Mohosaso, Astyo Eso (2024) KESIAPAN PT X DALAM IMPLEMENTASI SISTEM MANAJEMEN LINGKUNGAN ISO 14001:2015 PADA PRODUKSI ENERGI TERBARUKAN PLTSA KOTA Y. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
5014201094_Astyo Eso Mohosaso_Tugas Akhir_compressed.pdf - Accepted Version Restricted to Repository staff only until 1 October 2026. Download (7MB) | Request a copy |
Abstract
ABSTRAK
Pengelolaan sampah merupakan salah satu isu penting yang dihadapi oleh banyak negara, termasuk Indonesia. Salah satu solusi yang dapat diterapkan untuk mengatasi masalah sampah adalah dengan memanfaatkan sampah sebagai sumber energi terbarukan. Pembangkit Listrik Tenaga Sampah (PLTSa) merupakan salah satu teknologi yang dapat digunakan untuk mengubah sampah menjadi energi listrik. PT X merupakan perusahaan di bidang pengelolaan sampah dan energi terbarukan. Perusahaan ini belum mengimplementasikan sistem manajemen lingkungan ISO 14001:2015.
Penelitian ini menggunakan metode kualitatif deskriptif. Hasil penelitian menunjukkan bahwa evaluasi dan analisis kesiapan implementasi Sistem Manajemen Lingkungan ISO 14001:2015 memberikan dampak positif terhadap kinerja lingkungan PT X dan operasi PLTSa Kota Y secara keseluruhan. Dampak positif tersebut meliputi, Peningkatan kesadaran lingkungan pada karyawan, Peningkatan efisiensi penggunaan sumber daya, Peningkatan pengendalian pencemaran, Peningkatan komunikasi dan kerja sama dengan pemangku kepentingan.
Dari penelitian ini diketahui bahwa PT X PLTSa Kota Y belum memenuhi standar dari klausul 4 hingga klausul 10 Sistem Manajemen Lingkungan (SML), dengan kinerja masih di bawah 100% dan nilai klausul 10 "perbaikan" mencapai 0%. Upaya telah dilakukan untuk memenuhi persyaratan SML dengan menyusun dokumen-dokumen seperti manual sistem manajemen lingkungan, prosedur operasional, dan instruksi kerja. Perhatian utama pada aspek lingkungan terfokus pada kegiatan produksi, terutama di unit gasifikasi, yang dapat menyebabkan pencemaran udara, ancaman terhadap kualitas air, dan dampak lingkungan lainnya. Hal ini menegaskan urgensi pengelolaan lingkungan yang hati-hati dalam operasi industri.
Kata kunci: Pengelolaan sampah, Energi terbarukan, PLTSa, ISO 14001:2015
============================================================
ABSTRACT
Waste management is an important issue faced by many countries, including Indonesia. One solution that can be applied to overcome the waste problem is to use waste as a renewable energy source. Waste Power Plant (PLTSa) is a technology that can be used to convert waste into electrical energy. PT X is a company in the field of waste management and renewable energy. This company has not implemented the ISO 14001:2015 environmental management system.
This research uses descriptive qualitative methods. The research results show that the evaluation and analysis of readiness to implement the ISO 14001:2015 Environmental Management System has had a positive impact on the environmental performance of PT These positive impacts include, increased environmental awareness among employees, increased efficiency in resource use, increased pollution control, increased communication and cooperation with stakeholders.
From this research it is known that PT Efforts have been made to fulfill EMS requirements by compiling documents such as environmental management system manuals, operational procedures and work instructions. The main attention to environmental aspects focuses on production activities, especially in gasification units, which can cause air pollution, threats to water quality and other environmental impacts. This emphasizes the urgency of careful environmental management in industrial operations.
Keywords: Waste management, Renewable energy, PLTSa, ISO 14001:2015
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Pengelolaan sampah, Energi terbarukan, PLTSa, ISO 14001:2015 Waste management, Renewable energy, PLTSa, ISO 14001:2015 |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering > TD194.6 Environmental impact analysis T Technology > TD Environmental technology. Sanitary engineering > TD195.B56 Biomass energy T Technology > TD Environmental technology. Sanitary engineering > TD890 Global Environmental Monitoring System T Technology > TD Environmental technology. Sanitary engineering > TD899.S68 Steam power plants |
Divisions: | Faculty of Civil Engineering and Planning > Environment Engineering > 25201-(S1) Undergraduate Thesis |
Depositing User: | Astyo Eso Mohosaso |
Date Deposited: | 02 Aug 2024 08:46 |
Last Modified: | 02 Aug 2024 08:46 |
URI: | http://repository.its.ac.id/id/eprint/109793 |
Actions (login required)
View Item |