PT. Pupuk Kaltim adalah perusahaan produsen pupuk urea terbesar di Indonesia yang saat ini sedang melakukan penambahan pabrik. Dengan adanya penambahan beban maka PT Pupuk Kaltim juga melakukan penambahan daya yang dibangkitkan. Penambahan pembangkit baru dilakukan di pabrik PKT-5. Dengan pemasangan generator 2x30MW diharapkan dapat meningkatkan kinerja perusahaan. Penambahan pembangkit ini berpengaruh pada arus hubung singkat (Short Circuit Current) pada setiap bus terutama pada bus 33kV yang saling terintegrasi. Tujuan dari tugas akhir ini akan dilakukan setting koordinasi rele seperti pengaman diferensial pada setiap bus utama pada sistem intergrasi 33kV dan ground fault sebagai back up apa bila rele diferensial gagal mengamankan. Analisa pada tugas akhir ini diharapkan dapat membantu dalam mengamankan atau mencegah kerusakan pada peralatan dan jaringan listrik.
=============================================================================================================================
PT. Pupuk Kaltim is the largest producer company of fertilizer urea in Indonesia which is currently doing the addition of the factory. With the addition of the load then PT Pupuk Kaltim also did the addition of the power generated. The addition of new plants is done in factory PKT-5. With the installation of a generator of 2x30MW is expected to improve the company's performance. The addition of this plant effect on currents of short circuit (Short Circuit Current) on each bus is mainly on 33kV bus integrated with each other. The purpose of this final assignment will be done setting rele like differential protection coordination on any main bus on the system intergration 33kV and ground fault as a back up when the differential failed. Analysis on the final project is expected to help in securing or preventing damage to equipment and electricity networks.

Item Type: Thesis (Other)
Additional Information: RSE 621.317 Abd k-1, 2014
Uncontrolled Keywords: Kontinuitas, Diferensial, Short Circuit Current, Ground Fault, bus, differential, Ground Fault, Short Circuit Current, Perfomance
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK2861 Electric relays
Divisions: Faculty of Industrial Technology > Electrical Engineering > 20201-(S1) Undergraduate Thesis
Depositing User: Mr. Marsudiyana -
Date Deposited: 26 Jan 2024 07:14
Last Modified: 26 Jan 2024 07:14
URI: http://repository.its.ac.id/id/eprint/105670

Actions (login required)

View Item View Item