Proses Konstruksi Struktur Baja Pada Proyek Copper Cleaner (Pembersihan Tembaga)

Wibowo, Wahyu Kusumo (2024) Proses Konstruksi Struktur Baja Pada Proyek Copper Cleaner (Pembersihan Tembaga). Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 8044231058-Undergraduate_Thesis.pdf] Text
8044231058-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2027.

Download (31MB) | Request a copy

Abstract

Proyek Copper Cleaner Project (Pembersihan Tembaga)–PT. Freeport Indonesia dibangun sebagai perluasan pengolahan tembaga di area 74 Tembagapura, Papua. Konstruksi baja pada proyek ini sangat dibutuhkan sebagai fasilitas pengolahan tembaga, jalur pipa, dan struktur tangki. Berdasarkan latar belakang di tersebut, kegiatan yang akan dibahas dalam laporan praktik ini difokuskan pada proses konstruksi baja dan Job Safety Analysis (JSA) pada pekerjaan konstruksi baja. Sehingga didapatkan tujuan dari praktik ini adalah untuk memahami proses konstruksi baja dan memahami JSA yang diterapkan pada proses konstruksi baja. Praktik dilaksanakan di Proyek Copper Cleaner Project (Pembersihan Tembaga–PT. Freeport Indonesia, Tembagapura, Papua. Waktu pelaksanaan kegiatan praktik ini adalah selama 4 bulan yang dimulai dari Mei sampai Agustus hingga 96 hari kerja atau disesuaikan dengan kebijakan PT. Petrosea sebagai fasilitator dan pembuat kebijakan dalam penempatan pelaksanaan kegiatan praktik keinsinyuran. Waktu praktik keinsinyuran dilaksanakan 6 hari kerja dalam seminggu (Senin–Sabtu) dari pukul 05.30 WIT sampai dengan 16.30 WIT. Kegiatan yang dilakukan pada saat praktik keinsinyuran pada intinya adalah kegiatan tentang pengetahuan mengenai kondisi proyek, selebihnya kegiatan yang dilakukan merupakan segala kegiatan yang berhubungan dengan proses konstruksi konstruksi baja. Pengawasan kegiatan proyek dilakukan untuk meningkatkan kelancaran operasi proyek konstruksi, meniadakan kesalahan, dan mencegah terulang kembalinya kesalahan. Pada proyek Copper Cleaner Project (Pembersihan Tembaga), penulis melakukan pengawasan terhadap pekerjaan proyek konstruksi baja yang sedang dilaksanakan serta melakukan analisis terhadap pengawasan kegiatan proyek yang sedang berlangsung. Metode pengumpulan data yang dipergunakan dalam kegiatan ini adalah data laporan yang didapatkan dari wawancara dengan manajer proyek dan data lapangan yang didapatkan secara pengamatan langsung. Kesimpulan dari penelitian ini adalah pengawasan yang efektif tidak hanya mengurangi frekuensi kesalahan, tetapi juga meningkatkan kesadaran akan keselamatan di lapangan.
=================================================================================================================================
The Copper Cleaner Project–PT Freeport Indonesia Project is built as an expansion of copper processing in the 74 Tembagapura area, Papua. Steel construction in this project is highly needed for copper processing buildings, pipeline routes, and tank support structures. Based on the background above, the activities to be discussed in this report are focused on the steel construction process and Job Safety Analysis (JSA) in steel construction work. Thus, the aim of this practice is to understand the steel construction process and comprehend the JSA applied to the steel construction process. The practice was conducted at the Copper Cleaner Project–PT. Freeport Indonesia, Tembagapura Papua. The duration of the practice activity is for 4 months, starting from May to August, with 80 working days, or adjusted according to the policy of PT. Petrosea as the facilitator and policy maker in the placement of engineering practice activities. The engineering practice is conducted for 6 working days a week (Monday-Saturday) from 05:30 AM to 04:30 PM. The activities carried out during the engineering practice essentially involve gaining knowledge about the project conditions, while the rest of the activities are related to the steel construction erection process.
Project activity supervision is conducted to improve the smooth operation of the construction project, eliminate errors, and prevent repeated mistakes. In the Copper Cleaner Project, the author supervises the ongoing steel construction project work and analyzes the supervision of the ongoing project activities. The data collection method used in this activity is the data obtained from interviews with project managers and field data obtained through direct observation. The conclusion of this study emphasizes that effective supervision not only reduces the frequency of errors but also increases safety awareness on-site.

Item Type: Thesis (Other)
Uncontrolled Keywords: Proses konstruksi struktur baja, Pengawasan, Steel structure construction process, Job Safety Analysis, Supervision
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA660.F7 Structural frames.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 23902-Engineer Professional Program
Depositing User: Wahyu Kusumo Wibowo
Date Deposited: 19 Dec 2024 06:58
Last Modified: 19 Dec 2024 06:58
URI: http://repository.its.ac.id/id/eprint/116017