OPTIMASI PADA PROSES BISNIS BERDASARKAN MULTI-PERSPEKTIF MENGGUNAKAN METODE HYBRID UNTUK MEMPERBAIKI PROSES DWELLING TIME DI PT TERMINAL PELABUHAN PETIKEMAS SURABAYA

Prasetyo, Hanung Nindito (2024) OPTIMASI PADA PROSES BISNIS BERDASARKAN MULTI-PERSPEKTIF MENGGUNAKAN METODE HYBRID UNTUK MEMPERBAIKI PROSES DWELLING TIME DI PT TERMINAL PELABUHAN PETIKEMAS SURABAYA. Doctoral thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 7025201008-Dissertation.pdf] Text
7025201008-Dissertation.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (8MB) | Request a copy

Abstract

Since 2014 to 2021, the Indonesian government has been working hard to improve the dwelling time process throughout the major ports of Indonesia. According to Marine Traffic Data for 2017, Indonesia is among the countries with the slowest dwelling time process among ASEAN countries. Dwelling time processes in Indonesia are on average over three days. By 2021, the government has planned that, before 2024, the dwelling time process should be able to be done in one day. To that end, the evaluation and improvement of the dwelling time process is one of the solutions to the problem. In scientific studies, the best method for conducting system-based process evaluation is to use the process mining approach. In previous studies, process modelling problems were extensively studied with the trace clustering method. But this approach focuses only on the perspective of process control. In a process, there are other perspectives that also influence the course of the process, such as workloads, resources, waiting times, and other indicators called multi-perspectives.
Based on the discussion, the study proposes business process optimization from a multi-perspective perspective. A business process optimization method that combines process mining, job shop, and multivariate clustering and is collaborated with a hybrid method with a dynamic system simulation approach, discrete event simulation, and agent-based simulation to optimize business processes with Multi Criteria Decision Making (MCDM). As for the dataset used in this research, the dataset event log Process Dwelling time from PT Port Terminal Petikemas Surabaya. The results showed a decrease in asynchronous waiting time (AWT) of 75.24% and process cost efficiency of 8.47%. TPS staff performance improved by 3.33%, customs and quarantine staff performed by 9.52%, and PLP staff increased by 3.84%. The predictions of the dynamic system showed that the number of containers leaving the port increased by 0.2% from the selected simulation alternative.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: Optimization, Business Process, Multi-perspective, Dwelling time, Hybrid Method. Optimasi, Proses Bisnis, Multi perspektif, Dwelling time, Metode Hybrid.
Subjects: T Technology > T Technology (General) > T57.5 Data Processing
T Technology > T Technology (General) > T57.62 Simulation
T Technology > T Technology (General) > T58.6 Management information systems
Divisions: Faculty of Intelligent Electrical and Informatics Technology (ELECTICS) > Informatics Engineering > 55001-(S3) PhD Thesis (Comp Science)
Depositing User: Hanung Nindito Prasetyo
Date Deposited: 07 Aug 2024 07:32
Last Modified: 07 Aug 2024 07:32
URI: http://repository.its.ac.id/id/eprint/114740

Actions (login required)

View Item View Item