Simulasi Pemanfaatan Air Bendungan Cijurey Kabupaten Bogor.

Sabrina, Nuril (2025) Simulasi Pemanfaatan Air Bendungan Cijurey Kabupaten Bogor. Other thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 2036211026-Undergraduate_Thesis.pdf] Text
2036211026-Undergraduate_Thesis.pdf - Accepted Version
Restricted to Repository staff only

Download (14MB)

Abstract

Bendungan Cijurey terletak di kabupaten Bogor, Jawa Barat. Bendungan ini dibangun dengan tujuan untuk memenuhi kebutuhan air irigasi dan air baku untuk masyarakat setempat. Selain itu, bendungan juga bermanfaat untuk menampung debit banjir. Untuk mencapai keseimbangan dalam distribusi air waduk, dilakukan analis optimasi dengan tujuan memaksimalkan tampungan waduk. Selain itu, bendungan Cijurey juga dimanfaatkan sebagai pembangkit listrik. Maka dari itu, dilakukan analisis potensi energi listrik yang dihasilkan dari pembangkit listrik.
Analisis optimasi pola operasi, dilakukan dengan melakukan analisis pengaruh bukaan pintu radial pada Pelimpah. Dari hasil analisis optimasi, didapatkan bahwa waduk mampu memenuhi kebutuhan air baku untuk kecamatan Sukamakmur dan Cariu sebesar 0.38 m3/detik dan dapat memenuhi kebutuhan air baku industri maksimal sebesar 0.99 m3/detik. Selain itu, pada analisis potensi pembangkit listrik didapatkan bahwa energi listrik yang dihasilkan adalah 535.86 MwH. Direncanakan pola tanam dengan Padi – Padi – Padi. Dari hasil analisis waduk mampu mempertahankan muka air efektif pada periode akhir dan memenuhi kebutuhan air dengan memanfaatkan pengaruh operasi pintu radial pelimpah, didapatkan hasil memenuhi kebutuhan air baku dan kebutuhan air irigasi dengan pola tanam Padi – Padi – Padi dengan intensitas 300%dengan memanfaatkan pengaruh pola operasi pintu radial pada pelimpah.

========================================================================================================================
The Cijurey Dam is located in Bogor Regency, West Java. This dam was built to meet the irrigation and raw water needs of the local community. In addition, the dam is also useful for storing flood discharge. To achieve a balance in reservoir water distribution, an optimization analysis was carried out with the aim of maximizing reservoir storage. In addition, the Cijurey Dam is also used as a power plant. Therefore, an analysis of the potential electrical energy generated by the power plant was conducted.
Optimization analysis of the operating pattern was carried out by analyzing the effect of radial gate openings on the spillway. From the results of the optimization analysis, it was found that the reservoir is able to meet the raw water needs for Sukamakmur and Cariu sub-districts of 0.38 m3/second and can meet the maximum industrial raw water needs of 0.99 m3/second. In addition, the analysis of the potential for power generation showed that the electrical energy produced is 535.86 MwH. The planned planting pattern is paddy – paddy – paddy. From the results of the analysis, the reservoir is able to utilize the influence of the radial gate operation of the spillway, obtaining results to meet the raw water needs and irrigation water needs with a paddy – paddy – paddy planting pattern with an intensity of 300% by utilizing the optimization of the influence of the radial gate operation pattern on the spillway..

Item Type: Thesis (Other)
Uncontrolled Keywords: Bendungan Cijurey, Optimasi, Irigasi, Air Baku, Pembangkit Listrik, Cijurey Dam, Optimization, Irrigation, Raw Water, Power Plant.
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC167 Dams, reservoirs
T Technology > TC Hydraulic engineering. Ocean engineering > TC812 Irrigation
Divisions: Faculty of Vocational > Civil Infrastructure Engineering (D4)
Depositing User: Nuril Sabrina
Date Deposited: 04 Aug 2025 01:32
Last Modified: 04 Aug 2025 01:32
URI: http://repository.its.ac.id/id/eprint/126297

Actions (login required)

View Item View Item