Studi Kelayakan Teknis Dan Ekonomi Pemasangan PLTS Atap On-Grid Pada Gedung Administrasi PLTU Jawa 7

Prasetyo, Ibnu Syaifullah (2025) Studi Kelayakan Teknis Dan Ekonomi Pemasangan PLTS Atap On-Grid Pada Gedung Administrasi PLTU Jawa 7. Masters thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 6047212025-Master_Thesis.pdf] Text
6047212025-Master_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (3MB) | Request a copy

Abstract

Energi di Indonesia masih didominasi oleh energi fosil, terutama Pembangkit Listrik Tenaga Uap (PLTU) yang berbahan bakar batu bara. Meskipun batu bara memiliki keunggulan dalam hal ketersediaan dan biaya yang rendah, penggunaannya menghasilkan emisi gas rumah kaca yang berkontribusi terhadap polusi udara. Untuk mengatasi masalah tersebut, pemerintah Indonesia melalui Rencana Umum Penyediaan Tenaga Listrik (RUPTL) 2021–2030 berkomitmen untuk meningkatkan porsi energi terbarukan hingga 23% pada tahun 2025 dan
mengurangi emisi gas rumah kaca sebesar 29% pada tahun 2030. Fokus penelitian ini adalah simulasi pemasangan Pembangkit Listrik Tenaga Surya (PLTS) on-grid dan juga hybrid di gedung administrasi PLTU Jawa 7, dimana akan dievaluasi dari
sisi teknis maupun ekonomi. Setelah menganalisa energi harian pada gedung administrasi PLTU Jawa 7, dihasilkan perancangan PLTS on-grid dan hybrid memiliki kapasitas sebesar 1 kWp, dengan modul PV 400 Wp sebanyak 3 buah dan
inverter berkapasitas 1 kWp serta baterai VRLA 12 V 100 Ah sebanyak 14 buah. Sistem PLTS on-grid gedung administrasi PLTU Jawa 7 menghasilkan energi listrik sebesar 1.784,2 kWh pertahun sedangkan PLTS hybrid menghasilkan 1.656,17 kWh Berdasarkan simulasi menggunakan software PVSysyt, nilai performance ratio yang didapatkan PLTS on-grid sebesar 81,2% sedangkan pada PLTS hybrid 75,4%. Pada analisis ekonomi, dengan investasi awal sebesar Rp 18.635.000, perhitungan kelayakan investasi menunjukkan nilai NPV sebesar Rp 14.432.180, BCR sebesar 1,77, dan IRR sebesar 11,62%. Sedangkan payback period yang dibutuhkan adalah 9 tahun 5 bulan. Maka dari itu pada perancangan sistem PLTS pada gedung administrasi PLTU Jawa 7 layak untuk dilakukan. Pada analisis ekonomi PLTS hybrid, dengan nilai investasi awal sebesar Rp 36.835.000, perhitungan kelayakan investasi menunjukkan nilai NPV sebesar Rp -6.209.155, BCR sebesar 0,83, dan IRR sebesar 4,07%. Sedangkan payback period yang dibutuhkan adalah 18 tahun 7 bulan. Maka dari itu pada perancangan sistem PLTS hybrid pada gedung administrasi PLTU Jawa 7 tidak layak untuk dilakukan.
========================================================================================================================================
Indonesia’s energy needs are still dominated by fossil energy, especially coal-fired power plants (PLTU), which rely heavily on coal. While coal has advantages in availability and low cost, its use results in greenhouse gas emissions that significantly contribute to air pollution. To address this issue, the Indonesian government, through the 2021–2030 Electricity Supply Plan (RUPTL), is committed to increasing the share of renewable energy to 23% by 2025 and reducing greenhouse gas emissions by 29% by 2030. This study focuses on the simulation of rooftop solar photovoltaic (PLTS) installations, both on-grid and hybrid, on the administration building of PLTU Jawa 7, evaluating the design from both technical and economic perspectives. After analyzing the daily energy load of the building, the designed PLTS system has a capacity of 1 kWp using three 400 Wp PV modules and a 1 kW inverter. The hybrid system includes 14 VRLA 12 V 100 Ah batteries. Simulation results show that the on-grid PLTS system produces 1,784.2 kWh/year, while the hybrid system produces 1,656.17 kWh/year. Using PVsyst software, the performance ratio for the on-grid system is 81.2%, compared to 75.4% for the hybrid system. From the economic perspective, with an initial investment of Rp 18,635,000, the on-grid system yields a Net Present Value (NPV) of Rp 14,432,180, a Benefit-Cost Ratio (BCR) of 1.77, and an Internal Rate of Return (IRR) of 11.62%. The payback period is estimated at 9 years and 5 months, indicating the on-grid system is feasible for implementation. Meanwhile, the hybrid system, with an investment cost of Rp 36,835,000, results in a negative NPV of Rp –6,209,155, a BCR of 0.83, and an IRR of only 4.07%. The payback period for this system is 18 years and 7 months. Therefore, the study concludes that the on-grid PLTS system is more feasible for implementation at the PLTU Jawa 7 administration building compared to the hybrid configuration.

Item Type: Thesis (Masters)
Uncontrolled Keywords: Energi Terbarukan, Pembangkit Listrik Tenaga Surya, on-grid, hybrid, analisis teknis, analisis ekonomi, Renewable Energy, Solar Power Plant, On-Grid System, Hybrid System, Technical Analysis, Economic Analysis
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ808 Renewable energy sources. Energy harvesting.
T Technology > TJ Mechanical engineering and machinery > TJ810.5 Solar energy
Divisions: Interdisciplinary School of Management and Technology (SIMT) > 78201-System And Technology Innovation
Depositing User: Ibnu Syaifullah Prasetyo
Date Deposited: 01 Aug 2025 01:39
Last Modified: 01 Aug 2025 01:39
URI: http://repository.its.ac.id/id/eprint/124898

Actions (login required)

View Item View Item