Abstract

Fly ash merupakan sisa abu hasil pembakaran batu bara yang ikut terbawa oleh flue gas. Dalam boiler, fly ash dapat menyebabkan penyumbatan sekaligus korosi pada air preheater. Fenomena ini mengharuskan PLTU Tanjung Awar-Awar untuk mengganti air preheater tiap tahunnya. Beberapa hopper dipasangkan pada economizer outlet untuk menangkap fly ash dan perlu sistem saluran pembuangan yang efisien. Tujuan dari penelitian ini yaitu untuk menganalisa jenis-jenis sistem saluran pembuangan economizer hopper dan mengetahui karakteristik dari jenis-jenis sistem tersebut. Penelitian ini dilakukan menggunakan metode CFD Ansys Fluent. Variasi yang digunakan dalam penelitian ini adalah sistem saluran pembuangan langsung dan sistem saluran pembuangan dengan storage tank, setiap variasi divariasikan ukuran pipanya berupa pipa nominal diameter 36 dan 30. Sistem saluran pembuangan langsung memerlukan waktu 60 detik untuk membuang seluruh fly ash dalam economizer hopper, sementara sistem pembuangan dengan storage tank memerlukan waktu 195 detik. Sistem saluran pembuangan langsung menghasilkan kecepatan conveying line lebih rendah daripada pembuangan dengan storage tank. Sistem saluran pembuangan langsung memiliki conveying line pressure yang mendekati 1 atm, sementara sistem saluran pembuangan dengan storage tank memiliki conveying line pressure lebih rendah. Conveying line temperature sistem saluran pembuangan dengan storage tank pada outlet lebih rendah akibat adanya pendinginan dari blower. Semakin kecil ukuran pipa yang digunakan sebagai saluran pembuangan, maka semakin besar kecepatan conveying line yang akan terjadi. Semakin kecil ukuran pipa yang digunakan, maka semakin besar pressure yang ada dalam conveying line. Temperature outlet dari conveying line akan mengecil seiring dengan mengecilnya ukuran pipa yang digunakan.
========================================================================================================
Fly ash is the residual ash resulting from the combustion of coal that is carried along by flue gas. In boilers, fly ash can cause both blockages and corrosion in the air preheater. This phenomenon necessitates the Tanjung Awar-Awar Power Plant to replace the air preheater annually. Several hoppers are installed at the economizer outlet to capture fly ash, requiring an efficient disposal system. The objective of this research is to analyze the types of economizer hopper disposal systems and determine which system is the best. This research was conducted using the CFD Ansys Fluent method. The variations used in this study are the direct disposal system and the disposal system with a storage tank, with each variation using different pipe sizes, namely ND 36 and ND 30 pipes. The direct disposal system requires 60 seconds to remove all the fly ash in the economizer hopper, while the disposal system with a storage tank requires 195 seconds. The direct disposal system produces a lower conveying line speed than the disposal system with a storage tank. The direct disposal system has a conveying line pressure close to 1 atm, whereas the disposal system with a storage tank has a lower conveying line pressure. The conveying line temperature at the outlet of the disposal system with a storage tank is lower due to cooling from the blower. The smaller the size of the pipe used as a drainage channel, the greater the conveying line speed that will occur. The smaller the size of the pipe used, the greater the pressure in the conveying line. The outlet temperature of the conveying line will decrease as the size of the pipe used decreases.

Item Type: Thesis (Other)
Uncontrolled Keywords: Conveying Line, Fly Ash, Hopper
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ164 Power plants--Design and construction
T Technology > TJ Mechanical engineering and machinery > TJ263.5 Boilers (general)
Divisions: Faculty of Industrial Technology and Systems Engineering (INDSYS) > Mechanical Engineering > 21201-(S1) Undergraduate Thesis
Depositing User: Muhammad Bintang Fajar
Date Deposited: 12 Aug 2024 06:58
Last Modified: 12 Aug 2024 06:58
URI: http://repository.its.ac.id/id/eprint/114350

Actions (login required)

View Item View Item