Analisis Perbandingan Waktu Dan Biaya Menggunakan Metode Konvensional Dan Pengaplikasian BIM Pada Proyek Pembangunan The Canary Apartment Tangerang Selatan Menggunakan Software Revit

Hutapea, Alpan Mangantar (2024) Analisis Perbandingan Waktu Dan Biaya Menggunakan Metode Konvensional Dan Pengaplikasian BIM Pada Proyek Pembangunan The Canary Apartment Tangerang Selatan Menggunakan Software Revit. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035221099-Undergraduate_Thesis.pdf] Text
2035221099-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (60MB) | Request a copy

Abstract

Indikator kemajuan suatu negara dapat dilihat dari tingkat pembangunan infrastruktur di negara tersebut. Pembangunan infrastruktur dapat berupa gedung, jalan, dan jembatan. Berbicara pembangunan infrastruktur sudah tidak asing lagi dengan pekerjaan konstruksi. Proyek konstruksi adalah serangkaian kegiatan yang saling bergantung yang bertujuan untuk mencapai tujuan tertentu dalam batasan waktu, biaya, dan kualitas tertentu. Mengingat adanya keterbatasan dalam proyek konstruksi, diperlukan perencanaan yang matang sebelum proyek konstruksi dilaksanakan di lokasi.Building Information Modelling (BIM) adalah salah satu cara yang dapat dilakukan untuk menyingkat waktu dan biaya dalam perencanaan proyek. Dalam penelitian ini dilakukan dengan dua metode. Metode pertama adalah memodelkan bangunan menggunakan BIM. Pemodelan bangunan dilakukan dengan menggunakan salah satu aplikasi BIM yaitu Revit. Keluaran dari model ini adalah volume dari tiap elemen struktur. Sementara untuk perhitungan durasinya menggunakan aplikasi BIM tambahan yaitu Naviswork. Kemudian akan muncul metode kedua yaitu metode perhitungan klasik. Cara umum ini membutuhkan bantuan Autocad dan Microsoft Excel. Selain itu, dari kedua metode tersebut akan diperoleh volume beton dan tulangan yang dibutuhkan. Kemudian lanjutkan menghitung produktivitas pekerja dan alat berat. Kemudian lanjutkan untuk menghitung durasi dan melaksanakan rencana anggaran pelaksanaan (RAP). Kemudian kurva-S akan dibuat untuk mengatur waktu konstruksi. Setelah semua perhitungan selesai kemudian dapat dianalisis metode mana yang lebih efektif untuk perencanaan proyek pada metode menggunakan BIM atau Metode klasik yang menggunakan Autocad dan Aplikasi Microsoft Excel. Tugas akhir ini akan membahas perencanaan waktu dan biaya dengan menggunakan BIM untuk proyek pembangunan The Canary Apartment di Tangerang Selatan. Dengan demikian, keterlambatan proyek dan pembengkakan biaya dapat diminimalkan dan model 3D proyek dapat divisualisasikan pada kombinasi perangkat lunak Revit dan Naviswork. Proyek The Canary Apartment ini memperhitungkan Rencana Anggaran Pelaksanaan (RAP) dan Quantity Take-Off dari struktur lantai basement 2 – lantai 8. Setelah melakukan perhitungan Quantity Take-Off didapatkan hasil pada perhitungan beton metode BIM didapatkan hasil 4,49% lebih kecil dari perhitungan konvensional. Perhitungan tulangan pada metode BIM lebih kecil 1,67% dari perhitungan konvensional dan perhitungan bekisting 2,5% lebih kecil dari perhitungan konvensional. Pada perhitungan Rencana Anggaran Pelaksanaan (RAP) The Canary Apartment untuk pekerjaan struktur.
=================================================================================================================================
Indicators of a country's progress can be seen from the level of infrastructure development in that country. Infrastructure development can take the form of buildings, roads and bridges. Talking about infrastructure development, we are no stranger to construction work. A construction project is a series of interdependent activities aimed at achieving certain goals within certain time, cost and quality constraints. Considering the limitations in construction projects, careful planning is required before construction projects are carried out on site.Building Information Modelling (BIM) is one way that can be done to reduce time and costs in project planning. This research was carried out using two methods. The first method is to model the building using BIM. Building modeling was carried out using one of the BIM applications, namely Revit. The output of this model is the volume of each structural element. Meanwhile, to calculate the duration, additional BIM applications are used, namelyNaviswork. Then the second method will appear, namely the classical calculation method. This general method requires the help of Autocad and Microsoft Excel. Apart from that, from these two methods the required volume of concrete and reinforcement will be obtained. Then continue calculating the productivity of workers and heavy equipment. Then proceed to calculate the duration and implement the implementation budget plan (RAP). Then an S-curve will be created to set the construction time. After all the calculations are complete, it can then be analyzed which method is more effective for project planning, namely the method using BIM or the classic method using Autocad and the Microsoft Excel application. This final assignment will discuss time and cost planning using BIM for development projects The Canary Apartment in South Tangerang. In this way, project delays and cost overruns can be minimized and 3D models of the project can be visualized on a combination of Revit and Naviswork software. Project The Canary Apartment This takes into account the Implementation Budget Plan (RAP) andQuantity Take-Off of the floor structurebasement 2 – 8th floor. After doing the calculationsQuantity Take-Off The results obtained from BIM method concrete calculations were 4.49% smaller than conventional calculations. Reinforcement calculations using the BIM method are 1.67% smaller than conventional calculations and formwork calculations are 2.5% smaller than conventional calculations. In calculating the Implementation Budget Plan (RAP)The Canary Apartment for structural work.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: BIM, Perencanaan Waktu dan Biaya, Konvensional, Time and Cost Planning, Conventional
Subjects: T Technology > TH Building construction > TH438.13 Building information modeling.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Alpan Mangantar Hutapea
Date Deposited: 11 Feb 2024 16:09
Last Modified: 11 Feb 2024 16:57
URI: http://repository.its.ac.id/id/eprint/106775