Jutawan, Diki Ardis (2024) Analisa Perhitungan Waktu dan Biaya Proyek Gedung Smart Automation PENS Menggunakan Bekisting Aluminium. Other thesis, Institut Teknologi Sepuluh Nopember.
Text
10111710010014_Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (9MB) |
Abstract
Proyek konstruksi sering kali menghadapi tantangan dalam hal efisiensi biaya dan
waktu pelaksanaan, yang mempengaruhi keberhasilan proyek secara keseluruhan. Metode
bekisting merupakan salah satu faktor kunci yang dapat mempengaruhi kedua aspek tersebut.
Penelitian ini bertujuan untuk menganalisis perhitungan biaya dan waktu pelaksanaan proyek
konstruksi dengan menggunakan metode bekisting aluminium. Bekisting aluminium dipilih
karena keunggulannya dalam hal kekuatan, ringan, dan kemudahan pemasangan yang dapat
mempengaruhi efisiensi kerja..
Metode penelitian ini melibatkan studi kasus proyek Gedung Smart Automation
Workshop PENS Surabaya, pada awalnya proyek ini menggunakan bekisting semi sistem,
namun penulis mencoba menganalisis kembali menggunakan bekistimg aluminium, pada
analisisnya berfokus hanya pada struktur atas proyek yaitu balok, pelat, kolom, shearwall dan
tangga dari mulai lantai Ground hingga lantai 12.
Maka didapatkan hasil perhitungan yang telah dilakukan, dan ditinjau dari segi biaya
didapatkan keperluan biaya dengan metode bekisting aluminium sebesar Rp 26.042.879.116
sedangkan jika ditinjau dari segi waktu diperlukan 259 hari kerja untuk menyelesaikan proyek
ini.
Kata kunci : Bekisting Aluminium, Bekisting Semi Sistem, waktu pelaksanaan, biaya
pelaksanaan, rencana anggaran biaya
============================================================
Construction projects often face challenges in terms of cost efficiency and
implementation time, which affect the overall success of the project. The formwork method is
one of the key factors that can affect both aspects. This study aims to analyze the calculation of
the cost and implementation time of a construction project using the aluminum formwork
method. Aluminum formwork is chosen because of its advantages in terms of strength, light
weight, and ease of installation which can affect work efficiency.
This research method involves a case study of the Smart Automation Workshop PENS
Surabaya Building project, initially this project used semi-system formwork, but the author
tried to re-analyze it using aluminum formwork, in his analysis focused only on the upper
structure of the project, namely beams, plates, columns, shearwalls and stairs from the ground
floor to the 12th floor.
So the results of the calculations that have been carried out are obtained, and in terms
of costs, the cost requirements for the aluminum formwork method are Rp. 26,042,879,116,
while in terms of time, 259 working days are needed to complete this project.
Key words : Aluminium formwork, semi-system formwork, implementation times,
implementation cost, cost budget plan
Item Type: | Thesis (Other) |
---|---|
Depositing User: | DIKI ARDIS JUTAWAN |
Date Deposited: | 12 Aug 2024 07:43 |
Last Modified: | 12 Aug 2024 07:43 |
URI: | http://repository.its.ac.id/id/eprint/114430 |
Actions (login required)
View Item |