Akbar, Rhenima Azzahra (2024) Implementasi Berkelanjutan (Kaizen) Untuk Peningkatan Produktivitas Dengan Menggunakan Metode Line Balancing Pada Proses Packaging Brake Shoe PT. XYZ. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Text
10211910010001_Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 April 2026. Download (5MB) | Request a copy |
Abstract
PT. XYZ, Jakarta utara adalah salah satu perusahaan otomotif yang bergerak pada bidang komponen mobil dan motor. Pada Set Brake Shoe memiliki proses produksi sampai dengan packaging, pada salah satu set brake shoe yaitu line produksi brake shoe menyuplai packaging dan perakitan roda 2 sehingga tidak mampu memenuhi kebutuhan dan planing yang telah ditetapkan pada bulan April 2022, total waktu produksi per hari adalah 21 jam dengan total 3 Shiftt kebutuhan yang ditentukan bulan April 2022 yaitu 23.653 sepasang brake shoe actual yang dihasilkan 19.986 sepasang brake shoe. Dengan demikian produktivitas yang ada pada line brake shoe packaging belum optimal, sehingga perlu dilakukan perbaikan menggunakan Kaizen. Perbaikan Kaizen pada line brake shoe packaging terdapat dua yaitu managerial dan teknis, managerial pada line produksi brake shoe adalah memperbaiki efisiensi dan penyeimbangan produktivitas, sedangkan teknis adalah untuk mengoptimalkan print digital untuk mengliminasi penulisan manual dan hasil press karena Mesin press seharusnya menghasilkan 4 pcs sekali press tetapi secara aktual mesin press menghasilkan 3 pcs. Metode yang digunakan untuk meperbaiki proses packaging brake shoe agar optimal adalah mengunakan metode line balancing dan analisis konduktivitas pada plat penekan mesin press. Hasil implementasi perbaikan (kaizen) pada produksi dan packaging brake shoe dengan menggunakan metode Line Balancing memberikan dampak yang signifikan terhadap peningkatan produktivitas produksi memiliki efisiensi dari 39% menjadi 53% dan secara perhitungan dari 508 pasang brake shoe menjadi 553 pasang brake shoe sedangkan packaging memiliki efisiensi dari 62% menjadi 80% dan secara perhitungan dari 1.253 sepasang brake shoe atau 25 box menjadi 1.722 pasang brake shoe atau 34 box. Hasil konduktivitas plat dari 27,57 W/m dan luas yang di dapat 96% menjadi 28,33 W/m dan luas yang di dapat 100%.
=================================================================================================================================
T XYZ, North Jakarta is one of the automotive companies engaged in the field of carand motorcycle components. In the Brake Shoe Set has a production process up to packaging, in one of the brake shoe sets, namely the brake shoe production line supplies packaging and assembly of 2 wheels so that it is unable to meet the needs and plans that have been set in April 2022, the total production time per day is 21 hours with a total of 3 Shiftt needs determined in April 2022, namely 23,653 actual brake shoe pairs produced 19,986 brake shoe pairs. Thus the existing productivity in the brake shoe packaging line is not optimal, so improvements need to bemade using Kaizen. Kaizen improvement in the brake shoe packaging line there are two, namely managerial and technical, managerial in the brake shoe production line is to improve efficiency and balance productivity, while technical is to optimize digital printing to eliminate manual writing and press results because the press machine should produce 4 pcs once press but actually the press machine produces 3 pcs. The method used to improve the brake shoe packaging process to be optimal isto use the line balancing method and conductivity analysis on the press plate of the pressmachine. The results of the implementation of improvements (kaizen) in the production and packaging of brake shoes using the Line Balancing method have a significant impact on increasing production productivity has an efficiency of 39% to 53% and in calculation from 508 pairs of brake shoes to 553 pairs of brake shoes while packaging has an efficiency of 62% to80% and in calculation from 1,253 pairs of brake shoes or 25 boxes to 1,722 pairs of brake shoes or 34 boxes. The conductivity of the plate results from 27.57 W/m and the area obtained is 96% to 28.33 W/m and the area obtained is 100%.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Efficiency, Productivity, Line Balancing, Kaizen, Efisiensi, Produktivitas |
Subjects: | T Technology > TS Manufactures > TS183 Manufacturing processes. Lean manufacturing. |
Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
Depositing User: | Rhenima Azzahra Akbar |
Date Deposited: | 26 Feb 2024 00:31 |
Last Modified: | 28 Feb 2024 03:32 |
URI: | http://repository.its.ac.id/id/eprint/107704 |
Actions (login required)
View Item |