Estimasi Waktu dan Biaya Pelaksanaan Pembangunan Jalan Mammeh - Bintuni Provinsi Papua Barat

Manori, Freddy Denovo Oloan (2024) Estimasi Waktu dan Biaya Pelaksanaan Pembangunan Jalan Mammeh - Bintuni Provinsi Papua Barat. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 10111710017002_Undergraduate_Thesis.pdf] Text
10111710017002_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2026.

Download (4MB) | Request a copy

Abstract

Proyek ini merupakan perencanaan pelaksaan pekerjaan Pembangunan Jalan Mammeh – Bintuni. Perencanaan yang akan dilakukan terdiri dari penentuan item pekerjaan, perhitungan volume pekerjaan, penentuan sumber daya (tenaga kerja, material, dan alat), kapasitas produksi setiap jenis pekerjaan, dan manajemen pelaksanaanya. Data yang didapatkan dari tugas akhir ini berupa gambar kerja, volume pekerjaan, spesifikasi Teknik, dan jadwal pelaksanaan sebagai contoh untuk perencanaan. Gambar kerja digunakan untuk menghitung Kembali volume pekerjaan, spesifikasi teknis digunakan sebagai acuan landasan metode kerja, sedangkan jadwal pelaksanaan yang ada akan digunakan sebagai pembanding dari proyek akhir ini. Metode pelaksanaan untuk menentukan network planning (jaringan kerja), agar dapat mengetahui waktu pelaksanaan yang paling singkat dengan menggunakan Ms Project dihasilkan Kurva S. Perhitungan waktu biaya menggunakan sumber referrensi dari Permen PU No.1/PRT/M/2022 Tentang. Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum atau Analisa harga satuan daerah setempat, gambar kerja, spesifikasi teknis. Oleh karena itu tugas akhir ini membahas mengenai Estimasi Waktu dan Biaya Pelaksaaan Pembangunan Jalan Mammeh – Bintuni Provinsi Papua Barat. Berdasarkan perhitungan produktivitas dan analisa biaya dari semua pekerjaan didalam sumber daya yang dibutuhkan didapatkan hasil Rencana Anggaran Biaya pelaksanaan sebesar Rp 35.129.205.467. Dan waktu pelaksanaan proyek dapat dilaksanakan dengan waktu 235 hari kalender kerja. Kemudian didapat dari survei dilapangan untuk hasil risiko kecelakaan kerja yang sering terjadi selama pelaksanaan proyek yaitu pekerja tertabrak alat berat dan tertabrak kendaraan lalu lintas dilokasi pekerjaan.
=============================================================================================================================
This project is a plan for the implementation of the Mammeh – Bintuni Road Construction work. The planning that will be carried out consists of determining work items, calculating the volume of work, determining resources (labor, materials, and tools), production capacity for each type of work, and managing its implementation. The data obtained from this final project are in the form of working drawings, work volume, technical specifications, and implementation schedules as examples for planning. Working drawings are used to recalculate the volume of work, technical specifications are used as a basic reference for work methods, while the existing implementation schedule will be used as a comparison for this final project. The implementation method for determining network planning (network), in order to find out the shortest implementation time using the Ms Project is produced by the S Curve. The calculation of time costs uses reference sources from Permen PU No.28/PRT/M/2016 Concerning Work Unit Price Analysis Field of Public Works or Analysis of local area unit prices, working drawings, technical specifications. Therefore, this final project discusses the Estimated Time and Cost of Mammeh–Bintuni Road Construction Implementation, West Papua Province. Based on productivity calculations and cost analysis of all work within the required resources, the implementation budget plan results were IDR 35.129.205.467. And the project implementation time can be carried out within 235 working calendar days. Then obtained from field surveys the results of the risk of work accidents that often occur during project implementation, namely workers being hit by heavy equipment and being hit by traffic vehicles at the work site.

Item Type: Thesis (Other)
Uncontrolled Keywords: Waktu, Biaya, Analisa Harga Satuan, Time and Cost, Unit Price Analysis
Subjects: T Technology > TE Highway engineering. Roads and pavements > TE175 Road and highway design
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Freddy Denovo Oloan Manori
Date Deposited: 18 Feb 2024 13:17
Last Modified: 18 Feb 2024 14:13
URI: http://repository.its.ac.id/id/eprint/107331