Shabrina, Nadhifah Dini (2025) Analisis Stabilitas Transien pada Sistem Kelistrikan Jawa Barat yang Terintegrasi dengan PLTS Jatiluhur. Other thesis, Institut Teknologi Sepuluh Nopember.
![]() |
Text
5022211004-Undergraduate_Thesis.pdf - Accepted Version Restricted to Repository staff only Download (3MB) | Request a copy |
Abstract
Pembangkit Listrik Tenaga Surya (PLTS) menjadi bagian strategis dalam mendukung peningkatan kontribusi energi terbarukan (EBT), serta sebagai upaya untuk memenuhi kebutuhan energi di sistem Jawa Madura Bali (Jamali). Sistem kelistrikan Jawa Barat merupakan bagian dari sistem kelistrikan Jamali yang menghubungkan jaringan di Jawa Tengah, Banten, dan Jakarta. Pembangunan PLTS Jatiluhur berkapasitas 80 MW di Jawa Barat memengaruhi stabilitas sistem tenaga listrik akibat sifat intermiten dan rendahnya inersia. Oleh karena itu, dilakukan pemodelan PLTS Jatiluhur serta analisis dampaknya terhadap stabilitas transien menggunakan perangkat lunak PowerFactory Digsilent melalui tiga studi kasus yaitu pelepasan pembangkit, gangguan hubung singkat pada saluran transmisi, dan pelepasan beban besar. Respon sudut rotor, tegangan, dan frekuensi diamati untuk menilai kinerja sistem. Hasil penelitian menunjukkan bahwa integrasi PLTS Jatiluhur memperpanjang waktu pemutusan kritis (CCT) dan membantu menjaga kestabilan sistem dalam batas operasi yang aman.
===================================================================================================================================
Solar Power Plants play a strategic role in supporting the increased contribution of renewable energy (RE) and in meeting the energy demands of the Java-Madura-Bali (Jamali) electricity system. The West Java electricity system is part of the Jamali electricity system, which connects the networks in Central Java, Banten, and Jakarta. The construction of the 80 MW Jatiluhur Solar Photovoltaic (PV) System in West Java impacts power system stability due to its intermittent nature and low inertia. Therefore, a model of the Jatiluhur Solar PV System was developed, and its impact on transient stability was analyzed using PowerFactory Digsilent software through three case studies: generator shedding, short-circuit faults on transmission lines, and load shedding. Rotor angle, voltage, and frequency responses were observed to assess system performance. The results indicate that the integration of the Jatiluhur Solar PV System extends the critical clearing time (CCT) and helps maintain system stability within acceptable operational limits.
Actions (login required)
![]() |
View Item |