Zakaria, Achmad Firli (2024) Analisa Presentase Produktifvitas pada Proses Produksi pada PT.X. Project Report. [s.n], [s.l.]. (Unpublished)
![]() |
Text
2038211037-Project_Report.pdf - Accepted Version Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
Laporan akhir magang industri ini disusun berdasarkan kegiatan magang yang dilaksanakan di PT. X, sebuah perusahaan karoseri bus yang berlokasi di Malang, Jawa Timur. Fokus utama kegiatan magang adalah melakukan evaluasi terhadap proses produksi, khususnya pada divisi sub-assembly (sub-assy), dengan menggunakan metode time study sebagai alat analisis. Tujuan dari penggunaan metode ini adalah untuk mengetahui tingkat produktivitas, efisiensi kerja, serta waktu standar dalam proses produksi. Pengumpulan data dilakukan melalui observasi langsung di lapangan dan pencatatan waktu proses kerja menggunakan perangkat digital. Hasil pengamatan menunjukkan adanya ketidakefisienan pada beberapa elemen kerja, disebabkan oleh faktor teknis dan non-teknis seperti metode kerja yang belum optimal, keterampilan operator yang bervariasi, dan kondisi alat kerja. Berdasarkan temuan tersebut, disusun beberapa usulan perbaikan untuk meningkatkan efisiensi proses produksi, antara lain pengaturan ulang tata letak kerja, pelatihan tenaga kerja, serta pemanfaatan teknologi pendukung. Melalui penerapan time study secara sistematis, perusahaan dapat meningkatkan produktivitas kerja, mengurangi pemborosan waktu, dan memperbaiki kualitas kinerja lini produksi secara keseluruhan.
================================================================================================================================
This final internship report is based on the industrial internship activities conducted at PT. X, a bus body manufacturing company located in Malang, East Java. The main focus of the internship was to evaluate the production process, particularly in the sub-assembly (sub-assy) division, using the time study method as an analytical tool. The purpose of this method was to determine productivity levels, work efficiency, and standard times in the production process. Data was collected through direct field observation and time recording using digital tools. The observations revealed inefficiencies in several work elements, caused by both technical and non-technical factors such as suboptimal working methods, varying operator skills, and equipment conditions. Based on these findings, several improvement proposals were formulated, including workflow restructuring, workforce training, and the use of supporting technologies. Through the systematic implementation of time study, the company is expected to improve work productivity, reduce time waste, and enhance overall performance on the production line.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Magang Industri, Time Study, Produktivitas, Sub-Assy, Efisiensi Produksi,Industrial Internship, Time Study, Productivity, Sub-Assembly, Production Efficiency |
Subjects: | T Technology > T Technology (General) T Technology > TS Manufactures > TS155 Production control. Production planning. Production management T Technology > TS Manufactures > TS176 Manufacturing engineering. Process engineering (Including manufacturing planning, production planning) T Technology > TS Manufactures > TS183 Manufacturing processes. Lean manufacturing. |
Divisions: | Faculty of Vocational > Mechanical Industrial Engineering (D4) |
Depositing User: | Achmad Firli Zakaria |
Date Deposited: | 01 Aug 2025 09:27 |
Last Modified: | 01 Aug 2025 09:27 |
URI: | http://repository.its.ac.id/id/eprint/126146 |
Actions (login required)
![]() |
View Item |