Analisis Risiko Waktu dan Biaya pada Konstruksi Rumah Sakit Vertikal di Surabaya

Putri, Syanindita Annisa (2024) Analisis Risiko Waktu dan Biaya pada Konstruksi Rumah Sakit Vertikal di Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 03111942000005-Undergraduate_Thesis.pdf] Text
03111942000005-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until April 2026.

Download (4MB) | Request a copy

Abstract

Tercapainya keberhasilan suatu proyek konstruksi tidak lepas dari risiko atau hambatan yang diharapkan terjadi dan berdampak negatif terhadap tujuan proyek, antara lain waktu dan biaya. Risiko dapat dihadapi pada setiap proyek konstruksi. Manajemen risiko yang tidak tajam dalam memetakan potensi risiko dapat menghambat pelaksanaan proyek sehingga menimbulkan kerugian akibat pembengkakan biaya dan keterlambatan waktu dalam pelaksanaan pekerjaan. Oleh karena itu, pengelolaan risiko diperlukan agar proyek dapat bertahan dan mengoptimalkan risiko. Tujuan dari penelitian ini adalah untuk mengetahui faktor risiko yang dominan dan solusi yang lebih efisien dalam manajemen risiko pelaksanaan proyek sesuai dengan target proyek yang telah ditetapkan dari segi biaya dan waktu pada bagian struktural proyek pembangunan Rumah Sakit Vertikal di Surabaya. Penelitian ini menggunakan metode kuantitatif; risiko yang teridentifikasi adalah 7 variabel dengan 75 indikator, dan pendataan dilakukan melalui observasi. Kuisioner pendahuluan dibagikan kepada 5 ahli yang menjabat sebagai manajer proyek. Kuisioner tersebut dibagikan kepada 30 responden dari berbagai divisi staf proyek untuk melengkapi kuisioner penelitian. Hasil nilai probabilitas dan dampak setelah itu akan diolah dengan menggunakan metode severity index dan dihitung untuk mengklasifikasikan setiap tingkat risiko dengan metode matrix. Tingkat dan besaran pengelompokan risiko didasarkan pada hasil metode matriks dan akan dilanjutkan dengan wawancara dengan salah satu informan ahli untuk mencari solusi dengan respon risiko. Hasil penilaian mengidentifikasi dua belas tingkat risiko sedang dan dua tingkat risiko tinggi. Sebelum memulai proyek dengan mempertimbangkan tujuan akhir, analisis risiko penting untuk memastikan bahwa kinerja waktu dan biaya berjalan dengan lancar dan pencapaiannya tepat pada target yang sudah ditentukan.
=================================================================================================================================
Achieving the success of a construction project can not be separated from the risks or obstacles that are expected to occur and have a negative impact on project objectives, including time and cost. Risks can be encountered on any construction project. Risk management that is not sharp in mapping potential risks can hinder the implementation of the project, causing losses due to cost overruns and time delays in the implementation of the work. Therefore, managing risk is necessary so that the project can survive and optimize risk. The purpose of this study was to determine the dominant risk factors and more efficient solutions in risk management to implement the project according to project targets that have been set in terms of cost and time on the structural part of the project Vertikal Hospital construction in Surabaya. This study uses quantitative methods; the risks identified are 7 variables with 75 indicators, and data collection was conducted through observation. The preliminary questionnaire was distributed to 5 experts who served as project managers. The questionnaire was distributed to 30 respondents from the project staff’s various divisions to complete the research questionnaire. The results of the value of probability and impact after that will be processed using the severity index method and calculated to classify each level of risk with the matrix method. The level and amount of risk grouping are based on the result of the matrix method and will be continued with the interview with the one expert informant to find a solution with risk response. The assessment results identified twelve medium risk and two high risk levels. Before beginning a project with an end goal in consideration, risk analysis is important for ensuring that time and cost performance run smoothly and that the achievement is targeted.

Item Type: Thesis (Other)
Uncontrolled Keywords: Risk Management, Construction Project, Hospital, Surabaya, Manajemen Risiko, Proyek Konstruksi, Rumah Sakit
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.5 Data Processing
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TA Engineering (General). Civil engineering (General) > TA169.5 Failure analysis
T Technology > TA Engineering (General). Civil engineering (General) > TA645 Structural analysis (Engineering)
Z Bibliography. Library Science. Information Resources > Z278 Books
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: SYANINDITA ANNISA PUTRI
Date Deposited: 07 Feb 2024 01:25
Last Modified: 07 Feb 2024 01:25
URI: http://repository.its.ac.id/id/eprint/106290

Actions (login required)

View Item View Item