Yulianti, Alifa (2024) Perencanaan Perkuatan Lereng pada Area Tower 26 SUTET pada STA 15+250 - 15+325 Proyek Tol IKN Segmen 3A. Diploma thesis, Institut Teknologi Sepuluh Nopember.
Text
2035201058_Undergraduate Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2026. Download (11MB) | Request a copy |
Abstract
Pada proyek TOL IKN Segmen 3A terdapat pekerjaan galian yang membelah bukit pada STA 15+250 hingga STA 15+325 dimana terdapat menara Saluran Udara Tegangan Ekstra Tinggi (SUTET) Tower 26 yang apabila diaplikasikan ke dalam peraturan desain tipikal lereng galian dengan kemiringan 1:2, SUTET tersebut masuk ke dalam area yang harus digali. Oleh karena itu, perlu ada perencanaan perkuatan khusus agar tidak menganggu SUTET yang sudah ada disana.
Pada tugas akhir ini ini digunakan perkuatan lereng dengan metode soil nailing dan dinding penahan tanah tipe kantilever yang akan dianalisa secara manual dan menggunakan program bantu Geo5 & PLAXIS.Lereng yang digali adalah setinggi 38.71 m dari elevasi jalan dan digali dengan tipe galian lereng bervariasi dari jarak 20 m, 30 m, 40 m, dan 50 m. Tipe galian lereng pilihan yang dipiih dalam perencanaan tugas akhir ini adalah jarak 30 m dari kaki tower SUTET dengan kemiringan 1:1/2 dan tinggi trap 8 m.
Nilai faktor keamanan untuk metode perkuatan cantilever wall adalah SF = 1.601 dengan menggunakan program bantu Plaxis dan stabilitas dinding internal yang didapatkan dari analisa secara manual dan menggunakan program bantu GEO5-Cantilever Wall. Sedangkan nilai faktor keamanan untuk metode perkuatan soil nailing yang didapatkan dari program bantu Plaxis adalah SF = 2.277 dan stabilitas internal soil nailing yang dianalisa secara manual juga telah memenuhi persyaratan. Berdasarkan perhitungan biaya material pekerjaan, total biaya material yang dibutuhkan untuk pekerjaan cantilever wall adalah Rp 6.461.587.628,91 dan total biaya material pekerjaan soil nailing adalah Rp 6.177.745.512,69.Oleh karena itu, berdasarkan nilai keamanan yang lebih tinggi dan harga biaya pekerjaan yang lebih rendah, maka metode perkuatan lereng yang dipilih pada perencanaan perkuatan lereng pada area Tower SUTET No.26 STA 15+250 – 15+325 Proyek Tol IKN Segmen 3A ini adalah perkuatan lereng tipe soil nailing.
============================================================
In the IKN Segment 3A TOL project there is excavation work that splits the hill at STA 15 + 250 to STA 15 + 325 where there is a High Voltage Air Line Tower (SUTET) no.26 which when applied to the typical design regulations for excavation slopes with a slope of 1:2, the SUTET is included in the area that must be excavated. Therefore, there needs to design a reinforcement plan so the slop is not cutting the SUTET area that is already existing.
In this final project, slope reinforcement is implemented using the soil nailing method and cantilever-type retaining walls, which will be analyzed manually and with the assistance of Geo5 & PLAXIS programs. The excavated slope is 38.71 meters high from the road elevation and is excavated with varying slope types at distances of 20 meters, 30 meters, 40 meters, and 50 meters. The chosen slope type for this final project planning is at a distance of 30 meters from the base of the SUTET tower, with a slope of 1:1/2 and a bench height of 8 meters..
The safety factor value for the cantilever wall reinforcement method is SF = 1.601 using the Plaxis program and internal wall stability obtained from manual analysis and using the GEO5-Cantilever Wall program. While the safety factor value for the soil nailing reinforcement method obtained from the Plaxis program is SF = 2.277 and the internal stability of soil nailing analyzed manually also meets the requirements. Based on the calculation of work material costs, the total material cost required for cantilever wall work is Rp 6,461,587,628.91 and the total material cost of soil nailing work is Rp 6,177,745,512.69. Therefore, based on the higher safety value and lower cost price of the work, the slope reinforcement method that chosen in the slope reinforcement planning in the SUTET Tower No.26 STA 15+250 - 15+325 Toll Project IKN Segment 3A area is soil nailing reinforcement method.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Lereng, Stabilitas Lereng, Tanah, Soil Nailing, Dinding Penahan Tanah, Kantilever, Slope, Slope Stability, Soil. Soil Nailing, Cantilever Wall |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA760+ Retaining walls |
Divisions: | Faculty of Civil Engineering and Planning > Civil Engineering > 22301-(D4) Diploma 4 |
Depositing User: | Alifa Yulianti |
Date Deposited: | 05 Aug 2024 07:21 |
Last Modified: | 05 Aug 2024 07:21 |