Perencanaan Waktu dan Biaya Pekerjaan Struktur pada Proyek Pembangunan Apartemen Samaview Residence Malang Berbasis Building Information Modeling

Yunita, Dea Ayu (2024) Perencanaan Waktu dan Biaya Pekerjaan Struktur pada Proyek Pembangunan Apartemen Samaview Residence Malang Berbasis Building Information Modeling. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5012201024-Undergraduate_Thesis.pdf] Text
5012201024-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (16MB) | Request a copy

Abstract

Proyek konstruksi di Indonesia saat ini sedang berkembang pesat. Hal ini dibuktikan dengan banyaknya proyek pembangunan yang dilakukan oleh pemerintah maupun swasta salah satunya adalah pembangunan gedung bertingkat tinggi. Pada umumnya suatu proyek konstruksi yang dikerjakan akan selalu memiliki risiko tinggi. Hal tersebut yang akan menjadi acuan dasar mengapa perencanaan dan pelaksanaan dalam menyelesaikan pekerjaan proyek harus dilakukan secara tepat. Saat ini, tidak sedikit stakeholder proyek masih menggunakan metode perhitungan konvensional yang belum terintegrasi antara 3D hingga 7D yang berpotensi menimbulkan kesalahan human error sehingga menyebabkan harus adanya pekerjaan ulang (rework) yang berpengaruh terhadap durasi dan biaya proyek. Hal ini menuntut adanya inovasi teknologi untuk mempercepat penyelesaian proyek dan menekan biaya yang akan digunakan agar waktu dan biaya proyek sesuai dengan kontrak yang telah disepakati. Penggunaan Building Information Modeling (BIM) yang merupakan salah satu teknologi di bidang AEC (Architecture, Engineering, and Construction) mampu mengintegrasikan seluruh informasi bangunan ke dalam model 3D hingga 7D sehingga dapat mempercepat proses pekerjaan proyek konstruksi. Software pendukung yang digunakan pada penelitian ini adalah Tekla Structures. Analisis dilakukan dengan mengolah data primer dan sekunder yang telah didapatkan yaitu berupa Detail Engineering Design (DED) menjadi sebuah model 3D untuk menghasilkan Quantity Take-Off (QTO) berupa volume dan juga produktivitas sumber daya. Dari segi biaya, analisis dilakukan dengan menghitung volume, AHSP dan RAB. Dari segi waktu, analisis dilakukan dengan menghitung volume, produktivitas, durasi dan membuat penjadwalan dengan menggunakan Precedence Diagramming Method (PDM) yang kemudian diimplementasikan dengan BIM 4D menggunakan Task Manager pada Tekla Structures. Dari hasil analisis yang telah dilakukan, pekerjaan struktur atas memerlukan waktu 414 hari kerja dengan total biaya sebesar Rp 43.514.571.668,14.
==========================================================================================================================
The construction projects sector in Indonesia is currently experiencing rapid growth, as evidenced by the numerous development projects undertaken by both the government and the private sector, particularly high-rise buildings. However, construction projects inherently entail high risks. This fact underscores the importance of accurate planning and implementation in completing project work. Many project stakeholders still rely on conventional calculation methods that have not been integrated between 3D and 7D, increasing the potential for human error and necessitating rework, which adversely affects project duration and cost. The necessitates technological innovation to expedite project completion and reduce costs, ensuring adherence to contractual agreements. Building Information Modeling (BIM), a technology in the field of Architecture, Engineering, and Construction (AEC), offers a solution by integrating all building information into 3D to 7D models, thereby expediting construction project timelines. Tekla Structures serves as the supporting software. The analysis is carried out by processing the primary and secondary data obtained, namely in the form of Detail Engineering Design (DED), into a 3D model to produce Quantity Take-Off (QTO) in the form of volume and resource productivity. In terms of cost, the analysis is carried out by calculating volume, AHSP, and RAB. In terms of time, the study was carried out by calculating volume, productivity, duration, and scheduling using the Precedence Diagramming Method (PDM), which was then implemented with BIM 4D using the Task Manager in Tekla Structures. According to the results of the analysis that has been carried out, the upper structure work took 414 days, with a total cost of Rp 43.514.571.668,14.

Item Type: Thesis (Other)
Uncontrolled Keywords: Biaya, Building Information Modeling, Waktu, Cost, Building Information Modeling, Time
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Dea Ayu Yunita
Date Deposited: 01 Aug 2024 07:33
Last Modified: 01 Aug 2024 07:33
URI: http://repository.its.ac.id/id/eprint/110776