Tampubolon, Erwin (2023) Optimalisasi Jam Kerja Efektif Pengangkutan Batubara Dari ROM Ke Pelabuhan: Studi Di PT. Maruwai Coal, Kalimantan Tengah. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
6032211054-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2026. Download (6MB) | Request a copy |
Abstract
Adaro Minerals Indonesia merupakan salah satu pilar bisnis tambang Adaro yang fokus pada tambang batubara coking di Kalimantan Tengah, merencanakan untuk meningkatkan produksi batubaranya. Objek penelitian ini adalah PT. Maruwai Coal yang berlokasi di Kalimantan Tengah. Tujuan penelitian ini adalah untuk melakukan optimalisasi jam kerja efektif pengangkutan batubara dari ROM ke Pelabuhan. Hal ini dilakukan guna meningkatkan produktifitas yang rendah dari aktivitas pengangkutan batubara dari Tambang ke Pelabuhan yang memiliki tujuan meningkatkan efisiensi operasional. Dengan meningkatkan produktifitas, perusahaan dapat mengurangi waktu dan biaya yang diperlukan dalam pengangkutan, meningkatkan jumlah batubara yang dapat diangkut, dan mengoptimalkan penggunaan sumber daya yang ada. Penelitian ini dilakukan secara kuantitatif. Data primer dalam penelitian ini didapatkan dari hasil pengamatan langsung pada area pengangkutan batubara dari ROM produk ke Pelabuhan yang meliputi waktu edar, durasi hujan, pergantian shift, kondisi jalan, dan lain-lain. Data sekunder yang digunakan dalam penelitian ini adalah data-data pendukung dari teori dan temuan terdahulu terkait hauling road theory. Metode penelitian dilakukan secara kuantitatif dengan melakukan perhitungan jam efisiensi pengangkutan batubara. Hasil penelitian menunjukan bahwa optimalisasi pengangkutan batubara dapat ditingkatkan dengan memperbaiki parameter delay, meningkatkan komunikasi antar operator pengangkutan, melakukan komunikasi real time dan validasi data, melakukan perluasan Change Shift Area, pemenuhan man power, pembuatan strip map, pembuatan rencana kerja, pengadaan material gravel dan perbaikan jalan angkut, serta All Weather Road. Produksi pengangkutan batubara pada 2020 adalah 1.337.969 ton dan pada tahun 2021 terjadi peningkatan produksi pengangkutan batubara mencapai 2.265.781 ton. Jam kerja efektif juga mengalami peningkatan dari tahun ke tahun. Pada tahun 2020, jam kerja efektif rata-rata adalah 4.044,99 jam, sedangkan pada tahun 2021 meningkat menjadi 4.812,76 jam.
=================================================================================================================================
Adaro Minerals Indonesia is one of the pillars of Adaro's mining business which focuses on coking coal mining in Central Kalimantan, planning to increase its coal production. The object of this research is PT. Maruwai Coal which is located in Central Kalimantan. The aim of this research is to optimize effective working hours for transporting coal from ROM to the port. This is done to increase the low productivity of coal transportation activities from mines to ports, which will bring benefits in the form of increased operational efficiency. By increasing productivity, companies can reduce the time and costs required for transportation, increase the amount of coal that can be transported, and optimize the use of existing resources. This research was conducted quantitatively. Primary data in this research was obtained from direct observations in the coal transportation area from the product ROM to port, which includes cycle time, rain duration, shift change, road conditions, etc. Secondary data used in this research is supporting data from previous theories and findings related to hauling road theory. The research method was carried out quantitatively by calculating coal transportation efficiency hours. The research results show that optimization of coal transportation can be improved by improving delay parameters, improving communication between operators, carrying out real time communication and data validation, expanding the Change Shift Area, fulfilling man power, making strip maps, making work plans , as well as procurement of gravel material and hauling road maintenance as well as All Weather Road condition. Coal hauling production reached 1,337,969 tons in 2020 and there was an increased coal hauling production in 2021 for 2,265,781 tons. Effective working hours have also increased from year to year. In 2020, the average effective working hours were 4,044.99 hours, while in 2021 increased to 4,812.76 hours.
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Pengangkutan Batubara, Produktifitas, Jam Kerja Efektif, Coal Hauling, Productivity, Effective Working Hour |
Subjects: | T Technology > T Technology (General) > T58.8 Productivity. Efficiency |
Divisions: | Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT) |
Depositing User: | Erwin Tampubolon |
Date Deposited: | 02 Feb 2024 02:52 |
Last Modified: | 02 Feb 2024 02:52 |
URI: | http://repository.its.ac.id/id/eprint/105925 |