FWH 6 is off related to off condition of FWH 5 & 6. Then the plant efficiency is increased 1.4% while FWH 6 is off (fixed temperature) related to off condition of FWH 5 & 6, with some addition of the required workload on feedwater heater 7 is 193862 kg / h. The plant with the off FWH 6 (fixed temperature) exhibits that the FWD 6 is in a poor condition so that some additional steam load flowrate is required which flows into the next one (FWH 7) so that the temperature of the working fluid that will flow into the boiler is similar to normal side of the plant . It can be concluded that the reduction in number of feedwater heater will lead to any reduction efficiency due to the increased heat required by the boiler.

Item Type: Thesis (Other)
Additional Information: RSM 621.402 5 Faj p-1, 2014
Uncontrolled Keywords: Powerplant, PLTU, Feedwater heater, Gate cycle.
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1010 Electric power system stability. Electric filters, Passive.
Divisions: Faculty of Industrial Technology > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 18 Jan 2024 07:45
Last Modified: 18 Jan 2024 07:45
URI: http://repository.its.ac.id/id/eprint/105557