Shaleh, Ibrahim (2024) Analisis Repowering MP Bandar Madani Sebagai Percontohan Kapal Listrik Untuk Mendukung Pelabuhan Parepare Sebagai Green Port. Masters thesis, Institut Teknologi Sepuluh Nopember.
Text
6019221003-Master_Thesis.pdf - Accepted Version Restricted to Repository staff only until 1 October 2026. Download (14MB) | Request a copy |
Abstract
Pelindo berkomitmen untuk mengembangkan green port demi mengurangi emisi karbon dan menciptakan pelabuhan yang berkelanjutan. Kemenko Marves targetkan 149 pelabuhan menerapkan green dan smart port pada 2024, termasuk Pelabuhan Parepare. Wilayah kerja Pelabuhan Parepare termasuk dalam Perairan Wajib Pandu kelas III meliputi Pelabuhan Penumpang, Pertamina, Cargo, dan PLTD. Salah satu kapal pandu di Pelabuhan Parepare akan dilakukan repowering menjadi full electric guna mendukung green port. Proses desain kapal repowering melalui tahapan concept, preliminary, dan detail desain. Motor listrik kapal pandu memiliki daya 54,5 kW tegangan 345 Volt, baterai 228 Ah tegangan 348 Volt, dan charger type fast charging kapasitas 6600 watt tegangan 200 - 420 Volt.
===================================================================================================================================
Pelindo is committed to developing green ports to reduce carbon emissions and create sustainable ports. The Coordinating Ministry for Maritime Affairs and Investment targets 149 ports to implement green and smart ports by 2024, including the Port of Parepare. The working area of the Port of Parepare is included in the mandatory Class III pilotage waters including Passenger Ports, Pertamina, Cargo, and PLTD. One of the pilot ships in the Port of Parepare will be converted to full electric to support the green port. The design process for the repowering ship goes through the concept, preliminary, and detailed design stages. The electric motor of the pilot ship has a power of 54.5 kW with a voltage of 345 Volts, a 228 Ah battery with a voltage of 348 Volts, and a fast charging type charger with a capacity of 6600 watts with a voltage of 200 - 420 Volts
Item Type: | Thesis (Masters) |
---|---|
Uncontrolled Keywords: | Green Port, Repowering, Kapal Pandu, Motor Listrik |
Subjects: | V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering > VM773 Ship propulsion, Electric |
Divisions: | Faculty of Marine Technology (MARTECH) > Marine Engineering > 36101-(S2) Master Theses |
Depositing User: | Ibrahim shaleh |
Date Deposited: | 10 Aug 2024 13:56 |
Last Modified: | 26 Aug 2024 04:38 |
URI: | http://repository.its.ac.id/id/eprint/115220 |
Actions (login required)
View Item |