Analisis Risiko Pekerjaan Penggantian Subsea Hose pada Single Point Mooring (SPM) #3 PT Pertamina Hulu Energi ONWJ

Ananda, Zakiyya Al Fakhira (2025) Analisis Risiko Pekerjaan Penggantian Subsea Hose pada Single Point Mooring (SPM) #3 PT Pertamina Hulu Energi ONWJ. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5046211018-Undergraduate_Thesis.pdf] Text
5046211018-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2027.

Download (17MB) | Request a copy

Abstract

Subsea hose replacement pada SPM#3 merupakan proyek PT. Pertamina Hulu Energi Offshore North West Java. Subsea hose merupakan bagian dari product transfer system pada SPM. Mengingat peran subsea hose dalam transfer minyak atau gas dari kapal tanker ke fasilitas penyimpanan di darat sangat penting, maka diperlukan pemeliharaan/ penggantian secara teratur setiap 5-7 tahun untuk menghindari kebocoran (leak) yang dapat menyebabkan terhentinya produksi. Namun, pada pekerjaan penggantian subsea hose ini banyak langkah-langkah yang berpotensi mengakibatkan kegagalan dan kerugian yang akan mempengaruhi berbagai pihak terkait. Pada Tugas Akhir ini, akan dibahas mengenai risk assessment pada pekerjaan penggantian subsea hose dengan tujuan mengidentifikasi potensi kegagalan dan pengendalian risiko tersebut. Dalam penelitian ini dilakukan analisis risiko untuk mengetahui tingkat kategori dari nilai keparahan (konsekuensi) dan nilai kejadian (probability) dengan metode FMEA (Failure Mode and Effect Analysis). Metode FMEA merupakan salah satu metode untuk menganalisis suatu risiko. Setelah dilakukan analisis risiko dengan metode FMEA, lalu dilanjutkan dengan evaluasi risiko menggunakan risk matrix, kemudian diberikan strategi mitigasi pada potensi kegagalan pekerjaan penggantian subsea hose pada SPM #3 dnegan melakukan pengendalian risiko atau risk controlling. Dari analisis kualitatif yang sebelumnya di identifikasi dengan metode FMEA, maka beberapa tahapan operasi perlu dilakukan identifikasi dengan menggunakan metode kuantitatif. Penggunaan metode kuantitatif ini bertujuan untuk mengetahui kegagalan sistem yang diambil guna mendapatkan gambaran optimal operasi di lapangan.
===================================================================================================================================
Subsea hose replacement at SPM#3 is a project of PT Pertamina Hulu Energi Offshore North West Java. The subsea hose is part of the product transfer system on the SPM. Considering the role of the subsea hose in the transfer of oil or gas from the tanker to the onshore storage facility is very important, it requires regular maintenance/replacement every 5-7 years to avoid leaks that can cause production to stop. However, in this subsea hose replacement project, there are many steps that have the potential to cause failures and losses that will affect various related parties. In this Final Project, we will discuss the risk assessment of subsea hose replacement project with the aim of identifying potential failures and controlling these risks. In this research, risk analysis is carried out to determine the category level of severity (consequences) value and occurrence (probability) value using the FMEA (Failure Mode and Effect Analysis) method. The FMEA method is one method to analyze a risk. After analyzing the risk with the FMEA method, then proceed with risk evaluation using the risk matrix, then a mitigation strategy is given to the potential failure of the subsea hose replacement project at SPM #3 by carrying out risk control. From the qualitative analysis previously identified by the FMEA method, several stages of the operation need to be identified using quantitative methods. The use of this quantitative method aims to determine the failure of the system taken to get an optimal overview of operations in the field.

Item Type: Thesis (Other)
Uncontrolled Keywords: Risk Assessment, Single Point Mooring, Subsea Hose, FMEA Method, Quantitative Method, Metode FMEA, Metode Kuantitatif
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC1665 Offshore structures--Materials.
Divisions: Faculty of Marine Technology (MARTECH) > Offshore Engineering > 54040-(S1) Undergraduate Thesis
Depositing User: Zakiyya Al Fakhira Fita Ananda
Date Deposited: 25 Jan 2025 03:31
Last Modified: 25 Jan 2025 03:31
URI: http://repository.its.ac.id/id/eprint/116633

Actions (login required)

View Item View Item