Optimasi Preventive Maintenance dengan Mempertimbangkan Availability dan Anggaran di Unit Pembangkit Menggunakan Goal Programming (Studi Kasus: PLTU X)

Aziz, Awaludin (2024) Optimasi Preventive Maintenance dengan Mempertimbangkan Availability dan Anggaran di Unit Pembangkit Menggunakan Goal Programming (Studi Kasus: PLTU X). Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032201025-Master_Thesis.pdf] Text
6032201025-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (3MB) | Request a copy

Abstract

Seiring perkembangan teknologi sektor ketenagalistrikan semakin memegang peran penting, hal ini disebabkan kebutuhan tenaga listrik semakin meningkat. Oleh karena itu, Pembangkit listrik harus mempertahankan tingkat ketersediaan yang tinggi untuk memenuhi harapan pelanggan. Selama operasi, masalah muncul ketika tingkat ketersediaan pembangkit cenderung menurun sementara tren biaya pemeliharaan meningkat. Penurunan ketersediaan dan peningkatan biaya pemeliharaan adalah konsekuensi potensial dari unplanned downtime, karena biaya perbaikan lebih tinggi daripada pemeliharaan preventif. Untuk menurunkan frekuensi gangguan tak terduga, sangat penting untuk melakukan pemeliharaan preventif. Namun demikian, frekuensi pemeliharaan preventif yang berlebihan dapat mengakibatkan peningkatan biaya perawatan dan periode scheduled downtime. Studi ini menyajikan model optimalisasi pemeliharaan preventif pada pembangkit listrik dengan menggunakan metode Goal Programning untuk memaksimalkan ketersediaan pembangkit dan meminimalkan total biaya pemeliharaan, termasuk biaya operasional dan investasi. Model ini menggunakan dua variabel keputusan, yaitu jadwal pemeliharaan dan tipe pemeliharaan. Tipe perawatan pada model ini antara lain inspeksi rutin, perawatan rutin, dan penggantian peralatan. Aktivitas pemeliharaan ini akan mempengaruhi ketersediaan peralatan dan ketersediaan unit pembangkit secara keseluruhan, berdasarkan konfigurasi operasi yang ditentukan dalam reliability block diagram. Hasil percobaan numerik menunjukkan bahwa model ini dapat mengoptimalkan ketersediaan pembangkit serta secara signifikan dapat menurunkan biaya pemeliharaan. Solusi optimal untuk ketersediaan pembangkit sebesar 87,34%, biaya pemeliharaan operasional turun menjadi 45% dari anggaran, dan biaya pemeliharan investasi turun menjadi 83.95% dari anggaran.
==================================================================================================================================
Power plants must maintain a high level of availability to fulfill the customer's expectations. During operations, an issue arises when the plant availability level tends to decrease while maintenance expenses rise. Decreasing availability and increasing maintenance expenses are potential consequences of unexpected failures, as corrective maintenance expenses are higher than preventive maintenance. To reduce the frequency of unexpected downtime, it is essential to perform preventive maintenance. Nevertheless, an excessive frequency of preventive maintenance may result in increased maintenance expenses and periods of scheduled shutdown. This study presents a preventive maintenance optimization model for power plants using the goal programming approach to maximize plant availability while minimizing maintenance expenses, including operational and investment costs. This model utilizes two decision variables, namely maintenance schedules and maintenance types. The maintenance types are routine inspection, routine maintenance, and equipment replacement. This maintenance activity will affect the equipment's and the plant's overall availability based on the operating configurations specified in the reliability block diagram. Numerical experiments show that the model can optimize availability while significantly reducing maintenance costs, achieving an optimal availability of 87.34%. Operational maintenance costs are reduced to 45.00%, while investment maintenance costs are reduced to 83.95% of the budget.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Goal Programming, Optimasi, Pembangkit, Tingkat Ketersediaan, Availability, Optimization, Power Plant, Preventive Maintenance
Subjects: T Technology > T Technology (General) > T57.6 Operations research--Mathematics. Goal programming
T Technology > T Technology (General) > T58.62 Decision support systems
T Technology > TA Engineering (General). Civil engineering (General) > TA169 Reliability (Engineering)
T Technology > TA Engineering (General). Civil engineering (General) > TA169.5 Failure analysis
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Awaludin Aziz
Date Deposited: 10 Sep 2024 08:04
Last Modified: 10 Sep 2024 08:04
URI: http://repository.its.ac.id/id/eprint/113129