Pratama, Ginanjar Setia (2024) Analisis Teknis dan Ekonomis Perencanaan PLT Hybrid Offshore Untuk Memenuhi Kebutuhan Energi Di Desa Ladan Kabupaten Anambas. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
5019211166-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 March 2026. Download (3MB) | Request a copy |
Abstract
Penelitian ini mengeksplorasi penerapan Pembangkit Listrik Tenaga Hybrid (PLT Hybrid) di Desa Ladan, Kecamatan Palmatak, Kabupaten Anambas, sebagai solusi alternatif untuk mengatasi ketergantungan wilayah terpencil Indonesia pada Pembangkit Listrik Tenaga Diesel (PLTD) dan tantangan pasokan bahan bakar minyak (BBM). Dengan memanfaatkan potensi blue energy yang berupa sinar matahari dan angin, penelitian ini bertujuan untuk mengembangkan skenario pembangkit listrik yang berkelanjutan dan menghitung biaya investasinya. Metodologi penelitian melibatkan pengumpulan data dari satelit NASA Power dan Badan Pusat Statistik (BPS) untuk analisis teknis dan ekonomis. Simulasi pembangkitan energi dilakukan menggunakan perangkat lunak HOMER, sementara analisis ekonomis menggunakan Microsoft Excel. Hasil penelitian menunjukkan bahwa PLT Hybrid dengan 5400 panel surya dan 780 turbin angin dapat memproduksi 3.621.294 kWh/tahun. Biaya investasi untuk instalasi laut diperkirakan sebesar Rp. 66.355.759.406 dengan titik breakeven tercapai pada tahun ke-19,5, sedangkan instalasi darat membutuhkan biaya investasi Rp. 69.840.752.839 dengan titik breakeven pada tahun ke-20,6. Penelitian ini memberikan wawasan penting dalam pengembangan sumber energi terbarukan di daerah kepulauan, menawarkan model yang efisien dan berkelanjutan untuk memenuhi kebutuhan energi di wilayah terpencil dengan memanfaatkan sumber daya lokal yang melimpah.
=====================================================================================================================================
This research explores the application of hybrid power plants in Ladan Village, Palmatak Sub-district, Anambas Regency, as an alternative solution to overcome the dependence of remote areas of Indonesia on diesel power plants and the challenges of fuel oil supply. By utilizing the potential of blue energy in the form of sunlight and wind, this research aims to develop a sustainable power generation scenario and calculate its investment cost. The research methodology involved collecting data from NASA Power satellites and the Central Bureau of Statistics (BPS) for technical and economic analysis. Energy generation simulation was conducted using HOMER software, while economic analysis used Microsoft Excel. The results showed that a hybrid power plant with 5400 solar panels and 780 wind turbines can produce 3,621,294 kWh/year. The investment cost for the marine installation is estimated at Rp. 66,355,759,406 with the breakeven point reached at year 19.5, while the land installation requires an investment cost of Rp. 69,840,752,839 with the breakeven point at year 20.6. This research provides important insights in the development of renewable energy sources in the islands, offering an efficient and sustainable model to meet energy needs in remote areas by utilizing abundant local resources.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Analisis Teknis, Analisis Ekonomis, Blue Energy, Energi Terbarukan, Technical Analysis, Economic Analysis, Blue Energy, Renewable Energy. |
Subjects: | T Technology > TJ Mechanical engineering and machinery > TJ808 Renewable energy sources. Energy harvesting. |
Divisions: | Faculty of Marine Technology (MARTECH) > Marine Engineering > 36202-(S1) Undergraduate Thesis |
Depositing User: | Ginanjar Setia Pratama |
Date Deposited: | 19 Feb 2024 08:57 |
Last Modified: | 19 Feb 2024 08:57 |
URI: | http://repository.its.ac.id/id/eprint/107586 |
Actions (login required)
View Item |