Analisis Produktivitas Alat Berat pada Pekerjaan Pengecoran Bored Pile di Jembatan Bandar Ngalim Kediri

Yaqin, M Lukman Ainul (2024) Analisis Produktivitas Alat Berat pada Pekerjaan Pengecoran Bored Pile di Jembatan Bandar Ngalim Kediri. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5012201028-Undergraduate_Thesis.pdf] Text
5012201028-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (4MB) | Request a copy

Abstract

Pembangunan proyek konstruksi mulai berkembang pesat, khususnya di negara berkembang seperti Indonesia. Semakin berkembangnya proyek konstruksi maka semakin berkembang juga teknologi alat berat konstruksi yang digunakan. Penggunaan alat berat dalam proses pelaksanaan proyek konstruksi harus dilakukan secara efisien karena dapat menunjang keberhasilan suatu proyek konstruksi. Proyek pembangunan Jembatan Bandar Ngalim merupakan salah satu proyek konstruksi infrastruktur jembatan yang berada di Kota Kediri Jawa Timur. Tugas Akhir ini bertujuan untuk menganalisis hasil produktivitas alat berat pada pekerjaan pengecoran bored pile di Jembatan Bandar Ngalim Kediri serta mendapatkan komposisi alat berat yang lebih baik dari segi waktu dan biaya antara kondisi eksisting di lapangan dengan kondisi yang direncanakan pada pekerjaan pengecoran bored pile di Jembatan Bandar Ngalim Kediri. Pada penelitian ini akan dilakukan perhitungan produktivitas setiap alat berat pada proyek pembangunan Jembatan Bandar Ngalim. Setelah mendapatkan nilai produktivitas setiap alat berat, dilakukan pengelompokan atau komposisi alat berat dengan perhitungan 3 alternatif dan dipilih salah satu alternatif yang lebih baik antara kondisi eksisting di lapangan dengan kondisi yang direncanakan. Penelitian ini, didapatkan hasil kombinasi alternatif alat berat yang optimal adalah pada Alternatif 2 karena memiliki selisih waktu dan biaya terkecil yaitu -240 jam dan -Rp 13.765.234,41 dari kondisi eksisting. Selain itu, juga dapat dibuktikan dengan menggunakan penyetaraan waktu dan biaya masing-masing 50%, juga didapatkan hasil yang paling kecil diantara alternatif lain yaitu 1,00. Dengan demikian, dapat disimpulkan bahwa alternatif yang terpilih adalah alternatif 2 yaitu 1 unit Excavator Komatsu PC200, 2 unit Rig Bor XCMG, 2 unit Crawler Crane Hitachi Sumitomo, dan 10 unit Truck Mixer Jayamix SCG.
=================================================================================================================================
The development of construction projects is starting to grow rapidly, especially in developing countries such as Indonesia. The more developed the construction project, the more developed the construction heavy equipment technology used. The use of heavy equipment in the process of implementing construction projects must be done efficiently because it can support the success of a construction project. The Bandar Ngalim Bridge construction project is one of the construction projects in Kediri City, East Java. This Final Project aims to analyze the results of heavy equipment productivity in bored pile casting work on the Bandar Ngalim Kediri Bridge and obtain a better heavy equipment composition in terms of time and cost between eksisting conditions in the field and the planned conditions for bored pile casting work on the Bandar Ngalim Kediri Bridge. In this study, the calculation of the productivity of each heavy equipment in the Bandar Ngalim Bridge construction project will be carried out. After obtaining the productivity value of each machine, 3 alternatives were calculated and one of the better alternatives was selected between the eksisting conditions in the field and the planned conditions. This research, obtained the results of the optimal combination of heavy equipment alternatives are in Alternative 2 because it has the smallest time difference and cost, which is -240 hours and -IDR 13.765.234,41 from the existing condition. In addition, it can also be proven by using time and cost equalization of 50% each, also obtained the smallest result among other alternatives, namely 1,00. Thus, it can be concluded that the selected alternatives are alternative 2, namely 1 unit of Komatsu PC200 Excavator, 2 units of XCMG Drill Rig, 2 units of Hitachi Sumitomo Crawler Crane, and 10 units of Jayamix SCG Truck Mixer.

Item Type: Thesis (Other)
Uncontrolled Keywords: Alat Berat, Bored Pile, Jembatan Bandar Ngalim, Produktivitas, Bandar Ngalim Bridge, Heavy Equipment, Productivity
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: M. Lukman Ainul Yaqin
Date Deposited: 01 Feb 2024 06:37
Last Modified: 01 Feb 2024 06:37
URI: http://repository.its.ac.id/id/eprint/105896