Evaluasi Koordinasi Rele Pengaman Pada Jaringan Distribusi 20 KV Di Gardu Induk Garuda Sakti, Panam- Pekanbaru

Rusymi, Hasrizal (2014) Evaluasi Koordinasi Rele Pengaman Pada Jaringan Distribusi 20 KV Di Gardu Induk Garuda Sakti, Panam- Pekanbaru. Other thesis, Insititut Teknologi Sepuluh Nopember.

[thumbnail of 2206100015_Undergraduate_Thesis.pdf] Text
2206100015_Undergraduate_Thesis.pdf

Download (1MB)

Abstract

Gardu Induk Garuda Sakti, Panam-Pekanbaru merupakan salah satu unit dari PT. PLN (Persero). Oleh karena itu, Gardu Induk Garuda Sakti, Panam-Pekanbaru harus mendistribusikan dan menjamin terpasoknya daya listrik sampai ke beban (pelanggan). Untuk menjamin terpasoknya daya listrik sampai ke beban (pelanggan), maka dibutuhkan sistem kelistrikan yang mempunyai keandalan dan kontinuitas yang baik. Sistem kelistrikan GI Garuda Sakti terdiri dari 3 Trafo dan 20 penyulang (Feeder). Trafo tersebut mempunyai kapasitas : Trafo 1 50 MVA, Trafo 2 50 MVA dan Trafo 3 60 MVA. Jenis trafo yang digunakan adalah 3-Winding. Trafo 1 mempunyai 6 penyulang dan trafo 2 mempunyai 6 penyulang, sedangkan trafo 3 mempunyai 8 penyulang. Untuk memperoleh keandalan dan kontinuitas yang baik pada sistem kelistrikan tersebut, maka diperlukan setting dan koordinasi sistem proteksi yang baik dan tepat. Sehingga pada saat terjadi gangguan, kemungkinan terjadi kesalahan trip pada peralatan pengaman lebih kecil dari yang diperkirakan. Tugas akhi r ini bertujuan untuk mengevaluasi dan menganalisis terhadap setting dan koordinasi rele pengaman pada Gardu Induk Garuda Sakti, Panam-Pekanbaru.
=============================================================================================================================
Substation Garuda Sakti, Panam Pekanbaru is one unit of PT. PLN (Persero). Therefore, substation Garuda Sakti, Panam Pekanbaru must distribute and ensure the power supply to the load (the customer). To ensure the availability of power supply to the load (the customer), it is necessary to have the electrical system reliability and good continuity. Garuda Sakti GI electrical system consists of three transformers and 20 feeders (Feeder). The transformer has a capacity: Transformers 1 = 50 MVA, Transformers 2 = 50 MVA and Transformer 3 = 60 MVA. Type of transformer used is 3-Winding Transformer. Transformer 1 has 6 feeder and transformer 2 has 6 feeder, while transformer 3 has 8 feeders. To obtain good reliability and continuity, it is necessary to set up and coordination of protection systems are good and right. So that in the event of interference or fault, the possibility of error trip on safety equipment is smaller than expected. This final project aims to evaluate and analyze the safety relay setting and coordination at substation Garuda Sakti, Panam Pekanbaru.

Item Type: Thesis (Other)
Additional Information: RSE 621.317 Rus e-1, 2014
Uncontrolled Keywords: Koordinasi, rele pengaman, penyulang, trafo, gangguan, kontinuitas, setting, Coordination, safety relay, feeder, transformer, interference, continuity,
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays. Protective relays--Security measures.
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 24 Jan 2024 06:08
Last Modified: 24 Jan 2024 06:08
URI: http://repository.its.ac.id/id/eprint/105602

Actions (login required)

View Item View Item