Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) Pada Pembangunan Proteksi Pipa, Jembatan Pengubung dan Jalan Utama JIIPE Gresik

Hafiza, Faradita Putri (2025) Perencanaan Sistem Manajemen Keselamatan Konstruksi (SMKK) Pada Pembangunan Proteksi Pipa, Jembatan Pengubung dan Jalan Utama JIIPE Gresik. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2035211008_Undergraduate_Thesis.pdf] Text
2035211008_Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (20MB) | Request a copy

Abstract

Penerapan Sistem Manajemen Keselamatan Konstruksi (SMKK) pada proyek pembangunan Proteksi Pipa, Jembatan Penghubung dan Jalan Utama di kawasan JIIPE Gresik, yang memiliki STA +000 – STA +379 dengan bentang sepanjang 379m. Mengingat pentingnya keselamatan pekerja dan tingginya potensi risiko dalam proyek konstruksi, penelitian ini bertujuan untuk mengidentifikasi bahaya, menilai risiko, dan merumuskan pengendalian yang efektif. Penelitian ini berlandaskan pada Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No. 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Kerja dan Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No. 08 Tahun 2023 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi. Dalam penyusunan Proyek Akhir Perencanaan SMKK ini menggunakan metode HIRARC (Hazard Identification Risk Assessment Risk Control) untuk pencegahan dan pengurangan potensi terjadinya kecelakaan kerja, menghindari dan meminimalkan risiko terjadinya kecelakaan kerja serta pengendaliannya yang terdapat pada item pekerjaan proyek ini. Serta merencanakan Rencana Anggaran Biaya (RAB) untuk perencanaan SMKK. Hasil penelitian menunjukkan bahwa penerapan SMKK pada proyek ini mampu mengidentifikasi 247 potensi bahaya yang tersebar pada seluruh pekerjaan. Dengan total bahaya untuk pengendalian awal 19 risiko kecil, 198 risiko sedang dan 30 risiko besar. Setelah dilakukan mitigasi lanjutan didapatkan total bahaya 247 dengan risiko kecil. Penyusunan RAB SMKK didapatkan sebesar Rp.1.006.889.970, dengan nilai kontrak sebesar Rp.76.266.502.318. Maka didapatkan presentase nilai Rencana Anggaran Biaya SMKK dari kontrak proyek yaitu sebesar 1,32%.
===========================================================================================================================================
Implementation of the Construction Safety Management System (SMKK) on the construction project of Pipe Protection, Connecting Bridges and Main Roads in the JIIPE Gresik area, which has STA +000 – STA +379 with a span of 379m. Considering the importance of worker safety and the high potential risks in construction projects, this research aims to identify hazards, assess risks, and formulate effective controls. This research is based on the Regulation of the Minister of Public Works and Public Housing No. 10 of 2021 concerning Guidelines for Work Safety Management Systems and Regulation of the Minister of Public Works and Public Housing No. 08 of 2023 concerning Guidelines for Preparing Construction Work Cost Estimates. In preparing the SMKK Final Planning Project, the HIRARC (Hazard Identification Risk Assessment Risk Control) method was used to prevent and reduce the potential for work accidents, avoid and minimize the risk of work accidents and control them in the work items of this project. As well as planning the Budget Plan (RAB) for SMKK planning. The results of the study showed that the application of SMKK on this project was able to identify 247 potential hazards spread throughout the work. With a total of hazards for initial control of 19 small risks, 198 medium risks and 30 large risks. The preparation of the SMKK RAB was obtained at Rp. 1.006.889.970, with a contract value of Rp. 76.266.502.318. So the percentage of the SMKK Cost Budget Plan value from the project contract was 1.32%.

Item Type: Thesis (Other)
Uncontrolled Keywords: Perencanaan SMKK, Metode HIRARC, SMKK Jembatan SMKK Planning, HIRARC Method, Bridge SMKK
Subjects: T Technology > T Technology (General) > T55.3.H3 Hazardous substances--Safety measures.
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Faradita Putri Hafiza
Date Deposited: 01 Aug 2025 08:25
Last Modified: 01 Aug 2025 08:25
URI: http://repository.its.ac.id/id/eprint/125926

Actions (login required)

View Item View Item