Pengawasan Pembangunan TPS 3R Tambak Wedi Kota Surabaya

Rosyidin, Ahsanul Fikri (2025) Pengawasan Pembangunan TPS 3R Tambak Wedi Kota Surabaya. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 8044241224-Undergraduate_Thesis.pdf] Text
8044241224-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (102MB) | Request a copy

Abstract

Pengawasan konstruksi merupakan aspek krusial dalam memastikan kualitas, keamanan, dan keberlanjutan suatu proyek infrastruktur. Pengawasan yang tepat bertujuan untuk memantau dan mengevaluasi setiap tahapan proses konstruksi agar sesuai dengan spesifikasi teknis, perencanaan, dan regulasi yang berlaku. Dalam praktiknya, pengawasan melibatkan berbagai aspek, mulai dari inspeksi material dan metode kerja, pengelolaan sumber daya, hingga pemantauan dampak lingkungan yang dihasilkan oleh kegiatan konstruksi. Pengelolaan sampah yang efektif dan berkelanjutan menjadi salah satu tantangan utama di kawasan perkotaan, termasuk di Surabaya. Salah satu upaya untuk mengatasi masalah ini adalah dengan membangun TPS 3R (Tempat Pengelolaan Sampah dengan konsep Reduce, Reuse, Recycle) di Tambakwedi, Surabaya. TPS 3R ini bertujuan untuk mengurangi jumlah sampah yang dibuang ke TPA (Tempat Pembuangan Akhir) melalui pengelolaan sampah yang melibatkan daur ulang, penggunaan kembali, serta pengurangan sampah sejak dari sumbernya. Pengawasan yang optimal dalam pembangunan TPS 3R sangat penting agar kualitas konstruksi, kesesuaian dengan spesifikasi teknis, serta kepatuhan terhadap regulasi dapat terjamin.Studi ini bertujuan untuk mengidentifikasi dan menerapkan metode pengawasan yang tepat selama proses pembangunan TPS 3R di Tambakwedi. Pengawasan mencakup aspek teknis konstruksi, dampak lingkungan, administrasi proyek, serta partisipasi masyarakat. Melalui pengawasan yang menyeluruh, diharapkan pembangunan TPS 3R dapat dilaksanakan sesuai dengan rencana, menghasilkan fasilitas yang optimal, dan mendukung perbaikan pengelolaan sampah di Tambakwedi.
===================================================================================================================================
Construction supervision is a crucial aspect in ensuring the quality, safety and sustainability of an infrastructure project. Proper supervision aims to monitor and evaluate each stage of the construction process so that it complies with technical specifications, plans, and applicable regulations. In practice, supervision involves various aspects, ranging from inspection of materials and work methods, resource management, to monitoring the environmental impacts generated by construction activities. Effective and sustainable waste management is one of the main challenges in urban areas, including in Surabaya. One of the efforts to overcome this problem is to build TPS 3R (Waste Management Site with the concept of Reduce, Reuse, Recycle) in Tambakwedi, Surabaya. This TPS 3R aims to reduce the amount of waste disposed of to landfill (Final Disposal Site) through waste management that involves recycling, reuse, and reduction of waste from its source. Optimal supervision in the construction of TPS 3R is very important so that construction quality, compliance with technical specifications, and compliance with regulations can be guaranteed. This study aims to identify and apply appropriate supervision methods during the construction process of TPS 3R in Tambakwedi. The supervision covers technical aspects of construction, environmental impacts, project administration, and community participation. Through comprehensive supervision, it is expected that the construction of TPS 3R can be implemented according to plan, produce optimal facilities, and support improved waste management in Tambakwedi.

Item Type: Thesis (Other)
Uncontrolled Keywords: Kata Kunci : Pengawasan, TPS 3R, Pembangunan, Sampah, Surabaya Keywords: Supervision, TPS 3R, Development, Waste, Surabaya
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction > TH1461 Concrete construction.
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 23902-Engineer Professional Program
Depositing User: Ahsanul Fikri Rosyidin
Date Deposited: 24 Jul 2025 05:47
Last Modified: 24 Jul 2025 05:47
URI: http://repository.its.ac.id/id/eprint/119166

Actions (login required)

View Item View Item