Perhitungan Waktu Dan Biaya Pembangunan Terowongan Bangunan Pelimpah Pada Proyek Bendungan Sidan Kabupaten Badung, Bangli, Gianyar, Provinsi Bali

Jamil, Faiq Fakhruddin (2025) Perhitungan Waktu Dan Biaya Pembangunan Terowongan Bangunan Pelimpah Pada Proyek Bendungan Sidan Kabupaten Badung, Bangli, Gianyar, Provinsi Bali. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2036201009_Undergraduate_Thesis.pdf] Text
2036201009_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only until 1 April 2027.

Download (26MB) | Request a copy

Abstract

Bendungan Sidan adalah salah satu proyek strategis dalam pengelolaan sumber daya air di wilayah Kabupaten Badung, Bangli, dan Gianyar Provinsi Bali. Proyek ini dirancang untuk memenuhi berbagai kebutuhan, termasuk irigasi, pengendalian banjir, penyediaan air baku, dan potensi pembangkit listrik tenaga air. Terowongan pelimpah dirancang untuk mengalirkan kelebihan air dari waduk ke hilir bendungan secara terkendali. Ini sangat penting selama periode hujan deras atau saat volume air yang masuk ke waduk melebihi kapasitas penyimpanannya. Pada proyek akhir ini bertujuan untuk menyusun metode pelaksanaan, menghitung waktu pelaksanaan dan menghitung biaya pelaksanaan dalam pembangunan terowongan pelimpah pada Bendungan Sidan. Pengumpulan data yang dilakukan yaitu gambar kerja, spesifikasi teknis, HSPK Bali, dan data-data penunjang lainnya. Penyusunan proyek akhir ini melibatkan identifikasi item pekerjaan, perhitungan volume, dan perhitungan produktivitas, serta kebutuhan pekerja. Dari pembahasan tersebut nantinya akan didapatkan durasi pekerjaan serta rencana anggaran pelaksanaan. Lalu dilanjutkan dengan penyusunan penjadwalan proyek dengan menggunakan software Microsoft Project. Hasil dari software ini didapatkan total durasi dan didapatkan hasil berupa kurva S. Hasil dari analisa perhitungan dan pembahasan didapatkan jumlah kebutuhan alat berat yang digunakan, kebutuhan tenaga kerja, durasi waktu pelaksanaan kontruksi, network planning, dan kurva S. Didapatkan durasi waktu pelaksanaan proyek pembangunan terowongan pelimpah Bendungan Sidan selama 618 hari kalender kerja dengan jam kerja efektif selama 7 jam kerja dengan rencana anggaran pelaksanaan sebesar Rp32,509,854,165.
======================================================================================================================================
Sidan Dam is one of the strategic projects in water resource management in the Badung, Bangli, and Gianyar Regencies of Bali Province. This project is designed to meet various needs, including irrigation, flood control, raw water supply, and potential hydroelectric power generation. The spillway tunnel is designed to channel excess water from the reservoir to the downstream of the dam in a controlled manner. This is crucial during periods of heavy rainfall or when the volume of water entering the reservoir exceeds its capacity.This final project aims to develop the implementation method, calculate the execution time, and estimate the implementation costs for the construction of the spillway tunnel at Sidan Dam. Data collection includes working drawings, technical specifications, HSPK Bali, and other supporting data. The preparation of this final project involves identifying work items, calculating volumes, productivity calculations, and workforce requirements. From this discussion, the project duration and implementation budget plan will be obtained. This will be followed by project scheduling using Microsoft Project software. The results from this software will provide the total duration and an S-curve.The results of the calculation analysis and discussion determine the number of heavy equipment needed, workforce requirements, construction execution duration, network planning, and the S-curve. The project duration for the construction of the Sidan Dam spillway tunnel is found to be 618 calendar working days with an effective working time of 7 hours per day and an implementation budget plan amounting to Rp32,509,854,165.

Item Type: Thesis (Other)
Uncontrolled Keywords: Terowongan Pelimpah, Perhitungan Waktu, Perhitungan Biaya, Penjadwalan=============================================================================================================Spillway Tunnel, Time Calculation, Cost Calculation, Scheduling
Subjects: T Technology > T Technology (General) > T56.8 Project Management
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: FAIQ FAKHRUDDIN JAMIL
Date Deposited: 06 Feb 2025 08:43
Last Modified: 06 Feb 2025 08:43
URI: http://repository.its.ac.id/id/eprint/118476