PENGARUH PEMANFAATAN GOT MIRING SEBAGAI PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO PADA NILAI MANFAAT BIAYA (BENEFIT COST RATIO) SALURAN B.LT-9 DI DESA PLADEN KECAMATAN JEKULO KABUPATEN KUDUS

ULFIANA, DESYTA (2016) PENGARUH PEMANFAATAN GOT MIRING SEBAGAI PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO PADA NILAI MANFAAT BIAYA (BENEFIT COST RATIO) SALURAN B.LT-9 DI DESA PLADEN KECAMATAN JEKULO KABUPATEN KUDUS. Undergraduate thesis, Institut Teknologi Sepuluh Nopember.

[thumbnail of 3112100053-Undergraduate_Theses.pdf]
Preview
Text
3112100053-Undergraduate_Theses.pdf - Published Version

Download (3MB) | Preview

Abstract

Pembangkit listrik tenaga mikrohidro (PLTMH) adalah
suatu pembangkit listrik skala kecil dengan kapasitas daya yang
dihasilkan kurang dari 100 kW. Pembangkit ini memanfaatkan
energi potensial jatuhan air yang diubah menjadi energi listrik.
Saluran irigasi B.Lt-9 di Desa Pladen mengairi DI Logung Timur
seluas 701 Ha. Saluran ini memiliki got miring dengan beda
elevasi dasar saluran kurang lebih 4,9 meter yang berpotensi untuk
dimanfaatkan sebagai PLTMH. Desa Pladen sedang mengalami
kekurangan energi akibat kurangnya pasokan listrik dari PLN.
Pembuatan pembangkit listrik tenaga mikro hidro pada saluran ini
dapat memberikan manfaat tambahan pada got miring dan
menjadi solusi alternatif untuk mengatasi permasalahan
kekurangan listrik tersebut. Dalam hal ini, pemanfaatan got miring
sebagai pembangkit listrik tenaga mikro hidro dapat memberikan
pengaruh pada nilai manfaat biaya saluran irigasi B.Lt-9. Nilai
manfaat biaya (benefit cost ratio) adalah nilai perbandingan
antara nilai manfaat yang diperoleh dengan total pembiayaan.
Daerah irigasi Logung memiliki 3 kali masa tanam dalam
setahun dengan pola tanam padi-padi-palawija. Daerah irigasi ini
memiliki produktivitas padi 7,5 ton/Ha dan produktivitas palawija
5 ton/Ha. Nilai manfaat biaya saluran B.Lt-9 sebelum
ii
perencanaan PLTMH dengan keuntungan berupa hasil panen
sawah adalah 66,7.
Dengan debit andalan sebesar 0,209 m3/detik dan tinggi
jatuh efektif 4,845 meter serta menggunakan turbin Crossflow SJWG-
20/6.6, pemanfaatan got miring sebagai PLTMH berpotensi
menghasilkan daya sebesar 7,956 kW. Nilai manfaat biaya
PLTMH dengan keuntungan hasil penjualan energi listrik sebesar
64062,295 kWh selama satu tahun adalah 1,01. Sedangkan nilai
manfaat biaya saluran setelah perencanaan PLTMH adalah
sebesar 60,28. Maka, dari hasil tersebut proyek PLTMH ini layak
secara ekonomi. ===== Micro hydro power plant is a small scale water power plant with a
capacity of power less than 100 kW. It utilizes the potential energy
of the falling water and convert it into electrical energy. Irrigation
canal B.Lt-9 in the Desa Pladen irrigate Logung irrigation area of
701 Ha. It has a chute that has different elevation of canal bottom
more or less 4,9 metres that is potential to build a micro hydro
power plant on it. Desa Pladen was having lack of energy due to a
lack of electricity supply from PLN. The construction of micro
hydro power plant on the canal can provide additional benefits on
chute and become an alternative solution to resolve the problem of
lack of electricity. It can give effect on the benefit cost ratio of the
irrigation canal B.Lt-9. Benefit cost ratio is the value of a
comparison between the value of the benefits obtained with total
financing.
Logung irrigation area has 3 times of growing season in a year
with the planting patterns of rice-rice-beans. The benefit of canal
is from harvesting rice with the rice productivity is 7.5 tons/Ha and
corn productivity is 5 ton/Ha. Benefit cost ratio of the canal B.Lt-
9 before utilization of chute is 66,7.
The power plant is designed using 0,209 m3/s of flow discharge,
4,845 m of net head, and Crossflow turbine SJ-WG-8/6.6. It can
potentially generate power of 7,956 kW. Benefit cost ratio of micro
hydro power plant which is has benefit from selling 64062,295 kWh
a year of electrical energy is 1,01. While the benefit cost ratio of the canal after the utilization of chute as micro hydro power plant
is 60.28. Thus, the micro hydro power plant project is economically
feasible.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Got miring, nilai manfaat biaya, pembangkit listrik tenaga mikro hidro, saluran irigasi, Benefit cost ratio, chute, irrigation canals, micro-hydro power plant
Subjects: T Technology > TJ Mechanical engineering and machinery > TJ164 Power plants--Design and construction
Divisions: Faculty of Civil Engineering and Planning > Civil Engineering > 22201-(S1) Undergraduate Thesis
Depositing User: - Davi Wah
Date Deposited: 03 Jan 2017 04:27
Last Modified: 27 Dec 2018 04:34
URI: http://repository.its.ac.id/id/eprint/1267

Actions (login required)

View Item View Item