Optimasi Transportasi Sampah Dan Pemilihan Lokasi Tempat Pemrosesan Akhir (TPA) Kota Surabaya Dengan Metode Integer Programming

Damayanti, Febrianda (2024) Optimasi Transportasi Sampah Dan Pemilihan Lokasi Tempat Pemrosesan Akhir (TPA) Kota Surabaya Dengan Metode Integer Programming. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6032202041 _ Master_Thesis.pdf] Text
6032202041 _ Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 October 2026.

Download (1MB) | Request a copy

Abstract

Peningkatan jumlah timbulan sampah suatu kota dipengaruhi oleh beberapa hal, diantaranya tingkat pendapatan, pola konsumtif, dan jumlah penduduk. Data BPS Kota Surabaya (2023) menunjukkan peningkatan jumlah penduduk sebesar 5370 jiwa dalam satu tahun. Data Dinas Lingkungan Hidup Provinsi Jawa Timur menunjukkan peningkatan rata-rata volume sampah Kota Surabaya sebesar 15314 ton/tahun dalam kurun waktu tiga tahun. Penelitian ini mempertimbangkan efektivitas lokasi Tempat Pembuangan Akhir (TPA), faktor jarak dan kapasitas TPA serta Tempat Pengumpulan Sementara (TPS), kapasitas dan waktu operasional truk pengangkut sampah, dan jenis sampah. Rencana pengelolaan sampah mencakup 5 TPA, 15 TPS, dan truk dengan kapasitas 100 kg, 180 kg, dan 260 kg. Jenis sampah yang diperhitungkan meliputi organik, anorganik, dan Bahan Berbahaya dan Beracun (B3). Jumlah sumber daya manusia (SDM) dan ketersediaan truk per TPA juga menjadi pertimbangan. Untuk mengatasi permasalahan terkait kapasitas TPA yang melebihi kapasitas telah dilakukan permodelan matematis dengan menggunakan metode integer programming. Penelitian ini bertujuan untuk mengurangi total biaya yang berkaitan dengan pengangkutan dan pemrosesan sampah dengan memilih kombinasi rute transportasi dan lokasi TPA yang paling efisien. Fungsi objektif yang ditetapkan mencerminkan biaya transportasi yang bergantung pada jarak dan jumlah sampah yang diangkut, serta biaya tetap yang berkaitan dengan pengoperasian setiap TPA. Hasil dari pemodelan matematis integer programming menunjukkan, berdasarkan 5 TPA yang direncanakan, 3 TPA terpilih optimal dapat menampung timbulan sampah Kota Surabaya yang terdiri dari 3 karakteristik sampah dari 15 TPS dan diangkut menggunakan 3 jenis kapasitas truk yaitu 100 kg, 180 kg, dan 260 kg. Total biaya minimum untuk Pembangunan 3 TPA optimum Kota Surabaya sebesar Rp 16,142,930,000dengan total kebutuhan lahan TPA optimum sebesar 267386 m2.
=================================================================================================================================
The amount of waste generated in a city is influenced by several things, including income level, consumption patterns, and population. Surabaya City BPS data (2023) shows an increase in population of 5370 people in one year. Data from the East Java Province Environmental Service shows an increase in the average volume of Surabaya City waste of 15314 metric tons per year over a period of three years. This research considers the effectiveness of the location of the Final Disposal Site (TPA), the distance and capacity of the TPA and Temporary Collection Site (TPS), the capacity and operational time of the waste transport truck, and the type of waste. The waste management plan includes 5 TPA, 15 TPS, and trucks with capacities of 100 kg, 180 kg, and 260 kg. The types of waste are organic, inorganic, and hazardous and toxic materials (B3). The number of human resources (HR) and availability of trucks per TPA are also taken into consideration. To overcome problems related to landfill capacity exceeding capacity, mathematical modeling has been carried out using the integer programming method. This research aims to reduce the total costs associated with transporting and processing waste by selecting the most efficient combination of transportation routes and landfill locations. The defined objective function reflects transportation costs that depend on the distance and amount of waste transported, as well as fixed costs related to the operation of each landfill. The results of the integer programming mathematical modeling show that, based on the 5 planned TPA, the 3 selected TPA can optimally accommodate the waste generation of Surabaya City, which consists of 3 characteristics of waste from 15 TPS and is transported using 3 types of truck capacities, namely 100 kg, 180 kg, and 260 kg. The minimum total cost for the construction of three optimum landfills for the city of Surabaya is IDR 16,142,930,000with a total landfill land requirement of 267386 m2 .

Item Type: Thesis (Masters)
Uncontrolled Keywords: Biaya Minimum, Integer Programming, Sampah Perkotaan, Sistem Transportasi Sampah, Tempat Pemrosesan Akhir (TPA).
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 61101-Master of Technology Management (MMT)
Depositing User: Febrianda Damayanti
Date Deposited: 13 Aug 2024 04:22
Last Modified: 13 Aug 2024 04:23
URI: http://repository.its.ac.id/id/eprint/115033

Actions (login required)

View Item View Item