Optimasi Alat Berat Pada Pekerjaan Galian Proyek Pembangunan Dermaga Pangkalan Setokok Tahap II

Nurhidayaturahman, Akmal (2025) Optimasi Alat Berat Pada Pekerjaan Galian Proyek Pembangunan Dermaga Pangkalan Setokok Tahap II. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 5012211146_Undergraduate Theses.pdf] Text
5012211146_Undergraduate Theses.pdf - Accepted Version
Restricted to Repository staff only

Download (9MB) | Request a copy

Abstract

Pembangunan dermaga di Pulau Setokok, Batam, penting untuk mendukung mobilisasi dan keamanan TNI. Namun, proyek ini menghadapi tantangan seperti kondisi tanah yang tidak rata dan efisiensi penggunaan alat berat. Pengelolaan alat berat yang tidak optimal dapat menyebabkan keterlambatan, biaya tinggi, dan risiko kecelakaan. Faktor lingkungan, perencanaan yang kurang matang, dan koordinasi yang lemah juga memengaruhi kinerja proyek. Oleh karena itu, penelitian ini bertujuan untuk menentukan alat berat yang digunakan, menghitung produktivitas masing-masing alat, serta membandingkan biaya sebelum dan sesudah optimasi. Optimasi alat berat diperlukan agar proyek berjalan efisien dan tepat waktu. Excavator digunakan untuk menggali tanah keras, sementara dump truck memindahkan material ke lokasi lain. Metode Linear menjadi salah satu opsi untuk melakukan optimasi alat berat, dengan menghitung produktivitas alat berat dan menjadikan beberapa kombinasi alternatif sebagai persamaan, maka dapat ditentukan kombinasi alternatif yang paling optimal sebagai kombinasi alternatif pilhan. Dari hasil analisis alat berat menggunakan program linear didapatkan hasil alat berat yaitu 1 buah Excavator Caterpillar 329D dan 2 buah Dump Truck dengan kapasitas 30 m3, dengan biaya Rp 14.176.000.
===================================================================================================================================
The construction of a dock on Setokok Island, Batam, is crucial to support the mobility and security of the Indonesian National Armed Forces (TNI). However, the project faces several challenges, such as uneven soil conditions and inefficiency in the use of heavy equipment. Poor management of heavy machinery can lead to delays, increased costs, and safety risks. Environmental factors, inadequate planning, and weak coordination also affect the project’s performance. Therefore, this study aims to identify the types of heavy equipment used, calculate the productivity of each unit, and compare costs before and after optimization. Heavy equipment optimization is essential to ensure the project runs efficiently and is completed on time. Excavators are used for digging hard soil, while dump trucks transport materials to other locations. The Linear Method is one of the approaches used to optimize the use of heavy equipment. By calculating equipment productivity and formulating various alternative combinations into equations, the most optimal alternative can be identified as the preferred choice. Based on the analysis using the linear programming method, the optimal equipment combination consists of one Caterpillar 329D excavator and two dump trucks with a capacity of 30 m³, resulting in a total cost of IDR 14,176,000.

Item Type: Thesis (Other)
Uncontrolled Keywords: Alat Berat, Dermaga, Metode Linear
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA660.P55 Underground pipeline design, construction and management
Divisions: Faculty of Civil, Planning, and Geo Engineering (CIVPLAN) > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: Akmal Nurhidayaturahman
Date Deposited: 29 Jul 2025 06:55
Last Modified: 29 Jul 2025 06:55
URI: http://repository.its.ac.id/id/eprint/122846