Analisis Faktor Penyebab Variation Order Dan Dampak Pada Nilai Kontrak Konstruksi Pada Proyek Bendungan

Siahaan, Hasiholan Christian (2024) Analisis Faktor Penyebab Variation Order Dan Dampak Pada Nilai Kontrak Konstruksi Pada Proyek Bendungan. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032211140-Master_Thesis.pdf] Text
6032211140-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (5MB) | Request a copy

Abstract

Pembangunan bendungan di Indonesia yang banyak, dan membutuhkan anggaran yang sangat besar, ternyata memiliki permasalahan dengan alokasi anggaran yang direncanakan. Sebagian besar bendungan mengalami perubahan nilai kontrak yang cukup besar. Variation order atau juga dikenal sebagai contract change order selalu terjadi pada proyek pembangunan bendungan di Indonesia. Kontrak proyek pekerjaan bendungan yang bersifat harga satuan, sangat terpengaruh dengan adanya variation order, terutama jika terjadi pekerjaan tambah dan kurang, yang berpengaruh terhadap total nilai kontrak pekerjaan. Akibat dari variation order, pemerintah harus menambah anggaran belanja untuk menyelesaikan proyek yang telah dikontrakkan. Penelitian dilakukan dengan penyebaran kuesioner yang dilakukan dalam 2 (dua) tahap, tahap 1 dilakukan untuk menganalisis relevansi indikator dari hasil studi pustaka, sebagai indikator penelitian di bendungan, analisis data pada tahap 1 dilakukan dengan binomial. Tahap 2 dilakukan kuesioner untuk memperoleh data hubungan antara faktor penyebab terjadinya variation order dengan pembengkakan biaya. Analisis data tahap 2 dilakukan dengan regresi berganda. Responden pada tahap 1 dan tahap 2 dipilih dari personil yang pernah dan sedang bekerja di proyek bendungan dari unsur pemilik, konsultan, dan kontraktor.
Hasil dari penelitian ini diperoleh 26 indikator yang menjadi penyebab terjadinya variation order pada proyek pembangunan bendungan di Indonesia. Dari hasil analisis terhadap responden kuesioner tahap 2 diperoleh hasil penelitian faktor yang memberi dampak positif terhadap pembengkakan biaya adalah faktor kontraktor sebesar 0,14, faktor eksternal sebesar 0,067 dan faktor pemilik sebesar 0,04. Yang berarti setiap peningkatan nilai dari setiap faktor tersebut akan berakibat pembengkakan biaya konstruksi.
=================================================================================================================================
Mass construction of main dams in Indonesia that require large budgets, turns out to be having problems with the planned budget allocation. Most of the main dams suffered large changes in contract value. Variation orders or also known as contract change orders often happened in main dam construction projects in Indonesia. The unit price contracts of the project are greatly affected by variation orders, especially if there is additional or slighter work, which would affects value of the contract. Because of variation orders, the government must increase the spending budget to complete contracted project. The research was carried out by distributing questionnaires in 2 stages, stage 1 was carried out to analyze the relevance of indicators from the results of literature studies, as indicators for research on main dams, data analysis in stage 1 was carried out using binomials. In stage 2, a questionnaire was carried out to obtain data on the relationship between the factors causing variation orders and cost overruns. Stage 2 data analysis was carried out using multiple regression. Respondents in stages 1 and 2 were selected from personnel who have worked and are currently working on dam projects from owners, consultants and contractors. The results of this research obtained 26 indicators which are the causes of variation orders in main dam construction projects in Indonesia. From the results of the analysis of stage 2 questionnaire respondents, research results showed that the factors that had a positive impact on cost overruns were the contractor factor of 0.14, the external factor of 0.067 and the owner factor of 0.04. Which means that any increase in the value of each of these factors will result in increased construction costs.

Item Type: Thesis (Masters)
Uncontrolled Keywords: konstruksi bendungan, variation order, faktor, indikator, pembengkakan biaya, Main dam construction, factor, indicators, cost overruns
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: HASIHOLAN CHRISTIAN SIAHAAN
Date Deposited: 08 Feb 2024 17:16
Last Modified: 08 Feb 2024 17:16
URI: http://repository.its.ac.id/id/eprint/106730