Implementasi Building Information Modelling 5D Dalam Perencanaan Manajemen Konstruksi Proyek Normalisasi Saluran Flyover Pengganti JPL 64 Km 38+897 Lintas Surabaya-Solo

Nugraha, Agung Puja (2024) Implementasi Building Information Modelling 5D Dalam Perencanaan Manajemen Konstruksi Proyek Normalisasi Saluran Flyover Pengganti JPL 64 Km 38+897 Lintas Surabaya-Solo. Diploma thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2036201098_Agung Puja Nugraha_REPOSITORY.pdf] Text
2036201098_Agung Puja Nugraha_REPOSITORY.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (18MB) | Request a copy

Abstract

Meskipun diakui sebagai langkah progresif dalam industri konstruksi, Building Information Modeling (BIM) sebagai salah satu implementasi dari era revolusi industri 4.0 masih menghadapi tingkat adopsi ataupun implementasi yang rendah dalam penerapan di dunia konstruksi khususnya di Indonesia, meskipun mendapatkan pengakuan dari pemerintah. Penelitian ini bertujuan untuk menganalisis penerapan Building Information Modelling (BIM) 5D dalam perencanaan konstruksi normalisasi saluran flyover di Krian, Sidoarjo, dengan melakukan perbandingan terhadap perencanaan konstruksi tanpa BIM. Melalui pendekatan kualitatif dan kuantitatif, penelitian ini mencakup analisis waktu/pelaksanaan proyek sebagai fokus utama. Data dikumpulkan dari dokumen perencanaan proyek, jadwal kerja, rencana anggaran biaya dan wawancara dengan pihak terkait. Tahapan pelaksanaan dimulai dari pembuatan model 3D sehingga didapatkan model ilustrasi dan juga volume tiap pekerjaan kemudian dihitung produktivitas agar mendapatkan durasi untuk melakukan penjadwalan, dan juga dapat menghitung estimasi biaya berdasarkan AHS yang telah dibuat. Setelah ketiga data berupa model 3D, penjadwalan dan RAB didapatkan maka diintegrasikan dengan program Autodesk Naviswork untuk menyimulasikan BIM 5D. Hasil penelitian diharapkan memberikan pemahaman mendalam tentang efektivitas BIM 5D dalam perencanaan konstruksi normalisasi saluran flyover, khususnya dalam hal perhitungan volume dan perencanaan dibandingkan dengan metode konvensional. Penelitian ini diharapkan dapat memberikan panduan praktis bagi profesional konstruksi dan pihak terkait untuk mempertimbangkan dan mengadopsi teknologi ini dalam proyek-proyek infrastruktur serupa di masa depan. Proyek Pembangunan Normalisasi Saluran Flyover Pengganti JPL 64 Krian memiliki panjang 750 meter dengan pekerjaan utama adalah pekerjaan normalisasi saluran, pekerjaan jembatan permanen dan dinding penahan tanah. Berdasarkan hasil analisa diketahui bahwa rencana anggaran biaya dengan metode konvensional adalah sebesar Rp14,504,507,000.00 dan metode BIM sebesar Rp14,506,621,000.00 dengan waktu pelaksanaan kedua metode adalah sama yakni 36 hari kerja atau 50 hari kalender. Metode Building Information Modelling dalam perencanaan ini tergolong efisien karena memudahkan perencana dalam mengidentifikasi potensi konflik, menganalisis dampak perubahan desain, dan mengelola sumber daya dengan lebih efisien dengan adanya visualisasi yang terintegrasi dengan biaya dan juga penjadwalan. Jika dibandingkan dengan metode konvensional, perencanaan dengan menggunakan metode BIM mempermudah perencanaan dan lebih cepat dikarenakan integrasi antar data sehingga apabila terjadi perubahan ataupun kesalahan, dapat diperbaiki dengan lebih cepat.
=================================================================================================================================
Even though it is recognized as a progressive step in the construction industry, Building Information Modeling (BIM) as one of the implementations of the industrial revolution 4.0 era still faces a low level of adoption or implementation in construction practices, especially in Indonesia, even though it has received recognition from the government. This research aims to analyze the application of 5D Building Information Modeling (BIM) in construction planning for the waterway normalization of flyover in Krian, Sidoarjo, by comparing construction planning without BIM. Through qualitative and quantitative approaches, this research includes time analysis/project implementation as the main focus. Data was collected from project planning documents, work schedules, budget plans and interviews with related parties. The implementation stages start from making a 3D model so that an illustration of the model and also the volume of each job is obtained, then productivity is calculated to get the duration for scheduling, and you can also calculate cost estimates based on the unit price analysis that has been created. After the third data in the form of a 3D model, scheduling and budget plan is obtained, it is integrated with the Naviswork program for a 5D BIM simulation. The research results are expected to provide an in-depth understanding of the effectiveness of 5D BIM in planning the waterway normalization of flyover construction, especially in terms of volume calculations and planning compared with conventional methods. It is hoped that this research will provide practical guidance for construction professionals and related parties to consider and adopt this technology in similar infrastructure projects in the future.
Normalization of waterway on flyovers replacing direct crossing routes 64 project is 750 meters long with the main work being waterway normalization work, permanent bridge work and retaining walls. Based on the analysis results, it is known that the planned budget using the conventional method is Rp14,504,507,000.00 and the BIM method is Rp14,506,621,000.00 with the implementation time for both methods being the same, namely 36 working days or 50 calendar days. The Building Information Modeling method in planning is considered efficient because it makes it easier for planners to identify potential conflicts, analyze the impact of design changes, and manage resources more efficiently with visualization that is integrated with costs and scheduling. When compared to conventional methods, planning using the BIM method makes planning easier and faster due to integration between data so that if changes or errors occur, they can be corrected more quickly.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Building Information Modeling, Construction Management, Naviswork, Manajemen Konstruksi
Subjects: T Technology > T Technology (General) > T56.8 Project Management
T Technology > T Technology (General) > T57.62 Simulation
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Agung Puja Nugraha
Date Deposited: 22 Aug 2024 06:01
Last Modified: 22 Aug 2024 06:01
URI: http://repository.its.ac.id/id/eprint/112856